A Groundwork company - serving Los Angeles, CA
Full Kitchen Remodeling in Los Angeles, CA | Groundwork Construction Co. of Los Angeles

Full Kitchen Remodeling in Los Angeles - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Kitchen Remodeling in Los Angeles: What It Really Takes

Full kitchen remodeling in Los Angeles means gutting the room to the studs and rebuilding it – cabinets, counters, backsplash, sink and fixture, flooring, lighting, ventilation, and often the rough plumbing and wiring behind the walls. Most single-family kitchens here take 6 to 10 weeks of active construction once permits clear, and plan on 4 to 8 weeks of city review before that in most cases. Expect to spend $16,520 to $53,100 depending on size, condition, and finish level. Call (888) 427-1733 and we’ll walk you through what your kitchen actually needs.

Call (888) 427-1733

How a Full Kitchen Remodeling Project Runs, Stage by Stage

A full kitchen rebuild has a rhythm, and knowing it keeps you from making decisions on the wrong day. Here’s how we sequence it and what you own at each point.

Stage 1: Design and permits (weeks 1 – 6)

We measure, capture existing conditions, and draw the plan. You decide layout, cabinet line, and counter material now – not later. Permits get pulled for anything structural, electrical, plumbing, or mechanical; most Los Angeles kitchen remodels need them for at least one of those trades.

Stage 2: Demo and rough-in (days 1 – 6)

Day 1 is protection and demo. By day 3 the room is down to framing and we can see what’s actually behind the walls – old knob-and-tube, galvanized pipe, or a beam somebody cut in 1974. You approve any discovered-condition change in writing before we move forward. Rough plumbing, electrical, and HVAC run during this window.

Stage 3: Rough inspections and drywall (days 7 – 14)

The city inspects framing, electrical, plumbing, and mechanical before anything gets closed up. We don’t schedule drywall until we have sign-off. Once the walls close, we tape, texture to match, and prime.

Stage 4: Cabinets, counters, and finishes (days 15 – 38)

Cabinets land first, then the template for counters, then counter install, sink, and faucet. Backsplash, flooring, and paint follow. The template-to-install gap on stone counters is typically 7 to 10 days.

Stage 5: Trim, punch, and final inspection (days 39 – 55)

Pulls, hardware, lighting trim, and appliance hookup close it out. Final inspection, then a walkthrough with you where we write down anything you flag on a punch list and clear it. Most projects land inside that window; a structural surprise or a back-ordered cabinet line is what pushes it longer.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Kitchen

These are the decisions that move both the look and the budget. Pick them early.

  • Cabinet construction and finish. Framed vs. frameless, plywood vs. particleboard boxes, painted vs. stained vs. thermofoil doors. Painted MDF doors look great and cost less; they also chip at corners in a busy kitchen. KraftMaid offers solid configurations at a mid-to-high price point.
  • Counter material. Quartz is the low-maintenance pick – no sealing, uniform look. Natural stone (granite, marble) wears character but needs sealing and can stain. Cambria is a strong quartz option we specify often.
  • Layout change or not. Keeping the sink, range, and fridge where they sit saves significantly on plumbing and electrical rough-in. Moving them opens the room’s potential and adds real cost.
  • Structural work. Removing a wall to open the kitchen to the dining room means a beam and possibly a post. That’s a structural permit and engineering, and it’s worth doing only if the layout truly needs it.
  • Ventilation. A hood that actually vents outside, not recirculates, matters for a kitchen that gets real use. Ducting through a wall or roof adds scope but pays off in air quality and resale.
  • Flooring. LVP handles water and kids and installs faster. Tile holds up but is colder underfoot. Refinishing existing hardwood is a legitimate budget saver if the boards are sound.

What Full Kitchen Remodeling Costs in Los Angeles, CA

Full kitchen remodeling in Los Angeles runs $16,520 to $53,100 for a typical single-family kitchen. A small or partial rebuild sits lower – $10,620 to $23,600 – while cabinet installation alone lands $4,720 to $15,340 and countertop installation $2,360 to $7,670.

What pushes a job toward the top of the range:

  • Size and layout. A 120 sq ft galley costs far less than a 250 sq ft open-plan kitchen with an island. Island installation alone runs $3,540 to $11,800.
  • Existing condition. Undersized wiring, galvanized pipe, dry rot, or a badly framed wall turn a clean job into a repair job.
  • Relocating services. Moving the sink or range means new drain lines, venting, and circuits – a real line item you should see spelled out.
  • Material grade. Stock cabinets vs. a sem-custom line like KraftMaid, laminate vs. quartz (Cambria), vinyl vs. hardwood flooring. These compound across the whole room.
  • Permit and structural scope. Any wall removal, beam, window change, or new mechanical work adds review time and trade cost.

A written estimate from us is line-item: demo, rough-in, inspections, cabinetry, counters, backsplash ($945 to $2,950), flooring, fixtures, labor, and permit fees. It states what’s included and what isn’t, so the number you see is the number you pay. We don’t leave “TBD” on the sheet.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Los Angeles Homes Do to This Job

Kitchens here are rarely a simple swap. The city’s housing stock is a patchwork – 1920s to 1940s Spanish Colonial and Craftsman bungalows on the flats, postwar 1950s to 1960s stucco tract homes, and thousands of 1960s and 1970s wood-frame dingbats – and each era brings its own surprises to a gut remodel. In the older bungalows off Echo Park and Silver Lake, we regularly open walls to find knob-and-tube wiring and original galvanized plumbing that has to be replaced before anything else can proceed. In the hills, everything changes.

Los Angeles construction answers to some of the strictest seismic and fire-zone rules in the country. Kitchen remodels on hillside lots in the Hollywood Hills and the Santa Monica Mountains run into pier-and-grade-beam foundation realities and slope engineering, and any structural wall change there means engineering review, not just a permit. That’s before you get to wildland-urban-interface fire code: ignition-resistant detailing and materials increasingly apply to the hillside neighborhoods where the Santa Ana winds drive fire into the urban edge. In the postwar flats, electrical service is the common bottleneck – a faithful kitchen rebuild often requires a panel upgrade to carry the new circuits.

We work the whole city and the neighborhoods around it, including Culver City and Santa Monica, and the permitting reality is the same story in each: our kitchen remodeling service pulls the permits and carries the project through inspection so you’re not the one chasing sign-offs. Homeowners often pair this with full bathroom remodeling in Los Angeles to keep the same crew and schedule across both rooms.

Serving Los Angeles, CA – Our Local Coverage Area

We serve Los Angeles and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Kitchen Remodeling in Los Angeles

Get a Free Estimate on Your Los Angeles Kitchen

Call (888) 427-1733 to schedule a free on-site estimate for full kitchen remodeling in Los Angeles. A live person answers, day or night. We’ll measure the room, talk through your layout and finish options, and hand you a written line-item quote with a fixed price – no change-order surprises, 0% financing for 18 months, and $1,000 off projects over $10,000. Homeowners on both projects often pair this with walk-in showers and shower remodeling in Los Angeles to keep the same crew on both rooms.

Written by the team at Groundwork Construction Co.

Why Los Angeles Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full kitchen remodeling in Los Angeles.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Los Angeles

Getting your full kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Los Angeles Customers Say

Trusted by homeowners across Los Angeles and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Kitchen Remodeling in Los Angeles?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Los Angeles.

(888) 427-1733

Request a Free Estimate in Los Angeles

Tell us about your full kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch