Driveway & pavers
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Manhattan Beach, CA: What to Expect
Concrete driveway installation in Manhattan Beach runs $4,500 to $12,000 for most single-car and narrow two-car pours on the small coastal lots here, and the work itself takes three to five working days once the forms are set, plus cure time before you drive on it. The job includes demolition or excavation of the old surface, compacted base, formwork, any required inspection, the pour, and finish. Call (888) 427-1733 for a free on-site estimate.
How our team runs a Manhattan Beach concrete job, stage by stage
Concrete work fails in the prep, not in the pour. Here’s the sequence our technicians follow, and where you’ll be making decisions.
Stage 1: Walk-through and site survey (day 1)
We measure the apron, the slope from the garage threshold to the street, and the drainage path off the lot. On Manhattan Beach sand-adjacent streets the grading question matters most: water has to move to the street or to a footing drain, never toward the house. You decide the driveway width and where it flares at the sidewalk.
Stage 2: Demo, excavation, and base prep (day 1 to day 2)
We tear out the old slab or scoop the graded soil and haul it off in one trip. Then comes 4 to 6 inches of compacted aggregate base, laid in lifts and run with a plate compactor. Skipping lift compaction is the single most common reason a slab cracks inside two years. For a longer or wider driveway, the base takes most of a day on its own.
Stage 3: Forming, reinforcement, and inspection (day 2 to day 3)
Forms go up, wire mesh or rebar goes in, and we set the control-joint layout so cracks land where they’re supposed to. If your project needs a permit or a grading inspection, this is when it happens, and you’ll confirm the finish and joint pattern now. The city’s coastal zoning and lot coverage rules can affect what you’re allowed to place, so we check that before the pour, not after.
Stage 4: The pour and finish (day 3 or day 4)
We place the concrete, screed it, and cut or tool the joints. You’ll choose the surface at the estimate stage and confirm the color or finish before we pour: broom, exposed aggregate, or a plain float. Curing begins immediately after finishing.
Stage 5: Cure and walk-through (day 4 through day 7)
Keep vehicles off the new slab for about 7 days, and keep heavy loads off longer if the weather is cool and damp. Concrete reaches most of its structural strength in 28 days. We do a final walk-through once it’s cured and walk you through any joint or finish care.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll weigh before we pour
A driveway is a several-decade decision. These are the choices that matter for a Manhattan Beach pour, with the honest trade-offs.
- Plain broom-finished concrete – the most budget-friendly option, roughly $4,500 – $8,000 for a typical lot here. Slippery when wet, so it’s not ideal on a steep Coastal slope, but easy to maintain.
- Exposed aggregate – adds grit underfoot and hides small surface flaws well in coastal conditions. It costs more and the finish is harder to touch up later.
- Standard 4-inch slab vs. 5- to 6-inch reinforced slab – the thicker, reinforced pour costs more upfront but is the right call for a heavier vehicle or a driveway that sees a lot of turning load.
- Drainage design – a slight crown or a channel drain at the apron keeps runoff off the foundation. On lots without much fall, drainage planning pushes the price up, but skipping it is a shortcut you’ll pay for later.
- Concrete mix – a 4,000 psi mix (rather than a basic 2,500 psi pour) is the baseline we recommend for driveways exposed to salt air and winter storms.
Where a masonry or prep product is part of the plan, Sakrete makes reliable bagged mixes and repair materials that hold up in coastal conditions.
What Concrete Driveways & Concrete Work costs in Manhattan Beach, CA
Most Manhattan Beach concrete driveway projects fall in the $4,500 to $12,000 range, with a driveway replacement at $5,000 to $14,000 when full demolition and base rebuild are involved. A few variables push a job toward the high end:
- Size and access. A narrow single-car apron is cheaper than a 20-foot-wide two-car driveway, and tight lot access with limited truck-and-wheelbarrow room adds labor.
- Existing condition. Roots, settled soil, or a failed base need more excavation, which means more haul-off and more aggregate.
- Drainage and grading. A lot that needs regrading or a drain line to move water to the street costs more.
- Finish. Exposed aggregate and custom scoring price above a basic broom finish.
- Permits and inspection. A project that requires a permit or grading check adds a line item and a scheduling step.
A written, line-item estimate spells out the demolition, base, mix, finish, drainage, and permit scope. It doesn’t cover landscape repair beyond the work zone, or a separate drainage system for the lot. Every quote we give is upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Manhattan Beach homes do to a concrete job specifically
The surviving 1950s beach cottages on raised foundations across the Tree Section and the Sand Section often have a driveway on an old, shallow slab, and a partial rebuild rarely holds up next to new construction. Newer custom builds replacing them expect a driveway that meets the same precise sight lines as the house. Salt air and marine-layer humidity west of Highland and near the Strand speed up corrosion, which is why our technicians specify stainless or marine-grade fasteners and plain concrete over untreated steel edging. Winter storms concentrate rain into a few weeks and expose any drainage flaw. If this is part of a larger lot project, homeowners often pair it with our Driveway & Pavers in Manhattan Beach work, and you can see everything we offer under Driveway & Pavers or across our full Manhattan Beach coverage.
Serving Manhattan Beach, CA – Our Local Coverage Area
We serve Manhattan Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Concrete Driveways & Concrete Work in Manhattan Beach
Plan on three to five working days for demo, base prep, forming, and the pour, then keep vehicles off the slab for about 7 days of curing. A complicated grade or permit can stretch the schedule by a few days. Call (888) 427-1733 for a dated schedule on your lot.
If your driveway is just resurfacing, usually not. A new driveway or one that regrades the lot may fall under the city’s permitting and coastal zoning review, so we check before we start. We’re licensed and insured, and we pull permits and pass inspections where the scope requires it.
Yes. A standard driveway pour doesn’t touch the house’s plumbing or structure, and we only dig beyond the existing apron where the grade or a drain line requires it. If the job is part of a Garage Conversion ADU in Manhattan Beach or a New Detached ADU in Manhattan Beach, we coordinate the work so the driveway is poured after the structure.
Concrete driveway installation runs $4,500 to $12,000 and a full replacement runs $5,000 to $14,000, depending on size, finish, and drainage. Call (888) 427-1733 for an exact written quote. Estimates are free.
Every project we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s the workmanship guarantee, and our technicians have up to 12 years of experience on jobs like this. Call us with a question and a live person answers 24/7.
Get a free on-site estimate for concrete work in Manhattan Beach
Call (888) 427-1733 to schedule a free on-site estimate and design consult for Concrete Driveways & Concrete Work in Manhattan Beach. A background-checked, uniformed technician walks the lot with you, checks grades and drainage, and hands you a written, line-item quote you can trust. We also offer $1,000 off projects over $10,000 and 0% financing for 18 months. A live person answers, 24/7.
Written by the team at Groundwork Construction Co.