A Groundwork company - serving Los Angeles, CA
Full Kitchen Remodeling in Santa Monica, CA | Groundwork Construction Co. of Los Angeles

Full Kitchen Remodeling in Santa Monica - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Kitchen Remodeling in Santa Monica: Scope, Timeline, and Cost

Full kitchen remodeling in Santa Monica runs $14,000 – $45,000 and takes six to ten weeks of work once permits clear. That number covers a gut renovation: new cabinets, counters, flooring, backsplash, lighting, and fixtures, with the walls opened down to studs and brought up to current code. A small galley off Ocean Park Road sits near the low end; a 90402 kitchen with relocations and custom millwork lands high. Call (888) 427-1733 for a free on-site estimate and a written line-item quote.

Call (888) 427-1733

The Stage-by-Stage Process for a Full Kitchen Remodel

Once permits are in hand, the sequence below is what actually happens. Each stage has a decision attached, and late decisions are the most common reason a Santa Monica kitchen stretches past ten weeks.

Stage 1: Demo and protection (days 1 – 4)

We pull the cabinets, counters, appliances, and flooring, then protect the rest of the house with tarps and zipper-door barriers to contain dust. Say so now if you plan to stay in the home during construction, since living space needs to be sealed off before demo starts. On older stucco homes south of Wilshire, this is also when we find the surprises: old galvanized supply lines, knob-and-tube wiring, or a wall that was never properly framed.

Stage 2: Rough-in and framing (days 5 – 14)

Plumbers and electricians run new lines for the sink, dishwasher, range, and any relocated outlets. This is when the layout is locked in for good: decide before rough-in whether you’re moving the sink to face the window, adding an island with a prep sink, or upgrading to a 240-volt line for an induction range. Your inspector signs off on the rough-in before anything closes up, so this stage is the single biggest scheduling variable in the whole job.

Stage 3: Insulation, drywall, and patch (days 15 – 22)

After rough-in inspection passes, walls close up and the room starts looking like a room again. This is your window to decide on recessed lighting positions, under-cabinet outlets, and any wall texture match – a real consideration in the 1920s – 40s bungalows where texture matching can be the difference between a seamless patch and a visible seam.

Stage 4: Cabinets, counters, and tile (days 23 – 40)

Cabinets go in first and settle for a few days before the counter template is measured. Stone counters like Cambria quartz get fabricated off-site, which adds a week; that gap is when backsplash tile and flooring go down. Decide on counter edge profile, backsplash pattern, and cabinet hardware placement before the template visit, because changes after that point ripple through the schedule.

Stage 5: Final trades and punch (days 41 – 55)

Appliances slide in, plumbing fixtures and lighting get hooked up, and the punch list closes out. Your final inspection follows. Homeowners often pair this timing with a Full Bathroom Remodeling in Santa Monica, since the dust and disruption overlap and the same crew can knock out both in one window.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the design decisions on a full kitchen remodel come down to five categories. Here’s the honest trade-off for each.

  • Cabinet construction and finish. Plywood-box cabinets with a factory finish hold up to coastal humidity far better than particleboard, which swells near a sink or dishwasher leak. Painted MDF doors look flawless on day one but chip at door edges within a few years of daily use; thermofoil and laminate doors resist moisture but can peel in a hot, steamy kitchen. KraftMaid sits in the curated portfolio we work with, and the honest answer is that a mid-grade plywood box with a good finish beats a premium name bolted onto a weaker box. Budget $4,000 – $13,000 for cabinet installation as part of the wider job.
  • Countertop material. Quartz (Cambria included) is non-porous and forgiving; granite needs annual sealing; butcher block is warm but warps near a sink. For a Santa Monica kitchen with daily cooking, quartz wins on maintenance, and the cost difference fades over a decade. Budget $2,000 – $6,500 for countertop installation.
  • Flooring. Porcelain tile handles moisture and heavy traffic for decades. Engineered hardwood looks great but shrugs off less than you’d hope in a kitchen. Luxury vinyl plank is the budget play and the honest weak point is at seams near the dishwasher. Pick based on how hard the household is on floors.
  • Layout: galley, L-shape, or island. A galley maximizes counter run in a narrow footprint; an L-shape opens sightlines to the living room; an island adds prep space and seating but eats floor area. A kitchen island installation runs $3,000 – $10,000 depending on size and whether it carries a prep sink or cooktop.
  • Fixtures and lighting. Kohler sits in our brand mix. Under-cabinet LED strips are cheap to run and earn their cost; a statement pendant over an island is a design choice, not a functional one. Pick fixtures before rough-in so the electrician wires the right circuit.

What Full Kitchen Remodeling Costs in Santa Monica, CA

Full kitchen remodeling in Santa Monica runs $14,000 – $45,000. A small kitchen remodel lands $9,000 – $20,000; a backsplash installation adds $800 – $2,500; a kitchen island installation adds $3,000 – $10,000. Those ranges are the market, and here’s what moves a job from one end to the other.

Four variables that change the number:

  • Size and layout. Square footage drives cabinet and counter cost directly, but a tighter galley with a good layout often costs less to renovate than a sprawling open-plan room that needs structural work.
  • Existing condition. A 1960s kitchen with intact plumbing and wiring is cheaper than a 1930s home with galvanized pipe, undersized wiring, and a floor that needs leveling – and in Santa Monica, the older stock is exactly where these surprises hide.
  • Relocating plumbing, electrical, or structure. Moving a sink to the opposite wall or taking out a load-bearing wall is the single biggest cost swing. Removing a wall can require a beam, engineering, and a permit amendment, all of which adds time and budget.
  • Material grade and permit scope. Builder-grade cabinets and laminate counters sit at the low end; custom millwork and stone at the high. A permit for a cosmetic refresh is smaller than one that includes structural and electrical scope. We pull the permits and see them through to inspection, and our written line-item estimate spells out what’s included so there are no change orders.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Santa Monica Homes Do to This Job

Santa Monica’s housing stock is the reason a full kitchen remodel here looks nothing like the same job in a newer suburb. Most of the city is mid-century low-rise stucco: 1920s – 40s Spanish and Craftsman bungalows south of Wilshire and around Ocean Park, 1960s and ’70s wood-frame buildings along Lincoln and Pico, and large luxury remodels up in the 90402 flats. When we open a wall in a 1930s bungalow, we plan for structural retrofit and foundation work rather than assuming clean framing. The coastal corridor around the beach also sits under California Coastal Commission jurisdiction, which can add a permit layer for anything within the coastal overlay, and Santa Monica’s plan-check runs slow enough that we build that time into the schedule up front. Salt air off Santa Monica Bay corrodes flashing and fasteners faster than inland, and the June Gloom/dry-summer cycle keeps stucco cracking, so we spec galvanized and coated hardware where an inland job might use plain steel. Homeowners should know this applies to exterior fasteners and window flashing more than interior cabinetry, but it’s why we inspect Santa Monica homes for rust and water intrusion during demo, not just for cosmetic wear.

Serving Santa Monica, CA – Our Local Coverage Area

We serve Santa Monica and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Kitchen Remodeling in Santa Monica

Schedule a Free Estimate for Full Kitchen Remodeling in Santa Monica

Call (888) 427-1733 to schedule a free on-site estimate for full kitchen remodeling in Santa Monica. We’ll measure the space, walk through your layout options, and hand you a written line-item quote within a few days, with no vague “allowances” and no surprise change orders. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off. A live person answers the phone, day or night.

Written by the team at Groundwork Construction Co..

Why Santa Monica Chooses Groundwork Construction Co. of Los Angeles

We set the standard for full kitchen remodeling in Santa Monica.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Santa Monica

Getting your full kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

Trusted by homeowners across Santa Monica and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Kitchen Remodeling in Santa Monica?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Santa Monica.

(888) 427-1733

Request a Free Estimate in Santa Monica

Tell us about your full kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch