A Groundwork company - serving Los Angeles, CA
New Detached ADU in Marina del Rey, CA | Groundwork Construction Co. of Los Angeles

New Detached ADU in Marina del Rey - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Marina del Rey: What It Costs and How Long It Takes

A new detached ADU in Marina del Rey typically runs $45,000 – $130,000 for a standard single-story unit, with the wide spread driven mostly by size, foundation and utility runs on a coastal lot. Plan on 6 to 10 months from first site walk to final inspection, since Marina del Rey permits and coastal-corrosion detailing set a slower clock than inland projects. Call (888) 427-1733 for a free on-site estimate.

Call (888) 427-1733

From site walk to final inspection: how a detached ADU actually gets built

Every project follows the same five stages. What changes is how much time each one eats, and on a Marina del Rey lot, the site and utility stages usually eat the most.

Stage 1: Site walk and feasibility (1 – 2 weeks)

We measure the yard, confirm setbacks against what 90292 actually allows, and check where the sewer lateral, water main, and electrical panel sit. This is where you decide the footprint and where the unit will sit relative to the main house, a fence line, and any shared driveway. A lot that looks generous on paper can tighten fast once you account for utility easements and the required fire separation from the primary structure.

Stage 2: Design and permitting (8 – 16 weeks)

You approve a floor plan and an exterior finish package that reads as a sibling to the main house rather than a box dropped in the yard. Then plans go to the city, and this is the long pole. Structural, energy, and coastal review stack up, and a plan check comment round can add three to four weeks on its own. You sign off on the final plan set before anything is submitted.

Stage 3: Site prep, foundation, and utilities (3 – 5 weeks)

Demo of anything in the footprint, grading, trenching for water, sewer, and power, then the foundation pour. On a salt-air lot we spec corrosion-resistant anchors, stainless or hot-dip galvanized hardware, and a stem wall detailing that keeps framing off splash-back. You decide whether the unit gets a slab or a raised floor, which affects both cost and how the unit handles the marine layer.

Stage 4: Framing, envelope, and rough-in (5 – 8 weeks)

Walls go up, the roof goes on, and plumbing, electrical, and HVAC rough-in follow. Inspections happen between each. This is where you pick the roof system, the wall assembly, and the window and door package, because those choices dictate the air-sealing and waterproofing detail that gets built in now and can’t be added later.

Stage 5: Finishes, final inspection, and handoff (4 – 6 weeks)

Drywall, cabinets, counters, flooring, fixtures, paint, and landscape tie-back. Final inspection closes out the permit, then we walk the unit with you and log any punch items. From here, the 730-Day Done Right Promise covers workmanship, so if a detail fails in the first two years, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

Most of the decisions that shape both budget and how the unit lives come down to a handful of forks. Here’s what they actually mean.

  • Site-built vs. prefab panelized: A site-built unit gives you full freedom on layout and matches the main house most convincingly. A prefab panelized approach (Abodu and Cover both work this way) can compress the build schedule, but the design flexibility is tighter and the site still has to be prepped to their spec. Prefab isn’t automatically cheaper once foundation and utility runs are counted; it’s a schedule trade.
  • Slab vs. raised floor: Slab is simpler and cheaper up front. A raised crawlspace floor keeps framing further from ground moisture and makes future plumbing work easier, which matters on a damp coastal lot. It adds cost and a step at the entry.
  • Roof system: A low-slope membrane with corrosion-resistant flashing is the right move for a coastal Marina del Rey yard. A pitched shingle roof is cheaper per square foot but needs the same detailing attention on fasteners and drip edges to survive the salt fog.
  • Window and door package: Vinyl is the budget option and holds up reasonably in a mild climate. Aluminum with a thermal break and a proper coastal finish resists salt pitting better and looks sharper on a modern unit. Andersen and Marvin both make coastal-rated assemblies worth pricing.
  • Size and bedroom count: A studio or one-bedroom unit keeps you near the low end of the range. Two bedrooms or a separate office nook pushes toward the top. Every additional 100 square feet adds both material and utility capacity cost.
  • Kitchenette and bath scope: A full kitchen with a range and vent hood costs more than a compact kitchenette. A full bath with a tiled shower is worth the money; a prefab surround saves it and shows its age faster.

What New Detached ADU costs in Marina del Rey, CA

For a detached unit in Marina del Rey, budget $45,000 – $130,000 depending on size, site conditions, and finish level. A studio or one-bedroom with standard finishes lands near the bottom. A two-bedroom with upgraded envelope, coastal-rated windows, and a full kitchen lands near the top.

What moves the number:

  • Size and configuration: Every 100 square feet adds framing, envelope, and finish cost, and a second bedroom adds utility capacity.
  • Site conditions: A tight side yard, mature trees to protect, or a slope pushes excavation and foundation cost up.
  • Utility runs: The distance from the main panel and sewer lateral to the unit is a real line item. A long trench through a finished patio costs more than a short one across bare ground.
  • Material grade: Coastal-rated windows, corrosion-resistant hardware, and a tile or membrane roof all cost more than the inland default, and all are worth it here.
  • Permit scope: A straightforward plan set clears review faster; a complex lot with structural or coastal review adds permit fees and time.

A written estimate from us is line-item, so you see the foundation, framing, envelope, trades, and finishes broken out separately. What’s typically not included: landscape redesign beyond the tie-back, furniture, and any main-house work you decide to add later. If your plans grow into something bigger, that’s a conversation for our Home Additions & ADU service.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Marina del Rey homes specifically do to this job

The salt fog rolling off the water changes how we build here. Fasteners that would last a decade inland show rust staining in half that time, so we spec stainless or hot-dip galvanized hardware throughout the exterior and pay close attention to window frames, railings, and HVAC condensers. The marine layer also means condensation on cold-framed walls, which is why the wall assembly and roof detail matter more here than the finish palette. Flat and low-slope roofs dominate the marina’s contemporary and 1960s-70s architecture, so we use corrosion-resistant waterproofing systems rather than the conventional pitched-roof approach you’d see inland.

Buildable land is scarce in 90292, so most of our detached ADU work happens on lots with existing structures we have to work around, tucked behind a multifamily building or alongside a beach-era bungalow. The project is often part of a larger scope, so if the main house is also getting reworked, it’s worth looking at the Home Additions & ADU in Marina del Rey page for how the pieces fit together.

We cover the full Marina del Rey area, from the Admiralty Way corridor to the Washington Boulevard edges, and the coastal detail work is consistent across all of it.

Serving Marina del Rey, CA – Our Local Coverage Area

We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Marina del Rey

Get a free on-site estimate for your new detached ADU in Marina del Rey

We’ll walk your lot, check utility runs and setbacks, and give you a line-item written estimate for your new detached ADU in Marina del Rey before any work begins. No-hassle upfront pricing, no change orders, and 0% financing for 18 months if it helps. Call (888) 427-1733 to schedule. A live person answers around the clock.

Written by the team at Groundwork Construction Co.

Why Marina del Rey Chooses Groundwork Construction Co. of Los Angeles

We set the standard for new detached ADU in Marina del Rey.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Marina del Rey

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Marina del Rey Customers Say

Trusted by homeowners across Marina del Rey and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for New Detached ADU in Marina del Rey?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Marina del Rey.

(888) 427-1733

Request a Free Estimate in Marina del Rey

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch