Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
PGT Home Additions & ADU: The Los Angeles Owner’s Guide
If your PGT-specified addition or ADU is showing movement, moisture, or hardware failure, we install and rebuild these assemblies across Los Angeles with PGT-rated components, and whole-scope additions in the city typically run $53,100 – $153,400 depending on square footage and foundation conditions. Detached ADU builds land between $106,200 and $259,600, while garage conversions run $35,400 – $94,400. This isn’t a part you order off a shelf and swap in an afternoon; it’s a system of rated modules and hardware that has to meet California code and Los Angeles inspection. Owners usually discover the failure the same way: a door that suddenly won’t latch square, a hairline crack that grows along a header seam, or a window unit in the addition that starts whistling in the Santa Ana winds. Call (888) 427-1733 for a free estimate and we’ll tell you exactly what’s failing before any work starts.
Which PGT Models This Applies To
PGT produces impact-rated window and door assemblies for additions and ADU envelopes across several product families, and the correct replacement depends on which series was specified on your original plans. Start with the certification label on the glass or frame edge; it lists the series, the design pressure rating, and the impact classification. That label is your compatibility key. A unit rated for 30 psf cannot substitute for one rated at 50 psf without re-engineering the opening, and Los Angeles plan checkers will flag the mismatch on a re-inspection. This is the gotcha that costs owners the most time: matching the look of a unit while ignoring its DP rating, then failing the field inspection. On the OEM-versus-aftermarket decision, PGT-branded replacements keep your original engineering and warranty intact. Quality aftermarket equivalents can work when the series-matched rating is documented in writing, but you’ll want that documentation attached to the permit file. We treat Groundwork Construction Co. of Los Angeles as an independent service provider; we are not affiliated with PGT, and we don’t claim to be. Your material brands across the rest of the build, from KraftMaid, Cambria, and Silestone inward, follow the same rule: match the spec, document it, and keep the paperwork with the home.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your PGT Home Additions & ADU Is Failing
An addition doesn’t fail all at once. It fails at its connections, in the materials that move, and in the hardware that takes daily use. Here’s what Los Angeles owners actually see, and what’s underneath it.
- Doors and windows out of square in the addition. A unit that suddenly won’t latch or drags along one edge usually signals header deflection or foundation movement, not a bad lock.
- Water staining at seams and window perimeters. Failed sealant and flashing let Los Angeles winter rain in behind the PGT frame, and the damage shows up as soft drywall weeks later.
- Condensation or whistling inside impact glass units. Sealed-glass fogging means the unit has lost its seal, and air infiltration points to a gasket or frame-to-opening gap that’s opened up with settlement.
- Hairline cracks at wall-to-ceiling seams and around openings. These track seasonal soil movement common in older Los Angeles lots, and they widen when a foundation repair was never addressed under the addition.
- Sagging roofline or step cracks in exterior stucco. This is the serious one; a roofline that has dropped or stucco cracking in a stair-step pattern means the framing or foundation needs evaluation by a licensed professional before anything cosmetic gets patched.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Los Angeles, a whole-scope home addition runs $53,100 – $153,400, an ADU build runs $106,200 – $259,600, and a garage conversion runs $35,400 – $94,400. If you’re replacing a failed envelope component rather than the whole addition, window replacement in Los Angeles runs $5,310 – $17,700, and impact window installation runs $9,440 – $29,500. What drives the number: foundation type and soil conditions, square footage, roof complexity, and whether the opening needs re-engineering for a correct DP rating. Every bid is itemized, parts and labor broken out separately, so you see the hardware, the rated units, and the install cost as their own lines. Our 730-Day Done Right Promise covers the workmanship for two years, longer than most residential guarantees in the market. Call (888) 427-1733 for a free estimate on your Los Angeles addition.
DIY or Call Us?
Here’s the honest split. You can safely check the certification Label on the glass, photograph any crack or stain, measure the opening, and note the date each symptom started; that information makes our first visit faster. What you should not do is reseal a leaking perimeter and call it fixed, or try to reframe an out-of-square opening on a structure whose load path you haven’t inspected. That work touches the structural integrity of your addition and, in Los Angeles, requires permits and inspections that an unpermitted patch will fail. We’d rather see it once and tell you the truth. Call (888) 427-1733, and a live person will answer, any hour, any day.
FAQs
Expect 20 to 30 years from a properly installed PGT impact unit, but Los Angeles conditions shorten that: our coastal salt air and the airborne grit in the Santa Ana winds wear seals and gaskets faster than a sheltered inland install. If you’re seeing fogging, whistling, or water staining, call (888) 427-1733 for a free inspection before the failure grows into drywall work.
Yes, in many cases. If the failure is a single window unit, flashing, sealant, or hardware, we often repair it rather than tear out the addition. If the failure is foundation settlement or header deflection, repair is the right answer but the scope is structural, not cosmetic.
Most single-unit replacements in a Los Angeles addition are finished in a single visit. Whole-addition rebuilds run longer and depend on permit timeline; we pull the permits and schedule the inspections, and we give you the timeline in writing before the first truck arrives.
We start from the certification label and the series printed on your glass or frame, then spec the replacement to match its DP rating and impact class. We document the match in writing and attach it to the permit file so the Los Angeles inspector has it on hand. Call (888) 427-1733 for an exact quote; estimates are free.
Written by the team at Groundwork Construction Co. of Los Angeles, serving Los Angeles and nearby areas.