A Groundwork company - serving Los Angeles, CA
Full Bathroom Remodeling in Malibu, CA | Groundwork Construction Co. of Los Angeles

Full Bathroom Remodeling in Malibu - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Malibu, CA: What It Costs and How Long It Takes

Full bathroom remodeling in Malibu runs $9,000 to $28,000 for most homes, and a typical full gut takes six to nine weeks from demolition to final inspection. That range covers a complete tear-out, new plumbing rough-in where needed, tile, vanity, fixtures, waterproofing, and paint. Bluff-edge and canyon homes land toward the top of it because coastal permitting and hillside logistics slow the schedule. Call (888) 427-1733 and we’ll put a written, line-item number in front of you.

Call (888) 427-1733

What the job actually looks like, stage by stage

We don’t hand you a start date and disappear. Here’s the sequence a Malibu full bathroom remodel follows, including where your decisions sit.

Stage 1 – Demo and discovery (days 1 to 3)

We protect the floors and hallway, shut off water, and pull the old fixtures, tile, vanity, and drywall down to the studs. Expect surprises in a Malibu bungalow: corroded supply lines, undersized framing, or old waterproofing that never existed in the first place. By the end of day 3 you know exactly what’s behind the wall. Anything that changes scope gets priced in writing before we go further, never an open-ended add-on later.

Stage 2 – Rough-in and framing (days 4 to 8)

Plumber and electrician set new drain lines, supply runs, GFCI protection, exhaust, and lighting. If you’re relocating the toilet or tub, this is the stage where that cost lives. The building inspector visits at rough-in before anything is closed up. You’ll finalize fixture placement and outlet locations now, because moving them after tile is a redo.

Stage 3 – Waterproofing and tile (days 8 to 21)

This is the stage that decides whether a bathroom lasts. Cement backer board, a bonded waterproof membrane, and a flood test where a curb shower is involved. Tile setting comes next, and it’s the single longest trade in the job. You pick tile and grout before this stage starts, not during it, or the schedule stalls.

Stage 4 – Fixtures, vanity, and finishes (days 21 to 32)

Vanity set, countertop, faucets, toilet, shower glass, mirrors, and paint go in. This is where a job feels real and also where delays hide: a vanity ordered late pushes everything behind it by two weeks. We confirm every long-lead item at the estimate stage so nothing sits in a warehouse while your bathroom sits unfinished.

Stage 5 – Final inspection and punch list (days 32 to 45)

The inspector signs off on the permitted work, we walk the room with you, and we close the punch list. Then the 730-Day Done Right Promise takes over: if something we built stops working or wasn’t done right, we make it right, in writing, for two full years.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually shape your bathroom

The bones of the job are the same. The finish level is where budgets split. Here’s what you’re really choosing between.

  • Tile: porcelain versus natural stone. Porcelain holds up beautifully around salt air and is easier on the budget. Marble and limestone read higher-end but are softer, need sealing, and in a beach-adjacent Malibu shower they demand more upkeep. Pick stone if you love the look and will maintain it.
  • Shower pan: pre-formed versus site-built. A pre-formed pan is faster and cheaper. A site-built pan with a linear drain fits irregular footprints and lets you tile the floor flush, which many homeowners want. It costs more in labor and requires careful waterproofing.
  • Vanity: stock, semi-custom, or custom. Stock is quick and economical. Semi-custom lets you size the cabinet to the room and choose the finish, and it’s where most of our clients land. Brands like KraftMaid give you real door-style and finish choices without a full custom price.
  • Ventilation. A properly sized exhaust fan is non-negotiable in a marine environment. Undersize it and you’ll fight mold on the ceiling within a year. We spec the CFM to the room volume, not a guess.
  • Fixtures and hardware. Kohler-level fixtures hold finish and warranty well. Cheap faucets pit quickly near the coast. This is a place where spending a little more buys years.

What Full Bathroom Remodeling costs in Malibu, CA

Most full bathroom remodels here land between $9,000 and $28,000. A smaller bathroom remodel runs lower, but the full-gut scope this page covers is the range above.

Line item Typical range
Full bathroom remodel $9,000 – $28,000
Walk-in shower installation $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000
Vanity installation $800 – $3,000

Five things push the number up or down:

  • Room size and layout. A tight hall bath costs less in tile, glass, and labor than a primary bath with a double vanity.
  • Condition behind the wall. Rot, old galvanized pipe, or missing waterproofing adds real cash.
  • Moving plumbing, electrical, or structure. Relocating a drain in a slab or reframing a wall for a larger shower is the biggest single swing.
  • Material grade. Porcelain and a stock vanity versus stone and custom cabinetry can move a bathroom by several thousand dollars.
  • Permit scope. Cosmetic work versus permitted plumbing and electrical changes affects both fees and inspection time.

Your written estimate lists what’s included (demo, materials, labor, permits, cleanup) and what isn’t (structural repair if we find it, upgrades you add later). The price you sign is the price you pay. No change-order games.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Malibu homes specifically do to this job

Malibu isn’t a normal remodel market. Nearly every project involves a home where the Santa Monica Mountains meet the Pacific, and that changes the bathroom before a single tile is picked. Coastal development permits and fire-hardening requirements can shape the scope, and for hillside and bluff lots, geotechnical concerns on graded slopes sometimes enter the conversation even on interior work. We’re used to reading that landscape before we quote, not after. Canyon access matters too: many homes off Latigo or Encinal can only be reached on narrow, winding grades, so concrete trucks and material deliveries get scheduled around the road, and a late delivery isn’t a small thing. Salt spray and the marine layer also push us toward corrosion-resistant fasteners and marine-grade hardware in wet rooms. The housing stock runs from mid-century PCH bungalows to large contemporary canyon estates, and we see the same failures in both: failed shower pans, mold at the ceiling line from weak ventilation, and old plumbing that finally gives out. We cover Malibu from the coast to the canyons. If your bathroom work sits under a failing roof or wants an updated look up top, homeowners often pair this with Roof Repair in Malibu or a full Roof Replacement & Installation in Malibu so the exterior gets handled at the same time.

Serving Malibu, CA – Our Local Coverage Area

We serve Malibu and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Full Bathroom Remodeling in Malibu

Get a free written estimate for your Malibu bathroom

Call (888) 427-1733 to schedule a free on-site estimate for full bathroom remodeling in Malibu. A live person answers, day or night, and you’ll get a written, line-item quote with upfront pricing: the number you see is the number you pay. We’ll walk the room, discuss the options, and confirm what’s permitted and what isn’t before you commit. From foundation to finish line, it’s one contractor, one number, and a guarantee in writing.

Written by the team at Groundwork Construction Co..

Why Malibu Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full bathroom remodeling in Malibu.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Malibu

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Malibu Customers Say

Trusted by homeowners across Malibu and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Malibu?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Malibu.

(888) 427-1733

Request a Free Estimate in Malibu

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch