A Groundwork company - serving Los Angeles, CA
Small Bathroom Remodels in Santa Monica, CA | Groundwork Construction Co. of Los Angeles

Small Bathroom Remodels in Santa Monica - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Small Bathroom Remodels in Santa Monica, CA: What to Expect

Small bathroom remodels in Santa Monica typically run $9,000 – $28,000 for a focused scope, and most of these jobs finish in three to five weeks once the permit clears the city. A compact full bath, a powder room, or a tight hall bath under 50 square feet is usually a $5,000 – $12,000 job when you keep the plumbing where it is. Call (888) 427-1733 and we’ll come measure, check the existing condition, and put a real number in writing.

Call (888) 427-1733

How we take a small Santa Monica bathroom from demo to done

Small bathrooms go faster than big ones, but the sequence doesn’t change. Here’s how a compact Santa Monica job actually runs.

Stage 1: Measure, scope, and set the line (days 1 – 3)

We walk the room, confirm what’s staying and what’s going, and check the existing plumbing and electrical against what you want. This is where you decide your fixture and finish direction so nobody’s waiting on a backorder mid-job. We also flag anything that will need a permit before we touch a wall.

Stage 2: Demo and rough-in (days 3 – 7)

Out comes the old tile, vanity, toilet, and tub or shower. We open the walls enough to inspect the supply lines and drain, and we fix what’s corroded or undersized. If you’re moving a drain or adding a circuit, this is the window. Inspection happens here, before anything gets closed up.

Stage 3: Waterproofing and substrate (days 7 – 10)

New cement board, a proper waterproof membrane, and a flooded shower pan where a shower is in scope. This stage is invisible when it’s done and it’s the whole ballgame for how the room holds up. Skipping or shortcutting it is where cheap remodels fail in two years.

Stage 4: Tile, glass, and finishes (days 10 – 18)

Tile set, grout, glass template and install, vanity and counter, toilet reset, trim, and paint. You’ll pick grout and caulk color before tile goes down and lock your glass spec before template day.

Stage 5: Punch and walkthrough (days 18 – 21)

We run water and check for leaks, test every fixture, clean up, and walk the room with you line by line. Anything on the list gets fixed before we call it done. The whole job is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually change a small bathroom

A compact bath forces good decisions because there’s less room for error. Here’s what you’re picking between, and what each choice costs you in money or upkeep.

  • Tile material and size: Large-format porcelain reads cleaner in a small room and has fewer grout lines to scrub. Smaller mosaic tile costs more in labor and looks busier, but it grips better underfoot on a shower floor. Budget $1,200 – $4,000 in materials depending on grade and coverage.
  • Vanity and top: A stock vanity in the $800 – $3,000 range is the fast, honest choice for a compact bath. Custom cabinetry is a different project. Quartz tops handle moisture better than marble in a steamy room.
  • Flooring: Porcelain tile is what we install most. Luxury vinyl plank is cheaper and warmer underfoot but won’t survive a real leak the same way. Tile is the safer long play in a bathroom that sees daily use.
  • Ventilation: A properly sized exhaust fan is not optional in a Santa Monica bathroom. It’s cheap insurance against the mold that comes with a small room and a lot of shower steam.
  • Fixture brands: We work with Kohler and other trusted partners, so you’re picking quality rather than whatever’s on the shelf.

What Small Bathroom Remodels cost in Santa Monica, CA

Plan on $5,000 – $12,000 for a compact bath that keeps its plumbing layout, and $9,000 – $28,000 once you’re into a fuller small-bath remodel with a shower rebuild, new tile throughout, and a vanity and counter. Here’s what pushes a job to either end.

  • Size and layout: A powder room is the low end. A hall bath with a shower and tub is the middle. Changing the footprint adds cost fast.
  • Existing condition: Old cast iron drain, corroded supply lines, or a hidden water leak means extra demo and repair.
  • Plumbing or electrical moves: Keeping the toilet and shower where they are saves real money. Relocating a drain or adding a circuit pushes the number up.
  • Material grade: Builder-grade tile versus a premium porcelain or stone look is a $2,000 – $4,000 swing on a small bath.
  • Permit scope: Cosmetic work may not need a permit. Anything structural or swapped plumbing does, and that adds time and inspection fees.

Every estimate we write is a line-item quote with upfront pricing, so the number you see is the number you pay. No change-order surprises halfway through.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Santa Monica homes specifically do to this job

Santa Monica’s housing stock shapes small bathroom work more than the size of the room does. South of Wilshire and through Ocean Park, we’re often in 1920s – 40s Spanish and Craftsman bungalows where the “small bathroom” is genuinely small and the plumbing is original. East of there, along Lincoln and Pico, the stock shifts to 1960s – ’70s wood-frame buildings, and those bathrooms are frequently mid-century updates that were never done to current code. We see it in 90404 and 90401 constantly: undersized venting, corroded galvanized supply lines, and tile set on drywall with no waterproofing. Up in the 90402 flats north of Montana the work is different, larger homes where the small bath is a secondary bathroom getting a quality refresh.

The coastal zone matters too. If you’re near the beach, a bathroom remodel can require Coastal Commission review on top of the city permit, and Santa Monica’s plan-check can run slow. Marine-layer salt air also corrodes metal fixtures, fasteners, and venting faster than inland, so we spec finishes that hold up. If your project grows into the wider scope, it’s part of a full Bathroom Remodeling in Santa Monica plan, and homeowners often pair the work with Specialty Roofing in Santa Monica when the venting or roof above the bath needs attention. We cover the whole of Santa Monica and the neighborhoods around it.

Serving Santa Monica, CA – Our Local Coverage Area

We serve Santa Monica and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Small Bathroom Remodels in Santa Monica

Get a free estimate on your Santa Monica small bathroom remodel

We’ll come to your Santa Monica home, measure the room, check the existing plumbing and venting, and give you a written line-item estimate with upfront pricing – no surprises. A live person answers the phone around the clock. Call (888) 427-1733 to schedule your free on-site estimate and design consult, and we’ll walk you through exactly what your small bathroom remodel takes.

Written by the team at Groundwork Construction Co. of Los Angeles.

Why Santa Monica Chooses Groundwork Construction Co. of Los Angeles

We set the standard for small bathroom remodels in Santa Monica.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Santa Monica

Getting your small bathroom remodels project started is simple.

1

Call or Request a Free Estimate

Tell us about your small bathroom remodels project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local small bathroom remodels pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

Trusted by homeowners across Santa Monica and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Small Bathroom Remodels in Santa Monica?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Santa Monica.

(888) 427-1733

Request a Free Estimate in Santa Monica

Tell us about your small bathroom remodels needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch