How Long Does Windows & Doors Take? Timelines and What to Expect

Last updated November 17, 2026

Windows & doorsWindows & doors
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

How Long Does Windows & Doors Take? Timelines and What to Expect

Here’s the part nobody puts in the brochure: a whole-home window project in Los Angeles routinely takes longer than the installation itself. Most of the calendar time gets eaten before a single old sash comes out. Custom window orders are running 6 to 12 weeks from manufacturers, and that clock doesn’t even start until your permit is approved. In the City of Los Angeles, that approval can add another 3 to 4 weeks on top. Add stucco repair, older framing surprises, and HOA sign-off, and a “one-week job” can stretch past two months. This guide breaks down every phase – front-end paperwork, lead times, per-unit install realities, and cleanup – so you can plan around the real schedule instead of the optimistic one.

Call (888) 427-1733

Quick Answer

A single window or door replacement typically takes 2 to 4 hours of on-site labor. A whole-home project of 15 to 25 openings usually runs 3 to 7 working days of installation, but the full project timeline from signed contract to final inspection is commonly 8 to 16 weeks in Los Angeles once you account for permit review (roughly 3 to 4 weeks), custom manufacturer lead time (6 to 12 weeks, and often longer for premium lines like Marvin or Andersen), and stucco repair after each elevation. Plan for the paperwork and the factory, not the drill.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Table of Contents

The Timeline Nobody Tells You About: Permit and Lead Time Come First

The longest stretch of any window project happens before anyone opens a toolbox. Two separate clocks run in sequence, not in parallel: permit approval, then manufacturer lead time. That ordering trips up a lot of Los Angeles homeowners who assume the windows get ordered the day they sign.

Here’s how the front end actually works:

  1. Site measurement and product selection (1 to 2 weeks). Precise measurements of every rough opening, plus decisions on frame material, glass package, and configuration. Brand choice drives everything downstream – a Sterling vinyl slider and a custom Marvin wood-clad casement live on completely different planets of lead time.
  2. Permit application and plan review (3 to 4 weeks in the City of Los Angeles). Replacement-in-kind windows usually move faster than anything that alters the opening or changes egress. Anything touching a structural header, adding a new opening, or changing egress in a bedroom triggers a deeper review. Some homes sit in a Historic Preservation Overlay Zone (HPOZ) – think Angeleno Heights, Highland Park, or Windsor Square – and that adds an extra approval layer that can push past 6 weeks.
  3. Manufacturer lead time (6 to 12 weeks typical). This is the wild card. Standard sizes from a major line move faster. Custom sizes, unusual color matches, and premium wood-clad products sit at the long end. We tell Los Angeles homeowners to budget 10 weeks and be pleasantly surprised rather than the reverse.
  4. Delivery and staging (3 to 7 days). Windows get delivered to a staging area – usually the driveway or garage – inspected for damage, and labeled by room so the install crew isn’t sorting 22 units on day one.

Total front-end reality: roughly 10 to 17 weeks. If you’re told “four weeks start to finish” on a full set of custom windows in Los Angeles, ask what magic permit-free factory they’re ordering from.

How Long Does One Window or Door Actually Take to Install?

A standard single-hung or double-hung replacement in a typical Los Angeles stucco home takes 2 to 4 hours per unit from the moment the crew sets up to the moment the last caulk line gets tooled. That range is real, not a hedge – the low end applies to a same-size drop-in on sound framing; the high end covers an opening that needs shimming, flashing correction, or minor trim work.

What actually eats the time per opening:

  • Old unit removal: 20 to 45 minutes. Aluminum sliders from the 1960s come out quickly. Painted-shut wood double-hungs with settled frames take longer.
  • Opening prep and inspection: 15 to 40 minutes. This is where LA surprises live. Water damage at the sill, dry rot in the framing, or a rough opening that’s out of square by half an inch – all real, all common in homes built before 1980.
  • Setting, shimming, and fastening: 30 to 60 minutes. A properly set window is plumb, level, square, and shimmed at the correct points so the frame doesn’t bow when the sash operates.
  • Flashing and weather-sealing: 20 to 40 minutes. Critical in Los Angeles because our occasional heavy rain events find every gap. Flashing tape, sealant, and proper back-damming at the sill aren’t optional.
  • Interior and exterior trim: 30 to 60 minutes. Casing, stool, apron, and exterior trim – or a clean stucco return if there’s no exterior casing.
  • Cleanup and final operation check: 15 to 30 minutes. Glass cleaning, debris removal, and operating every sash and lock.

Entry doors run longer – 4 to 6 hours each – because door installs involve the threshold, the sill pan, hinge alignment, and getting the door to swing true without dragging. A patio slider is closer to 3 to 5 hours. Most single-window and single-door jobs are completed in a single visit.

Whole-Home Window Replacement: Honest Day Counts

Here’s where the estimate and the calendar stop agreeing. Whole-home window replacement on a typical 3-bedroom Los Angeles home – say 16 to 22 openings – takes 3 to 7 working days of installation. Not one week of pure glass time; that number includes setup, per-unit install, stucco-related disruptions on the exterior elevations, and daily cleanup.

The real day counts, in our experience on Los Angeles projects:

  • Setup and staging (half a day at the start): Floor protection, furniture moving, drop cloths, and a walkthrough to confirm unit-to-room mapping.
  • Installation (typically 4 to 8 openings per day for a two-person crew): Two-person crews move faster on upper-floor windows where two sets of hands matter. Single-story homes go quicker.
  • Stucco patching and exterior finishing (1 to 3 days per elevation): See the next section – this is the phase that blows up “one week” projects.
  • Interior trim, paint touch-up, and final walkthrough (1 day): Not full painting, but patching and touch-up where the new casing meets the wall.
  • Debris removal and final haul-away (half a day): Old windows, packaging, and stucco rubble get hauled off – not left to become your problem.

Stack it honestly: 5 to 10 working days total for a whole-home job. If a contract says 3 days, that’s installation only, and the stucco and trim haven’t been counted.

For broader exterior and envelope work that goes beyond windows, our team handles windows, doors, and full envelope services in Los Angeles as one project with one schedule – so you’re not coordinating three contractors and three calendars.

Stucco Repair After Replacement: The 1-to-3-Day Factor Per Elevation

This is the most common missed line item in window estimates, and it’s specific to Southern California housing stock. Most Los Angeles homes are stucco over wood frame – and when you pull a window out, the stucco around it cracks, spalls, and gets removed to access the rough opening. Putting it back is a real phase of the project, not a walk-away touch-up.

Stucco repair adds 1 to 3 days per elevation depending on:

  • How much stucco comes off. A same-size replacement where the trim covers the joint might need only patching. A window that shifts in size, or a project that adds new openings, requires cutting back to sound lath and re-floating.
  • Color matching. Stucco color won’t perfectly match a 20-year-old sun-faded wall, even with the original color code. Many Los Angeles homeowners choose to repaint or re-tint the whole elevation to avoid visible patches – which is a paint schedule, not a stucco schedule, and worth planning for.
  • Texture match. Santa Barbara finish, lace, dash, or heavy sand float – each requires matching technique, and a mismatched texture patch is the first thing a buyer sees at resale.
  • Weather windows. Wet stucco needs to cure. Los Angeles gives us a cooperative climate for most of the year, but a rainy week in January or February will push patching.
  • Cure time before painting. Fresh stucco needs days to cure before paint, so the patching and painting phases can’t happen back-to-back on the same day.

For a full-elevation patch after a whole-home project, plan a full week of stucco-and-paint time across multiple elevations. Ask any contractor to show stucco repair as a line item in the estimate. If it’s not there, it’s going to become a change order.

Los Angeles-Specific Things That Stretch the Schedule

Los Angeles homes have more timeline wildcards than the average American market. Any honest estimate accounts for these:

  • Older framing and rough openings. Homes built before WWII – common in Silver Lake, Echo Park, West Adams, and Cheviot Hills – often have rough openings that are out of square, non-standard in size, or in poor structural shape. That triggers framing repair, which adds a day or two and a change order. Non-standard openings also mean custom-sized units, which pushes to the long end of lead time.
  • Dry rot and water intrusion. Found at sills on more Los Angeles homes than anyone expects, particularly on the west and south-facing elevations that take wind-driven rain. King studs, sills, and headers may need repair.
  • HOA approval. If your home is in a Planned Development or HOA – very common in newer Los Angeles developments in Playa Vista, Porter Ranch, and parts of the Valley – window color, mullion style, and even glass tint may need architectural approval. That adds 2 to 6 weeks, and must happen before ordering.
  • HPOZ and historic review. In HPOZ districts, exterior changes need Cultural Heritage Commission review, which can add weeks.
  • Access and parking. Getting a truck and crew to a Hillside or narrow-street property in Laurel Canyon or Mount Washington means staging time. It’s real, and it’s a difference from a suburban install.
  • Title 24 and glass ratings. California energy code requires specific U-factor and SHGC ratings – more critical in Los Angeles County’s mixed climate zones. Ordering the wrong glass package means a re-order and a 10-week delay.

Want a project that lives on the calendar the way these factors actually play out? Ask a contractor to show their schedule broken into phases – permit, order, install, stucco, trim – before you sign. Our team writes a phase-by-phase schedule into the proposal, and we back every window and door install with our 730-Day Done Right Promise: if it’s not done right, we make it right.

How to Sequence a Multi-Room Project Without Losing Your Sanity

You don’t have to give up half the house for two weeks. Sequencing matters, and doing it well doesn’t cost quality. Here’s how we stage multi-room replacements on Los Angeles homes:

  1. Group by elevation, not by room. Install windows on one exterior wall at a time. This keeps the crew on one scaffold setup, and it means only one side of the house is “open” at a time – critical if weather turns.
  2. Start with the rooms you can live without. Guest rooms, formal dining, and upstairs bedrooms get done first. Master bedroom, kitchen, and living areas come last, when the crew is operating on rhythm and the fast, clean installations are the norm.
  3. Install weather-tight before stucco. Get units set and flashed on each elevation, then move to stucco repair on that elevation before moving to the next. Don’t leave open walls overnight or across wet weather.
  4. Do interior trim at the end, not by room. Touching up trim requires the same tools and same material across the whole house – trim in one sweep is faster and more consistent.
  5. Schedule a mid-project walkthrough. Halfway through, walk with the lead and confirm any deviations before continuing. Catching an issue mid-project costs hours; catching it at the end costs a week.
  6. Hold the front porch for last. The entry door is the one change that affects how your home feels every day. Finish it after the noisy work is done.

If your project is bigger than windows alone – a kitchen expansion or a home addition that puts new openings into existing walls – the sequencing gets more involved. Our team plans home additions and ADU construction in Los Angeles with windows and doors integrated into the schedule from day one, so you’re not retrofitting openings after the drywall is up.

Doors Are a Different Animal: Entry, Patio, and Sliding Doors

Windows and doors share a category in most contracts but live on totally different timelines. Here’s the honest breakdown:

  • Entry door (fiberglass or steel): 4 to 6 hours of install per door, plus a half-day of paint touch-up. Custom wood entry doors – think a solid mahogany or oak door – often run 8 to 14 weeks from the manufacturer, longer than most window lines.
  • Patio door (hinged French): 4 to 6 hours each. These typically require a wider rough opening and often touch framing, so a plan check may be required if the opening changes.
  • Sliding glass door: 3 to 5 hours each, but the track and threshold need to be set perfectly level or the slider binds. This is a detail that shows up in a few days if it’s wrong.
  • Bifold and multi-panel doors: 1 to 2 days for larger systems. Pre-hung configurations from premium lines like Andersen or Marvin often arrive as kits, which is faster to install but heavier and needs two to three people.
  • Exterior door in a wall that’s not currently a door: Adds framing, header install (often requiring structural review), exterior repair, and permit scope. Budget 3 to 5 days, plus permit review.

Door hardware matters to the timeline, too. A high-end lockset from a brand like Grohe or an electronic lock system needs to arrive before install day; running out for hardware mid-installation is a speed bump that shows up in the calendar, not the price.

Building a Realistic Calendar: A Step-by-Step Planning Template

Add these phases back-to-back for a whole-home replacement in Los Angeles. Times are calendar, not labor.

  1. Initial consult and measurements: 1 to 2 weeks from first call to signed proposal (includes the free estimate and design consult).
  2. HOA or HPOZ approval, if applicable: 2 to 6 weeks (concurrent with permit prep where possible).
  3. Permit submission and approval: 3 to 4 weeks for City of Los Angeles, longer for complex scope.
  4. Manufacturer lead time: 6 to 12 weeks, starting the day the order is placed – which is after permit approval.
  5. Delivery and staging: 3 to 7 days.
  6. Installation: 5 to 10 working days (for a 16 to 22 unit home).
  7. Stucco repair and paint touch-up: 1 to 3 days per elevation, sequentially.
  8. Final walkthrough and inspection: 1 day.

Total realistic span: roughly 14 to 22 weeks from first call to final walkthrough for a full-home project with a permit and stucco repair. A single window or door? About 3 to 6 weeks, and often less if the unit is in stock.

Want to lock the timeline into a written schedule? Our team provides a free project estimate and design consult, and quotes show the phase-by-phase calendar so you know what happens when. Current customers also get $1,000 off projects over $10,000 and 0% financing for 18 months – the promotional structure matters when you’re looking at a multi-phase project because it keeps the budget predictable.

Common Mistakes to Avoid

  • Believing an estimate that only quotes install days. If the schedule says “3 days,” ask what’s missing. Stucco, trim, paint, and inspection aren’t on that list. The install phase is real, but it’s rarely the whole story in Los Angeles.
  • Ordering windows before the permit is approved. Placing the order early seems efficient – until the plan check requires a change, and you’re stuck with units that don’t fit the approved scope.
  • Skipping the HOA or HPOZ review. In Playa Vista, Porter Ranch, or an HPOZ district, ordering before architectural approval is a guaranteed re-order and a 6-to-10-week setback.
  • Treating a “same-size” opening as guaranteed. Measure twice. In an older Los Angeles home, the “standard” opening rarely matches the standard order, and finding out on install day costs weeks.
  • Not asking who pays for framing repair. If dry rot gets uncovered at install, does the estimate cover it or is it a change order? Ask before signing.
  • Underestimating stucco color match. Fresh stucco never perfectly matches sun-faded walls. Decide up front whether you’ll accept visible patches or plan a full elevation repaint – and put that in the schedule.
  • Scheduling installation the week of rain or a planned vacation. Los Angeles is dry most of the year, but a January atmospheric river on an open-wall install day means a scramble to tarp and a rescheduling headache.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

Some window and door projects are within the reach of a careful homeowner. Most aren’t. Call a professional when: the opening is in an exterior wall and needs flashing that will survive Los Angeles rain events; the home is older than 1980 and could hide dry rot or out-of-square framing; the project touches a structural header, changes egress in a bedroom, or adds a new opening; the home is in an HOA or an HPOZ district; the doors are premium or multi-panel systems from Andersen, Marvin, or a similar line; or the number of openings is more than one or two. Window and door replacement isn’t a place to learn on your own house, because the consequences show up years later as water intrusion or sticking sashes. Groundwork Construction Co. of Los Angeles offers free estimates in Los Angeles – call (888) 427-1733 to schedule yours, and our team answers the phone live, 24/7, with a real person on the other end.

Frequently Asked Questions

The Bottom Line

Window and door projects aren’t slow – the paperwork and the factory are. Once the units arrive and the permit is in hand, installation itself is 5 to 10 working days for a whole-home project in Los Angeles. Before that, permit approval (3 to 4 weeks) and manufacturer lead time (6 to 12 weeks) plus stucco repair (1 to 3 days per elevation) define the real timeline. Plan on 12 to 20 weeks for a full-home project with a permit. The best protection against slipping deadlines is a written schedule in the contract, a contractor who pulls the permits and shows stucco repair as a line item, and a workmanship guarantee that covers you well after the final walkthrough – which is exactly what our 730-Day Done Right Promise is built for.

Groundwork Construction Co. of Los Angeles answers the phone live, 24/7 – no voicemail, no waiting until Monday. Our technicians are background-checked and arrive in uniform, and every window and door install is covered by upfront pricing with no surprises. If you’ve been burned by vague timelines before, we want to be the contractor who puts the calendar in writing. Explore our other services – driveway and pavers in Los Angeles or fence installation in Los Angeles – and call (888) 427-1733 for a free estimate.

Written by the team at Groundwork Construction Co. of Los Angeles.

Need Construction help in Los Angeles? Licensed & insured · free written estimates
Call (888) 427-1733
Local Service Coverage

Request a Free Estimate in Los Angeles

Tell us what you need - Groundwork Construction Co. of Los Angeles responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch