A Groundwork company - serving Los Angeles, CA
Groundwork Construction Co. of Los Angeles construction team

ADU Contractors Near Me in Los Angeles - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

ADU Contractors in Los Angeles Who Don’t Hand Off the Hard Parts

You’re looking for ADU contractors near you in Los Angeles, and the ones worth calling are the ones who carry the full scope in-house: structural, fire-zone detailing, drainage and grading, all under one contract. That matters more here than almost anywhere, because a winter atmospheric river rolling across fire-scarred slopes above Tarzana or Altadena doesn’t care whose subcontract lapsed. The contractor who engineered drainage and grading into the foundation scope is the only one without an excuse ready when the hill starts moving. ADU construction in Los Angeles runs $106,200-$259,600 for a detached unit, and complex hillside lots push toward the top of that range. Call Groundwork Construction Co. of Los Angeles at (888) 427-1733 for a free project estimate and design consult, and a live person answers around the clock.

Why LA Backyard Projects Stall, and How One Contract Fixes It

Most ADU delays we see don’t come from slow carpenters. They come from gaps between trades. The grading contractor blames the engineer, the engineer points at the soils report, and the homeowner spends three months as an unpaid project manager. On a hillside parcel in the Hollywood Hills or the Santa Monica Mountains, that finger-pointing costs real money once the dry season closes.

Our answer is simple: one contract, one accountable scope. Prelim grading, pier-and-grade-beam foundation engineering tied to the parcel’s specific soil report, utility upgrades, framing, roofing, and finish all live under the same agreement. That’s what “from foundation to finish line” actually means on a steep infill lot. The engineering is priced in from day one, not discovered as a surprise change order after demo exposes something nobody looked at.

Los Angeles construction answers to some of the strictest seismic and fire-zone rules in the country, and ADUs sit right in the middle of that web. Hillside grading rules, WUI fire code, and the city’s earthquake-retrofit legacy all shape what a backyard structure has to be. Our technicians bring up to 12 years of experience to that puzzle, and the work is backed by the 730-Day Done Right Promise: if it’s not done right, we make it right.

The Weather Window Nobody Puts in Their Timeline

LA’s Mediterranean climate gives you a narrow construction window on a steep lot. Dry-season grading and foundation work have to be complete and covered before the first significant rain. Miss it, and you’re looking at exposed slopes, erosion, and potentially a debris-flow problem on ground that burned in a recent fire season. We build the schedule backward from that rain date, not forward from a sales pitch.

That’s a first-hand planning reality most ADU specialists leave out of their proposals. Here’s what a realistic pre-construction sequence looks like on a tight LA lot:

  • Soils and slope review before design. Pier-and-grade-beam requirements get identified up front from the parcel’s soil report, not after the excavator shows up.
  • Utility assessment on the original house. On the flats, 1920s-40s Craftsman and Spanish Colonial bungalows often carry sewer laterals and electrical services that can’t support a new dwelling without an upgrade. We find that during assessment, not after the permit’s pulled.
  • Grading and drainage locked into the foundation scope. Retaining, swales, and slope protection get engineered as part of the structure, so winter runoff has somewhere to go.
  • Dry-season foundation, then cover. The concrete and framing get scheduled to close up before the rain window, with weather contingencies built into the calendar.

This is the kind of planning you’ll find covered in more depth on our Home Additions & ADU in Los Angeles page, which walks through the difference between an infill-lot build and a hillside one.

Fire-Zone Roofing and Materials Spec’d Right the First Time

ADU roofs in the hills sit in the wildland-urban interface, and that changes the materials conversation. Class A, ember-resistant assemblies aren’t a nice upgrade there; they’re what LAFD plan check is going to ask about. We spec GAF and Owens Corning roofing systems from the start, which means your plan check doesn’t stall while someone re-specs the roof mid-review.

Material partnerships run across every trade we touch, from KraftMaid and Cambria in kitchens to Andersen and Pella for windows. On an ADU, that curated list matters because you’re outfitting a whole dwelling at once. Choosing quality you can verify beats grabbing whatever’s in stock, and the difference shows up 15 years later when the windows still seal and the roof still holds.

ADU line item Typical Los Angeles range
Detached ADU construction $106,200-$259,600
Garage conversion $35,400-$94,400
Home addition $53,100-$153,400

The 730-Day Promise on a Structure That Takes a Beating

A detached backyard unit in Los Angeles isn’t sheltered by the main house. It takes full thermal cycling, Santa Ana wind stress, and seasonal soil movement on its own. Two full years of covered workmanship – the 730-Day Done Right Promise – is meaningful protection on that kind of exposure, and most ADU contractors simply don’t put it in writing.

Process matters too. Every technician on your project is background-checked and arrives in uniform, and calls get answered by a live person 24/7 – no voicemail, no waiting until Monday. Pricing is upfront, so the number you see is the number you pay. That pairs with 0% financing for 18 months and $1,000 off projects over $10,000, which helps when a full ADU build lands north of six figures.

If you want the broader picture of how an ADU fits into a larger property plan, start with our Home Additions & ADU overview and work from there. When you’re ready to talk specifics, our home page lays out the full range of what we build across Los Angeles.

Frequently Asked Questions

Get Your ADU Planned Before the Rain Does It For You

The dry season is your window, and it’s worth planning around now. Groundwork Construction Co. of Los Angeles brings full-scope ADU building – engineering, grading, framing, roofing, and finish under one accountable contract – backed by the 730-Day Done Right Promise. Call (888) 427-1733 for a free estimate and design consult. A live person answers around the clock, and upfront pricing means no surprises.

Written by the team at Groundwork Construction Co. of Los Angeles, serving Los Angeles, CA.

What Our Customers Say

★★★★★ 4.8 from 4+ reviews

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

- Keisha Robinson

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

- Dev Sharma

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

- Robert Sullivan
Need Construction help in Los Angeles? Licensed & insured · free written estimates
Call (888) 427-1733

Request a Free Estimate

Tell us what's going on in Los Angeles. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch