Full Bathroom Remodeling in Marina del Rey: What It Costs and How Long It Takes
Full bathroom remodeling in Marina del Rey runs $9,000 to $28,000 for a single bathroom, and most jobs are finished in 3 to 5 weeks from demo day to final inspection. That range covers new tile, a new shower or tub, vanity, lighting, paint and finish work. Where you land inside it depends on the size of the room, whether the plumbing moves, and how deep into the wall we have to go on a 1960s or 1970s building. Call (888) 427-1733 for a free on-site estimate.
How We Run a Full Bath Remodel, Stage by Stage
Full bathroom remodeling is a sequence, not a pile of trades showing up whenever they feel like it. Here is exactly what happens, in order, and what you’ll be deciding along the way.
Day 1: Site protection and demo
We lay floor protection through the path to the bathroom and seal off the room with plastic and zipper doors so dust stays contained. Demo takes one to two days on a typical Marina del Rey condo bathroom: tile off the walls, tub or shower pan out, vanity and toilet out, back to studs where the plan calls for it. You’ve already picked your tile and fixture package by then, because lead times on Kohler and similar brands can run two to four weeks on made-to-order pieces.
Days 2 – 4: Rough-in, framing and the inspection
Plumbing and electrical get reworked here. We move a drain, add a dedicated circuit for a heated floor or a quieter bath fan, sister a rotted stud if we find moisture damage. A building inspector looks at rough-in before anything closes up. In Marina del Rey’s mid-rise buildings, this is also the stage where we confirm in-wall shutoffs and how we’re tying into the stack.
Days 5 – 7: Waterproofing and board
Cement board, then a bonded sheet or liquid waterproofing membrane through the wet zone, with the seams and corners taped and detailed. This is the part no one sees and the part that decides whether you have a water problem in 2030. Inspector again on the pan test if the job requires it.
Days 8 – 15: Tile and finish carpentry
Tile set on walls and floor, grout, then trim, door, vanity set, mirror and lighting. You approve grout color and layout on day one of tile, not the morning it goes down.
Days 16 – 21: Fixtures, glass and final punch
Toilet set, shower trim and glass installed, plumbing hooked up and tested, paint touched in. Final walkthrough with you, punch list written on the spot. On a condo with building shutdowns or a slow elevator, add a week. Every job is covered by our 730-Day Done Right Promise, so if something isn’t right six months in, we come back.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
- Tile material: Porcelain is the practical default here. It shrugs off the damp, cleans easily and costs less than natural stone. Marble and limestone look richer but they’re softer, they etch, and in a bathroom with a marine-layer humidity problem they need sealing on a schedule. Expect tile to swing the budget by $1,500 – $4,000 depending on which way you go.
- Shower base vs. curbless: A standard pan keeps cost down. A curbless, fully waterproofed shower with a linear drain costs more but reads newer and is easier to get in and out of. It means recessing or sloping the floor, which is real labor.
- Vanity and countertop: A stock vanity off the shelf versus a semi-custom KraftMaid unit is a $1,000 – $3,000 difference. Quartz holds up to moisture and cosmetics far better than marble.
- Fixtures: A basic chrome shower trim versus a thermostatic Kohler valve is $400 versus $1,200 and up. The thermostatic valve stops the temperature swing when someone flushes a toilet.
- Ventilation: A plain fan versus a humidity-sensing fan is $150 against $350 and it matters here. Without good exhaust, marine damp condenses on cold walls and grout lines, and you’ll be regrouting in three years.
- Heated floor: Adds $800 – $2,000 installed. Worth it on a cold-framed floor over an unheated garage or in a unit with single-pane glass.
What Full Bathroom Remodeling Costs in Marina del Rey, CA
The number for a full bathroom remodel here is $9,000 to $28,000, and it’s best to know which end you’re aiming for before the estimate.
- Room under 40 square feet, no layout change, stock materials: $9,000 – $14,000
- Standard hall or primary bath, tile shower, new vanity: $15,000 – $22,000
- Larger primary bath, moved plumbing, premium tile and fixtures: $23,000 – $28,000
Four things push you toward the top. The first is size: a 5×8 hall bath and a 10×12 primary bath aren’t the same job. The second is existing condition, and in this market that’s the big one. We open a wall in a 1972 building and sometimes find galvanized supply lines or a cast iron drain that’s past its life, and that’s a real cost to fix. The third is relocation: moving the toilet or shower drain across the floor means cutting concrete in a slab building or running new pipe through joists in a wood-frame building. The fourth is material grade and permit scope, because a structural change or a new window adds inspection and fees.
A written estimate itemizes demo, rough-in, waterproofing, tile labor, fixtures, materials, permits and cleanup. What it typically doesn’t include is concealed damage found behind the wall, structural repair, or asbestos abatement in very old buildings, and we flag those separately rather than surprise you mid-job. Our pricing is upfront, no surprises: the number you see is the number you pay unless the scope changes with your approval. Calls are answered by a live person, 24/7.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey Homes Do to This Job
Nearly every full bathroom remodel we do here is a waterfront-adjacent job, and the coastal environment changes the spec. Salt-laden air rolls off the water nightly and attacks metal fasteners, hinges, shower trim and vent grilles. Inside a 1960s or 1970s mid-rise, the marine layer also leaves condensation on cold-framed walls, so we spec moisture-resistant board, seal penetrations carefully and don’t skip the exhaust fan. That housing stock is most of what we work on: aging envelopes with original plumbing in the condo complexes along Admiralty Way, plus newer high-rise and townhome infill. The older units are where we most often find failing shutoffs and slow drains. Low-slope roofs and wide eaves trap moisture too, which is why homeowners often pair a bathroom job with Roof Repair in Marina del Rey when a ceiling stain shows up. Complexes on Washington Boulevard and near the marina often have HOA rules on work hours, elevator use and trash, so we plan around those from the first visit. Permits come from LA city Building and Safety, and if the unit sits in a coastal zone there may be additional review. If you’re going wider than one bathroom, Bathroom Remodeling in Marina del Rey covers the broader scope.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Bathroom Remodeling in Marina del Rey
Three to five weeks is typical, with most jobs landing around four. Condo buildings with work-hour restrictions or elevator scheduling can add a week. Call (888) 427-1733 and we’ll give you a realistic schedule after seeing the room.
Yes, if the work involves plumbing, electrical or structural changes, which most full remodels do. Cosmetic-only work like paint and tile replacement over existing board often doesn’t. We pull permits and pass inspections, and we handle that scheduling for you.
Yes, and keeping the toilet, shower drain and supply lines where they are is the single easiest way to hold the budget down. Changing the layout is possible, especially on a wood-frame floor, but it adds cost and inspection. Call (888) 427-1733 to talk through what your room allows.
Between $9,000 and $28,000, with most jobs in the $15,000 – $22,000 range. Size, existing plumbing condition, material grade and layout changes move the number. Estimates are free and written line by line.
Our 730-Day Done Right Promise covers workmanship for two full years after completion, and if it’s not done right we make it right. Call for the full terms on your project.
Get a Free Estimate on Your Marina del Rey Bathroom
Call (888) 427-1733 to schedule a free on-site estimate for full bathroom remodeling in Marina del Rey. We walk the room, check the plumbing and framing, talk through your material choices and hand you a written line-item quote. No change orders, no vague numbers, and 0% financing for 18 months plus $1,000 off projects over $10,000 if you decide to move forward. Our Bathroom Remodeling service covers the full scope, and you can see the wider Marina del Rey area we work in. Considering a bigger envelope change down the line? Homeowners often pair this with Roof Replacement & Installation in Marina del Rey or a modern ADU option from Abodu or Mighty Buildings.
Written by the team at Groundwork Construction Co.