A Groundwork company - serving Los Angeles, CA
Full Bathroom Remodeling in Agoura Hills, CA | Groundwork Construction Co. of Los Angeles

Full Bathroom Remodeling in Agoura Hills - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Agoura Hills, CA: What the Job Actually Involves

A full bathroom remodeling in Agoura Hills runs $9,000 – $28,000 and usually takes 3 – 6 weeks of active construction once permits clear. That covers demo, rough-in plumbing and electrical, waterproofing, tile, fixtures, vanity, lighting, and paint in a typical hall or primary bath. The range is wide because Agoura Hills homes vary so much: a 1970s Morrison Ranch split-level and a newer foothill custom build are different jobs before the first tile is set. Call (888) 427-1733 for a free on-site estimate.

Call (888) 427-1733

Key takeaways

  • Most full bath gut-and-rebuilds here land between $9,000 and $28,000.
  • Timeline is typically 3 – 6 weeks of construction, longer if plumbing or framing moves.
  • Hillside lots and older tract homes drive cost more than tile choices do.
  • The number in your written estimate is the number you pay.

How we run a full bathroom remodel, stage by stage

Every full bathroom remodeling job follows the same skeleton, but the duration and decisions shift depending on what we find behind the drywall. Here’s the honest sequence.

Stage 1: Site protection and demolition (1 – 2 days)

We lay floor protection through the path from the entry to the bath, then demo to the studs: tile, tub or shower pan, vanity, toilet, and drywall down to framing. You decide at this point whether you’re keeping the existing layout or relocating anything, because demo is the last easy moment to change your mind. Debris hauls out same day in a dumpster staged on the driveway or, on tighter canyon lots, a designated staging area you’ve cleared in advance.

Stage 2: Rough-in plumbing and electrical (2 – 4 days)

This is where the real money gets decided. A vanity moved six inches is nothing; a toilet moved to the opposite wall is a drain re-route and often a slab or subfloor cut. We open walls for new supply lines, drain lines, GFCI outlets, exhaust fan wiring, and any lighting changes. You decide fixture locations and confirm the venting path before we close the walls. A city inspector reviews the rough-in before any drywall goes up.

Stage 3: Insulation, waterproofing, and inspections (2 – 3 days)

We install cement board in wet zones, apply a bonded waterproofing membrane to the shower walls and floor, and set the pan with a proper slope to the drain. This is the stage nobody sees and the one that determines whether you have a bathroom that lasts twenty years or one that leaks into the ceiling below. You don’t decide anything here except your tile layout, which we lay out on the floor for your sign-off before setting.

Stage 4: Tile, finishes, and fixture installation (7 – 14 days)

Tile goes up and the grout cures. Then the vanity, countertop, toilet, shower glass or curtain rod, mirrors, and lighting go in. You choose grout color, trim profiles, and hardware at the start of this stage, not the middle. Expect tile work alone to eat five to nine days on a full bath with a tiled shower.

Stage 5: Final walkthrough, punch list, and paint (2 – 3 days)

We paint, install the fan cover and any accessories, and walk the room with you against the written scope. Anything on your punch list gets handled before we call it done. Every project is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make during a full bathroom remodeling

Most of the budget conversation is really a materials conversation. Here’s what you’re choosing between and the honest trade-off of each.

  • Shower tile: ceramic vs. porcelain vs. natural stone. Ceramic is the budget pick and fine on walls; porcelain holds up better in wet zones and runs a bit more. Natural stone (travertine, marble) looks the part but needs sealing and shows water spots. On Agoura Hills hard water, we usually steer people toward porcelain.
  • Waterproofing: cement board alone vs. a bonded membrane system. Cement board by itself is the cheap route; a full membrane is the one we recommend every time, and it’s a small fraction of the total cost compared to the damage a failed pan causes.
  • Vanity: stock vs. semi-custom. Stock cabinets ship fast and cost less; semi-custom fits odd wall widths common in 1960s – 80s tract homes and lets you pick the counter depth. We work with brands like KraftMaid for semi-custom.
  • Flooring: tile vs. luxury vinyl plank. Tile is the long-haul choice; LVP is faster and warmer underfoot but won’t last as long in a wet room.
  • Ventilation: standard fan vs. humidity-sensing. The humidity-sensing fan costs more up front and is worth it in a small, windowless bath.

What full bathroom remodeling costs in Agoura Hills, CA

The lead range for a full bathroom remodeling in Agoura Hills is $9,000 – $28,000. Where you land depends on five things:

  • Size and layout. A 5×8 hall bath sits near the bottom; a large primary bath with a separate shower and tub climbs toward the top.
  • Existing condition. Water damage, old galvanized supply lines, or a failing cast-iron drain found during demo adds cost that no estimate can predict with certainty.
  • Moving plumbing, electrical, or structure. Relocating a toilet, adding a circuit, or opening a load-bearing wall are the biggest single swings in the budget.
  • Material grade. Tile, fixtures, and glass range widely. Porcelain and a stock vanity versus natural stone and semi-custom can be a $5,000+ spread on the same footprint.
  • Permit scope. A like-for-like swap may not need a permit; relocating plumbing or electrical does, and that adds inspection steps and time.

A written, line-item estimate includes demo, rough-in, waterproofing, tile and setting materials, fixtures you select, labor, permits we pull, and cleanup. It typically does not include surprise structural or water-damage repairs discovered mid-demo; we price those separately in writing before we touch them. Our pricing is upfront: the number you see is the number you pay, with no change orders for items in scope. Projects over $10,000 take $1,000 off, and 0% financing for 18 months is available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Agoura Hills homes specifically do to this job

Agoura Hills sits in the foothills along the 101, and that geography shapes construction here in ways that flat-valley work does not. Steep canyon lots and hillside grading standards mean drainage and slope get considered even on an interior bathroom job, because water management at the foundation affects what happens behind your walls. Older homes in tracts like Morrison Ranch and Old Agoura were built in the 1960s through the 1980s, and we regularly open a wall to find original galvanized plumbing, insufficient exhaust venting, or a shower pan that’s been quietly leaking into the framing for years. Old Agoura’s horse properties on large rural lots bring their own wrinkle: private access roads, septic systems, and occasionally well water, all of which change how we stage a job and what we test before we sign off. Wildfire-interface building codes in the high fire-severity zone don’t govern interior bathroom tile, but they do affect venting penetrations through the roof and exterior wall work. We pull the permits, pass the inspections, and handle the paperwork across ZIP codes 91376 and 91301. For the broader scope, see our Bathroom Remodeling in Agoura Hills page, and if a roof vent penetration needs attention, homeowners often pair this with Roof Repair in Agoura Hills. Our Bathroom Remodeling service covers the full range of bath work, and you can find everything we do across Agoura Hills on our service-area page. When a full bath remodel turns into a larger addition, that’s where Roof Replacement & Installation in Agoura Hills often comes in.

Serving Agoura Hills, CA – Our Local Coverage Area

We serve Agoura Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: Full Bathroom Remodeling in Agoura Hills

Schedule your free full bathroom remodeling estimate in Agoura Hills

Call (888) 427-1733 for a free on-site estimate and design consult for full bathroom remodeling in Agoura Hills. We’ll walk your bath, talk through layout and materials, and hand you a written, line-item quote with no surprises. A live person answers the phone 24/7, so you’re never stuck in voicemail. Most free estimates take under an hour.

Written by the team at Groundwork Construction Co.

Why Agoura Hills Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full bathroom remodeling in Agoura Hills.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Agoura Hills

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Agoura Hills Customers Say

Trusted by homeowners across Agoura Hills and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Agoura Hills?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Agoura Hills.

(888) 427-1733

Request a Free Estimate in Agoura Hills

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch