A Groundwork company - serving Los Angeles, CA
Full Bathroom Remodeling in Marina del Rey, CA | Groundwork Construction Co. of Los Angeles

Full Bathroom Remodeling in Marina del Rey - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Marina del Rey: What It Costs and How Long It Takes

Full bathroom remodeling in Marina del Rey runs $9,000 to $28,000 for a single bathroom, and most jobs are finished in 3 to 5 weeks from demo day to final inspection. That range covers new tile, a new shower or tub, vanity, lighting, paint and finish work. Where you land inside it depends on the size of the room, whether the plumbing moves, and how deep into the wall we have to go on a 1960s or 1970s building. Call (888) 427-1733 for a free on-site estimate.

Call (888) 427-1733

How We Run a Full Bath Remodel, Stage by Stage

Full bathroom remodeling is a sequence, not a pile of trades showing up whenever they feel like it. Here is exactly what happens, in order, and what you’ll be deciding along the way.

Day 1: Site protection and demo

We lay floor protection through the path to the bathroom and seal off the room with plastic and zipper doors so dust stays contained. Demo takes one to two days on a typical Marina del Rey condo bathroom: tile off the walls, tub or shower pan out, vanity and toilet out, back to studs where the plan calls for it. You’ve already picked your tile and fixture package by then, because lead times on Kohler and similar brands can run two to four weeks on made-to-order pieces.

Days 2 – 4: Rough-in, framing and the inspection

Plumbing and electrical get reworked here. We move a drain, add a dedicated circuit for a heated floor or a quieter bath fan, sister a rotted stud if we find moisture damage. A building inspector looks at rough-in before anything closes up. In Marina del Rey’s mid-rise buildings, this is also the stage where we confirm in-wall shutoffs and how we’re tying into the stack.

Days 5 – 7: Waterproofing and board

Cement board, then a bonded sheet or liquid waterproofing membrane through the wet zone, with the seams and corners taped and detailed. This is the part no one sees and the part that decides whether you have a water problem in 2030. Inspector again on the pan test if the job requires it.

Days 8 – 15: Tile and finish carpentry

Tile set on walls and floor, grout, then trim, door, vanity set, mirror and lighting. You approve grout color and layout on day one of tile, not the morning it goes down.

Days 16 – 21: Fixtures, glass and final punch

Toilet set, shower trim and glass installed, plumbing hooked up and tested, paint touched in. Final walkthrough with you, punch list written on the spot. On a condo with building shutdowns or a slow elevator, add a week. Every job is covered by our 730-Day Done Right Promise, so if something isn’t right six months in, we come back.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

  • Tile material: Porcelain is the practical default here. It shrugs off the damp, cleans easily and costs less than natural stone. Marble and limestone look richer but they’re softer, they etch, and in a bathroom with a marine-layer humidity problem they need sealing on a schedule. Expect tile to swing the budget by $1,500 – $4,000 depending on which way you go.
  • Shower base vs. curbless: A standard pan keeps cost down. A curbless, fully waterproofed shower with a linear drain costs more but reads newer and is easier to get in and out of. It means recessing or sloping the floor, which is real labor.
  • Vanity and countertop: A stock vanity off the shelf versus a semi-custom KraftMaid unit is a $1,000 – $3,000 difference. Quartz holds up to moisture and cosmetics far better than marble.
  • Fixtures: A basic chrome shower trim versus a thermostatic Kohler valve is $400 versus $1,200 and up. The thermostatic valve stops the temperature swing when someone flushes a toilet.
  • Ventilation: A plain fan versus a humidity-sensing fan is $150 against $350 and it matters here. Without good exhaust, marine damp condenses on cold walls and grout lines, and you’ll be regrouting in three years.
  • Heated floor: Adds $800 – $2,000 installed. Worth it on a cold-framed floor over an unheated garage or in a unit with single-pane glass.

What Full Bathroom Remodeling Costs in Marina del Rey, CA

The number for a full bathroom remodel here is $9,000 to $28,000, and it’s best to know which end you’re aiming for before the estimate.

  • Room under 40 square feet, no layout change, stock materials: $9,000 – $14,000
  • Standard hall or primary bath, tile shower, new vanity: $15,000 – $22,000
  • Larger primary bath, moved plumbing, premium tile and fixtures: $23,000 – $28,000

Four things push you toward the top. The first is size: a 5×8 hall bath and a 10×12 primary bath aren’t the same job. The second is existing condition, and in this market that’s the big one. We open a wall in a 1972 building and sometimes find galvanized supply lines or a cast iron drain that’s past its life, and that’s a real cost to fix. The third is relocation: moving the toilet or shower drain across the floor means cutting concrete in a slab building or running new pipe through joists in a wood-frame building. The fourth is material grade and permit scope, because a structural change or a new window adds inspection and fees.

A written estimate itemizes demo, rough-in, waterproofing, tile labor, fixtures, materials, permits and cleanup. What it typically doesn’t include is concealed damage found behind the wall, structural repair, or asbestos abatement in very old buildings, and we flag those separately rather than surprise you mid-job. Our pricing is upfront, no surprises: the number you see is the number you pay unless the scope changes with your approval. Calls are answered by a live person, 24/7.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Marina del Rey Homes Do to This Job

Nearly every full bathroom remodel we do here is a waterfront-adjacent job, and the coastal environment changes the spec. Salt-laden air rolls off the water nightly and attacks metal fasteners, hinges, shower trim and vent grilles. Inside a 1960s or 1970s mid-rise, the marine layer also leaves condensation on cold-framed walls, so we spec moisture-resistant board, seal penetrations carefully and don’t skip the exhaust fan. That housing stock is most of what we work on: aging envelopes with original plumbing in the condo complexes along Admiralty Way, plus newer high-rise and townhome infill. The older units are where we most often find failing shutoffs and slow drains. Low-slope roofs and wide eaves trap moisture too, which is why homeowners often pair a bathroom job with Roof Repair in Marina del Rey when a ceiling stain shows up. Complexes on Washington Boulevard and near the marina often have HOA rules on work hours, elevator use and trash, so we plan around those from the first visit. Permits come from LA city Building and Safety, and if the unit sits in a coastal zone there may be additional review. If you’re going wider than one bathroom, Bathroom Remodeling in Marina del Rey covers the broader scope.

Serving Marina del Rey, CA – Our Local Coverage Area

We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Marina del Rey

Get a Free Estimate on Your Marina del Rey Bathroom

Call (888) 427-1733 to schedule a free on-site estimate for full bathroom remodeling in Marina del Rey. We walk the room, check the plumbing and framing, talk through your material choices and hand you a written line-item quote. No change orders, no vague numbers, and 0% financing for 18 months plus $1,000 off projects over $10,000 if you decide to move forward. Our Bathroom Remodeling service covers the full scope, and you can see the wider Marina del Rey area we work in. Considering a bigger envelope change down the line? Homeowners often pair this with Roof Replacement & Installation in Marina del Rey or a modern ADU option from Abodu or Mighty Buildings.

Written by the team at Groundwork Construction Co.

Why Marina del Rey Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full bathroom remodeling in Marina del Rey.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Marina del Rey

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Marina del Rey Customers Say

Trusted by homeowners across Marina del Rey and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Marina del Rey?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Marina del Rey.

(888) 427-1733

Request a Free Estimate in Marina del Rey

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch