A Groundwork company - serving Los Angeles, CA
Full Kitchen Remodeling in Palos Verdes Estates, CA | Groundwork Construction Co. of Los Angeles

Full Kitchen Remodeling in Palos Verdes Estates - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Kitchen Remodeling in Palos Verdes Estates, CA: What It Involves and What It Costs

A full kitchen remodeling in Palos Verdes Estates, CA runs $14,000 – $45,000 for most homes and takes 6 to 10 weeks from demo to final inspection. The job means gutting the room to the studs, rebuilding the layout, replacing cabinets, counters, flooring, lighting, and plumbing fixtures, and pulling the permits the city requires before any of it starts. A kitchen that stays in its current footprint lands at the low end. Moving a wall, a gas line, or the sink lands at the high end. Call (888) 427-1733 and we’ll walk your kitchen and put real numbers in writing.

Call (888) 427-1733

How a Full Kitchen Remodel Actually Runs, Stage by Stage

Most contractors hand you a schedule and disappear. We’d rather you know exactly what each week looks like, because the decisions you make at week two change the price at week six. Here’s the real sequence.

Stage 1: Walk-through and written scope (days 1 – 5)

We measure the room, photograph the existing rough-in, and check what’s behind the drywall before we quote. On a 1960s Palos Verdes Estates rancher, that inspection often turns up undersized wiring or a drain line that won’t carry a modern layout. You get a line-item estimate with the number you’ll actually pay, and the 730-Day Done Right Promise attached to the workmanship. This is also where you decide the kitchen’s footprint: same walls, or open to the dining room.

Stage 2: Permits and design sign-off (days 5 – 25)

Permits in Palos Verdes Estates take longer than in most of the South Bay, and we plan for it in the schedule rather than pretend it won’t happen. You finalize cabinet door style, countertop edge, and appliance sizes in this window while the city reviews. Skipping this stage is how a remodel goes sideways at week eight.

Stage 3: Demo and rough-in (days 25 – 40)

Tear-out takes two to three days. Then the trades move in sequence: framing for any wall change, electrical, plumbing, and HVAC, each inspected before it’s closed up. You see the kitchen with no cabinets for about a week. It’s the messiest stretch and the one worth planning meals around.

Stage 4: Build-back and surfaces (days 40 – 62)

Drywall, paint, floor tile or hardwood, cabinet install, countertop template and fabrication, then the set. Countertop lead time is usually 7 – 12 days from template to install, so we template early to keep the room moving. Appliances go in last so nothing gets scratched during the work.

Stage 5: Final inspection and your punch walk (days 62 – 70)

The city inspects, we fix anything on your punch list, and you get a walk-through with the warranty in hand. If something isn’t right, we come back and make it right under the 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make (and What Each One Costs You)

You’ll make a few dozen decisions on a full kitchen. These are the ones that move the price and the ones you’ll live with daily.

  • Cabinetry grade: KraftMaid and comparably built lines give you plywood boxes and soft-close hardware that survive a coastal household. Cheaper particleboard boxes save $2,000 – $4,000 upfront and often need replacing before the warranty window closes.
  • Countertops: Cambria quartz resists moisture and staining, ideal near the salt air. Natural stone costs more and needs periodic sealing. Laminate is the cheapest and the least at home in a Palos Verdes Estates kitchen.
  • Open plan or keep the walls: Opening to the dining area is the most-requested change here, and it usually means a beam and structural review. That’s your single biggest price swing.
  • Appliance package: Standard-depth built-ins cost less; counter-depth and integrated units fit flush but add $1,500 – $4,000.
  • Flooring: Porcelain tile is the budget anchor and handles coastal humidity. Engineered hardwood warms the room and costs more. Both work; the trade-off is durability against your taste.
  • Lighting and outlets: Recessed, under-cabinet, and island pendants plus code-required GFCI on every counter run. The electrical layout is where we see the most upgrade requests after the fact.

What Full Kitchen Remodeling Costs in Palos Verdes Estates, CA

Most full kitchen remodels here land between $14,000 and $45,000, with the average job near the middle. A smaller kitchen remodel, if you’re keeping the walls and most of the layout, starts around $9,000 – $20,000. Here’s roughly how the money splits inside a full job:

Line item Typical range
Cabinets and installation $4,000 – $13,000
Countertops $2,000 – $6,500
Backsplash $800 – $2,500
Kitchen island $3,000 – $10,000
Fixtures, plumbing, electrical, flooring, labor Remainder of the $14,000 – $45,000 total

Four things push a job toward the high end: square footage, the condition of the walls and wiring behind the drywall, whether structural work is needed to open the room, and material grade. Moving the sink or range a few feet can add $1,500 – $3,000 in plumbing and gas work. A permit-heavy structural change can add several thousand more. Your written estimate lists every line so you see exactly where the number goes. What’s not included: failed inspection repairs on pre-existing unpermitted work, which we flag when we find it. Pair this with Full Bathroom Remodeling in Palos Verdes Estates if you’re tackling the back of the house at the same time.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Palos Verdes Estates Homes Do to a Kitchen Remodel

Palos Verdes Estates is a fully built-out city from the Olmsted Brothers’ 1920s master plan, meaning almost no new construction, almost all remodel, and a design overlay most contractors from neighboring cities underestimate. The city’s Art Jury and Planning Commission review exterior design changes, and while most interior kitchen work doesn’t trigger that review, any exterior door, window, or venting change does. We build to that standard because skipping it costs you weeks when the city catches it.

The housing stock is 1950s to 1970s ranchers and split-levels on big hillside lots, many with original wiring and drain lines that need attention once the cabinets come out. Marine-layer humidity and salt air from the Pacific eat exterior fasteners, which matters for any venting or exterior penetration we touch. On the downhill side of streets in the Valmonte and Lunada Bay areas, we check drainage before we move plumbing so a remodel doesn’t compound a slope issue. We cover all of Palos Verdes Estates, ZIP 90274, and know the inspection rhythm that comes with it.

Serving Palos Verdes Estates, CA – Our Local Coverage Area

We serve Palos Verdes Estates and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Kitchen Remodeling in Palos Verdes Estates

Get Your Free Estimate for Full Kitchen Remodeling in Palos Verdes Estates

Call (888) 427-1733 for a free on-site estimate. We’ll measure your kitchen, check what’s behind the walls, and put a fixed line-item price in front of you, with 0% financing for 18 months and $1,000 off projects over $10,000 available. The visit takes about an hour. You’ll know what your full kitchen remodeling costs before you commit to anything. Homeowners often pair this with Walk-In Showers & Shower Remodeling in Palos Verdes Estates to finish the whole back of the house. Reach the team at Groundwork Construction Co. of Los Angeles, and see our Kitchen Remodeling service for the wider scope, part of a full Kitchen Remodeling in Palos Verdes Estates if you want the broader overview.

Written by the team at Groundwork Construction Co.

Why Palos Verdes Estates Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full kitchen remodeling in Palos Verdes Estates.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Palos Verdes Estates

Getting your full kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Palos Verdes Estates Customers Say

Trusted by homeowners across Palos Verdes Estates and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Kitchen Remodeling in Palos Verdes Estates?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Palos Verdes Estates.

(888) 427-1733

Request a Free Estimate in Palos Verdes Estates

Tell us about your full kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch