Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Stevenson Ranch: What the Job Actually Involves
Cabinet and countertop work in Stevenson Ranch runs $14,000 – $45,000 for a full kitchen, and most jobs take two to four weeks from demolition to final caulk. Cabinet installation alone lands at $4,000 – $13,000, countertops at $2,000 – $6,500, and a new island adds $3,000 – $10,000. Because nearly every home here sits inside an HOA with design-review rules, we build the approval step into the schedule before a single box arrives. Call (888) 427-1733 to set up a free on-site estimate.
How we run a cabinet and countertop job, step by step
HOA paperwork comes first, not last. We pull your community’s architectural guidelines and confirm the approved door style, finish color, and visible hardware before you sign off on a design. That saves you from ordering a slab or a cabinet line the design-review committee will reject two weeks later.
Stage 1 – Design and ARB submission (3 – 7 days). You choose the door profile, finish, and countertop material. We prepare the drawings and spec sheet your architectural review board needs, then submit. This is where you decide the look and lock the budget.
Stage 2 – Measure and order (1 – 2 days, then lead time). We template the actual space, not the old drawings, because Stevenson Ranch kitchens rarely measure square. Cabinet orders usually take two to four weeks to arrive. You confirm the final layout and appliance sizes here, since a fridge swap after ordering means re-cutting panels.
Stage 3 – Demo and prep (2 – 3 days). Out come the old cabinets and counters. We check the wall for water damage behind the sink, level the floor, and address any drywall or electrical that has to move before new boxes go in. If plumbing or a gas line has to relocate for an island, that gets roughed in now.
Stage 4 – Cabinet set and countertop template (3 – 5 days). We hang and level the uppers and bases, install the island, and set the countertop template once the cabinets are locked in place. Solid-surface counters are fabricated to that template, so this step can’t be rushed. Your job here is a quick walkthrough to confirm drawer and door clearance.
Stage 5 – Countertop install and punch (2 – 4 days). The fabricated tops go down, seams get set, and we do the final alignment and cleanup. You get a walkthrough and the 730-Day Done Right Promise in writing. If any door is misaligned or a seam looks off, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually weigh
Most of the decisions land in a handful of spots. Here’s how each one trades off:
- Cabinet construction – stock vs. semi-custom vs. custom. Stock boxes are the fastest and cheapest but limited in size, so they can leave awkward filler gaps in a non-standard kitchen. Semi-custom (a KraftMaid-type line, for example) gives you real size and finish choices without full custom pricing. Full custom fits anything and costs the most and takes the longest.
- Door material and finish. Painted MDF doors are smooth and budget-friendly but chip at corners. Thermofoil resists moisture and cleans easily but can peel at edges over years. Wood-veneer and lacquered finishes look the best and cost more.
- Countertop surface. Quartz (Cambria and similar) is non-porous, needs no sealing, and handles a busy kitchen well. Granite is durable and one-of-a-kind but needs periodic sealing. Laminate is the budget pick and shows wear faster at the sink and edges.
- Island size and function. A prep island with a sink and outlets costs more but changes how the kitchen works. A simple seating island is cheaper and easier to fit.
- Hardware and soft-close. Soft-close drawers and full-extension slides add cost but you’ll notice them every day.
What Cabinets & Countertops costs in Stevenson Ranch, CA
A full cabinet and countertop replacement in Stevenson Ranch typically runs $14,000 – $45,000. The line items break down like this:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full cabinet + countertop job | $14,000 – $45,000 |
Five things push a job toward the high end: the size and layout of the kitchen (galley vs. open plan with an island); the existing condition behind the old cabinets (water damage or out-of-square walls add labor); whether plumbing, gas, or electrical has to move; the grade of cabinet line and countertop material; and the permit scope. What’s included in our written estimate is demolition, cabinet and countertop supply and install, and cleanup. What typically isn’t: new appliances, backsplash tile, and any structural change – those get quoted separately. Upfront pricing means the number you see is the number you pay. Call (888) 427-1733 for an exact quote; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Stevenson Ranch homes specifically do to this job
Stevenson Ranch is a master-planned, unincorporated community, and that shapes the work in ways a Santa Clarita or Valencia kitchen never sees. Every project here answers to both LA County permitting and an HOA design-review board, so a cabinet color or door style that flies in a neighboring city can get kicked back if it isn’t on the community’s approved list. Homes backing the hillside greenbelt tend to draw the closest look from both the review board and inspectors, and we plan for it. The housing stock is almost entirely 1980s – 2000s Mediterranean and Spanish-style builds with stucco walls, so most kitchens here are original – which means aging cabinets, tired laminate or tile counters, and the occasional leak behind the sink. Seasonal Santa Ana winds and dry summers don’t touch the cabinets themselves, but hillside moisture and winter rain means we check for water intrusion at exterior walls before we install new boxes against them. Our crews have up to 12 years of experience reading that kind of wear, and we cover the whole of Stevenson Ranch.
Serving Stevenson Ranch, CA – Our Local Coverage Area
We serve Stevenson Ranch and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Stevenson Ranch
Typically two to four weeks, and the cabinet lead time is the biggest variable. If you choose a semi-custom line that takes three weeks to arrive, add that to the install days. Call (888) 427-1733 and we’ll give you a real timeline for your kitchen.
Usually not for a straight swap, but yes if plumbing, gas, or electrical moves – and Stevenson Ranch sits under LA County permitting, so scope matters. We pull the permits and pass the inspections when the job requires it. Call us to confirm your scope.
Yes, and that keeps the price down. If you keep the sink and range where they are and skip a new island, you’re typically in the $4,000 – $13,000 cabinet range plus $2,000 – $6,500 for counters. Moving a sink or adding a gas line to an island pushes it toward the high end. Call (888) 427-1733 for a rounded quote.
That’s where we start. We pull your architectural guidelines first and match door style, finish, and hardware to the approved list before ordering. It avoids a rejected order and protects your timeline. Call us to talk through your community’s rules.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s in writing. Call (888) 427-1733 to get started.
Get a free estimate for Cabinets & Countertops in Stevenson Ranch
Replacing cabinets and countertops is a big spend, and you should price it before you commit. Call (888) 427-1733 for a free on-site estimate; a live person answers around the clock. You’ll get a written, upfront quote, HOA approval guidance, and a clear timeline. If you’re planning the wider project, we can fold this into Kitchen Remodeling in Stevenson Ranch as part of a full Kitchen Remodeling scope. Homeowners often pair this with Walk-In Showers & Shower Remodeling in Stevenson Ranch or a Tub-to-Shower Conversion in Stevenson Ranch to refresh the whole home at once.
Written by the team at Groundwork Construction Co.