Tub-to-Shower Conversion in Agoura Hills, CA: What It Involves and What It Costs
A tub-to-shower conversion in Agoura Hills runs $3,500 – $10,000 for the shower build itself, and most of our local tub-to-shower projects land inside that band. The work takes roughly two to three weeks of active construction: pull the tub and surround, rework the drain and valve, close the walls, waterproof, tile, set glass, and pass inspection. Call (888) 427-1733 for a free on-site estimate with a written, line-item quote.
How we run a Tub-to-Shower Conversion, stage by stage
Every conversion follows the same sequence. The specifics change with the room, but the order doesn’t, and knowing it up front means no surprises about why a project pauses on a Tuesday.
Day 1 – 2: Demo and inspection of what’s behind the walls
We pull the tub, the surround, and the old valve trim, then open the wall enough to see the framing and plumbing. This is where decisions get made fast. A 1970s Morrison Ranch ranch house often has galvanized drain lines and a valve with no scald protection; a newer foothill custom home usually has PEX and a pressure-balance valve already in place. You approve any plumbing upgrade before we close the wall, in writing, at the quoted price.
Day 3 – 5: Rough-in plumbing and rough inspection
The drain gets relocated from the tub position to the shower position, the valve gets set to code height, and we install the shower pan substrate or a prefab pan depending on what you picked. Then it gets inspected. A tub-to-shower conversion is a plumbing alteration, so it needs a permit, and the rough-in has to be signed off before anything closes up.
Day 6 – 8: Waterproofing
We build the slope, tape and seal the seams, and roll on a bonded waterproof membrane or set a cement backer with a liquid-applied system. This stage looks like nothing is happening. It’s the single most important one, because a shower that fails does it here, behind the tile, where you can’t see it for two years.
Day 9 – 13: Tile, grout, and glass
Tile goes up over the membrane, then grout and sealant. You’ll have picked the tile earlier, at the design consult, because lead times on some large-format and imported products run two weeks. Frameless glass is templated after the tile is set, not before, and installed a few days later.
Day 14 – 16: Final inspection and walkthrough
The final plumbing inspection clears the work. We run the shower, check the drain and the valve, look at the door swing and the caulk lines, and walk the room with you. Anything on the punch list gets scheduled before we consider the job closed.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
A conversion forces three real decisions, and each one moves the price. Here’s the honest version of each trade-off.
- Prefab pan vs. tiled shower floor. A prefab acrylic or fiberglass pan costs less and installs in a day with no grout to maintain. A tiled floor with a linear or center drain looks custom and ages better visually, but adds waterproofing labor and a few hundred to a couple thousand dollars.
- Tile grade and size. Standard ceramic 12×24 runs modest. Large-format porcelain and natural stone cost more per square foot and more in labor because of the precision cuts, and they need a flatter substrate. Porcelain holds up to California’s hard water better than natural stone, which etches and needs sealing.
- Glass. A framed slider is the least expensive enclosure. Frameless glass, whether a fixed panel with a hinged door or a full enclosure, adds cost but opens the room up and is what most buyers expect in a primary bath.
- Grab bars and blocking. We install wood blocking in the walls behind the tile as standard. That lets you add a grab bar later without tearing out tile. Best done now, while the walls are open.
- Shelving and niche. A recessed niche or a corner bench changes the framing and waterproofing plan, so reserve the space at the design stage.
What Tub-to-Shower Conversion costs in Agoura Hills, CA
The number for a tub-to-shower conversion in Agoura Hills lands between $3,500 and $10,000 for the shower work alone. If the conversion is part of a broader renovation, the wider project runs $9,000 – $28,000. Five variables push a job toward the low end or the high end:
- Room size. A standard 5×8 alcove fits a nominal 30×60 shower. Expanding into a larger footprint means moving walls.
- Existing condition. Galvanized or cast-iron drain lines, rot behind the surround, or a valve that fails inspection add plumbing work.
- Plumbing and electrical relocation. Moving the drain a foot is easy. Moving it across the room or adding a vent is not, and adding a shower light or exhaust fan pulls in a separate permit.
- Material grade. Builder-grade ceramic and a simple pan versus large-format porcelain, a tiled pan, and frameless glass is the difference between the bottom and top of the range.
- Permit scope. A straight fixture swap with inspection is one permit. Structural changes, new framing, or added ventilation broaden the scope and the inspection count.
A written estimate from us lists demo, disposal, rough plumbing, waterproofing, tile, fixtures, glass, permit fees, and final inspection as separate lines, so you can compare it to any other bid apples to apples. What it typically doesn’t cover: the cost of the shower valve and trim, glass, and tile if you’re buying your own materials, and any hidden damage found once the wall opens. We price that work before we do it, never after. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Agoura Hills homes specifically do to this job
Agoura Hills sits in the Santa Monica Mountains’ foothills along the 101, and the housing stock splits in two directions. The 1960s – 80s ranch and split-level homes in tracts like Old Agoura and Morrison Ranch are the ones we open up most often for a tub-to-shower conversion, and they carry the failures you’d expect from that era: original cast-iron or galvanized drains, drywall behind the surround instead of cement board, and a single valve with no scald protection. Old Agoura’s horse properties bring their own wrinkle. Large rural lots on private access roads mean a utility or septic scope that has nothing to do with the shower, and the conversion work has to fit around it.
The newer foothill and canyon homes come with a different set of constraints. The same wildfire-interface code environment that governs a roof under Chapter 7A shapes how we handle exterior venting and wall penetrations for an exhaust fan, and hillside lots in ZIP codes 91376 and 91301 mean grading and drainage come up before a permit clears. On steep canyon lots, that usually means a site check before we price, because the access road and the soil report can change what the job looks like.
Serving Agoura Hills, CA – Our Local Coverage Area
We serve Agoura Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Tub-to-Shower Conversion in Agoura Hills
Most conversions here run two to three weeks of active construction, with demolition and inspection out of the way in the first week. Add a week or two if we’re waiting on large-format or imported tile, since the design choices drive the lead time. Call (888) 427-1733 to get a schedule for your room.
Yes. A tub-to-shower conversion is a plumbing alteration, so it needs a permit and a rough and final inspection, and the city won’t clear the job without both. We pull the permits and manage the inspections, so you’re not the one chasing sign-offs. Call for a free estimate and we’ll walk you through the permit scope for your address.
Often, yes. If the existing drain and valve locations work for the new shower footprint, we keep them and the job stays at the lower end of the range. Moving the drain or adding a vent changes the plumbing scope and pushes the price up. An on-site estimate tells you which version you’re looking at.
Not without your written approval. We price hidden damage, such as rot or failed drain lines, before we do the work, not after. Your quoted number is your number. Call (888) 427-1733 and we’ll put it in writing.
Our work is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Whether the conversion is part of a full Bathroom Remodeling in Agoura Hills or a standalone job, the guarantee travels with the work.
Get a free on-site estimate for your tub-to-shower conversion
If you’re ready to price your tub-to-shower conversion in Agoura Hills, call (888) 427-1733 to schedule a free on-site estimate. A live person answers around the clock, so you’re never leaving a voicemail. We look at the room, check the plumbing, and hand you a written, line-item quote with the permit fee and the full scope spelled out. If you’re planning the wider room at the same time, we can scope it through our Bathroom Remodeling service, and if the roof on that same house is due, homeowners often pair this with Metal Roofing in Agoura Hills or Tile Roofing in Agoura Hills. We cover the whole of Agoura Hills and the surrounding canyons.