Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Vanities, Tile & Fixtures in Malibu, CA: What This Job Actually Involves
Replacing vanities, tile and fixtures in a Malibu bathroom typically runs $9,000 – $28,000 and takes two to four weeks on a straightforward job, longer where coastal permits or hillside access come into play. You’re choosing a vanity top and cabinet, floor and wall tile, a faucet and shower trim that survives salt air, and lighting that meets California’s efficiency rules. Call (888) 427-1733 and we’ll walk your specific room and give you a written, line-item estimate at no cost.
How We Run a Vanities, Tile & Fixtures Job, Stage by Stage
This is not a remodel. We’re swapping surfaces, cabinets and fixtures, so the sequence matters more than the calendar. Here’s how it actually goes.
Stage 1: Walkthrough and Decisions (Day 1, about 90 minutes)
We measure the vanity wall, check whether the existing plumbing rough-in sits where the new cabinet needs it, and look at the subfloor under the tile. You leave that visit having picked your tile size, your vanity width, and your faucet finish. If your heart is set on moving the sink six inches left, we tell you right there whether that’s a $300 adjustment or a $2,000 one.
Stage 2: Demo and Prep (Days 2 – 3)
Old vanity out, tile chipped up, backer board assessed. In Malibu we often find corrosion at the shutoff valves and pitting on the drain assembly from years of marine air, so we replace those while the wall is open rather than leaving a $12 part to fail behind a $2,000 vanity. Floor prep and waterproofing go down next; this is the stage that determines whether your tile lasts.
Stage 3: Tile Setting (Days 3 – 6)
Floor tile first, then shower walls or a tub surround if you’re re-tiling those. Large-format porcelain goes down faster than a mosaic with a thousand grout lines, which is one reason material choice moves the price. Grout cures overnight before anything heavy goes back on top.
Stage 4: Vanity and Fixture Set (Days 6 – 8)
Vanity set and leveled, countertop templated if it’s stone (add 5 – 7 days for fabrication), faucet and drain installed, mirror and lighting hung. Your decision here happens weeks earlier: quartz or stone, and whether you want the sink undermounted or a vessel bowl. Both change the lead time.
Stage 5: Final Walkthrough (Day 8 – 10, or after stone arrives)
We run every fixture, check for leaks at the supply lines, inspect the caulk lines and grout, and hand you the material names and care instructions. Anything not right gets fixed before we call it done, and the workmanship sits behind our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
The right answer depends on how long you plan to stay and how much salt air the room gets. Here’s the honest trade-off on each.
- Vanity cabinet: stock plywood boxes are the value pick; semi-custom painted or stained maple gives you the exact width and drawer layout. Skip particleboard in a steamy bathroom, it swells.
- Countertop: quartz holds up to water and makeup spills without sealing; natural stone looks richer but wants annual sealing, and marble etches. Prefab quartz tops keep the budget tight.
- Floor tile: large-format porcelain (12×24 or bigger) means fewer grout lines and less scrubbing; mosaic costs more to install because of labor, not material.
- Shower wall tile: glazed porcelain is the workhorse; natural stone needs more maintenance in a humid room.
- Faucet and trim: brushed nickel and matte black finishes hide water spots better than polished chrome in a coastal bathroom. Kohler is a solid benchmark brand; look for solid brass bodies over plated zinc.
- Lighting and vent fan: a quiet fan rated for your square footage matters more than the fixture style, and California efficiency rules push you toward LED.
What Vanities, Tile & Fixtures Costs in Malibu, CA
Expect $9,000 – $28,000 for vanities, tile and fixtures in a Malibu bathroom, with most single-vanity jobs landing in the $11,000 – $16,000 band. A small powder room re-tile sits near the bottom; a full primary bath with natural stone and a custom vanity climbs toward the top.
Five things move that number:
- Size of the room. Tile is priced by the square foot, so a 40-square-foot powder room and a 120-square-foot primary bath are different jobs.
- Existing condition. Rot behind a shower wall or a subfloor that flexes adds demo and prep time.
- Moving plumbing or electrical. Relocating a drain or adding a circuit is the fastest way to add cost. Keeping the rough-in where it is saves real money.
- Material grade. Porcelain versus marble, stock versus custom cabinetry, builder faucet versus Kohler.
- Permit scope. A cosmetic swap often needs no permit; moving plumbing or electrical draws one.
Your written estimate lists tile, cabinet, countertop, fixtures, labor and disposal as separate lines, so you see what each decision costs. It excludes anything we can’t know until walls are open, and we price those changes before touching them.
See the difference
Before
After
Before
After
Before
AfterWhat Malibu Homes Specifically Do to This Job
Nearly every Malibu bathroom sits in a house built between the 1950s and today, from PCH-frontage bungalows to canyon contemporary estates, and the salt spray and marine layer are the reason we spec corrosion-resistant fasteners and marine-grade hardware as standard here. In Latigo and Encinal canyon homes, deliveries and material loads have to be scheduled around narrow, winding grades, and getting a stone top up a steep driveway is its own logistical exercise. The fire-hardening codes that govern WUI properties along the chaparral edge shape what we can use on exterior walls we touch during a remodel, and if your project is part of a full Bathroom Remodeling in Malibu that shifts walls or adds a window, Coastal Commission review can add months before work starts. For a vanities, tile and fixtures swap inside the existing envelope, you’re usually in and out without that step. If a roofline or exterior detail comes into play while we’re there, homeowners often pair this with Tile Roofing in Malibu.
Serving Malibu, CA – Our Local Coverage Area
We serve Malibu and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Malibu
Two to four weeks for a standard bathroom, and the stone countertop is usually the thing that sets the clock. Demo and prep take two to three days, tile setting another three to four, fixture set two, and custom stone fabrication adds five to seven days on top. Call (888) 427-1733 for a timeline on your room.
Not for a cosmetic swap where nothing moves. Replacing a vanity in the same spot, re-tiling a floor or wall, and hanging new fixtures typically need no permit. Moving plumbing or adding an electrical circuit does, and we tell you upfront which side of that line your job falls on.
Yes, and keeping the rough-in where it sits is the single best way to stay near the low end of the $9,000 – $28,000 range. Changing a vanity width from 36 to 48 inches works fine on the existing drain. Shifting the sink off-center by a foot is where cost climbs.
Most jobs land between $9,000 and $28,000, with a common bathroom in the low-to-mid teens. Tile square footage, cabinet grade, countertop choice and whether plumbing moves are the four levers. Call (888) 427-1733 for an exact quote on your room, estimates are free.
Every vanities, tile and fixtures project is covered by our 730-Day Done Right Promise. If a grout line cracks, a supply line weeps or a tile sets loose, we come back and make it right inside that window. Product warranties from the fixture and cabinet makers stack on top.
Get a Written Estimate for Your Malibu Bathroom
We’ll walk your bathroom, measure the tile and vanity, check the plumbing rough-in and hand you a line-item estimate at no cost. Before any work starts you’ll see the number and the scope in writing, with our 730-Day Done Right Promise behind it. Coverage runs across Malibu and the canyons, and homeowners often pair bathroom work with Specialty Roofing in Malibu. Call (888) 427-1733 to schedule.
If you’re still mapping out the wider scope rather than a tile-and-fixture swap, start with our Bathroom Remodeling service.
Written by the team at Groundwork Construction Co.