Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Marina del Rey, CA: What It Involves and What It Costs
Full kitchen remodeling in Marina del Rey typically runs $14,000 – $45,000 and takes four to eight weeks of construction, with the schedule set by how far plumbing, electrical and walls have to move. The work covers gutting the space down to framing, rerunning rough-in, installing new cabinets, counters and finishes, and passing inspection on anything structural or mechanical. Call (888) 427-1733 for a free on-site estimate before you commit to a number.
How the Job Actually Runs, Stage by Stage
A full kitchen remodel is a sequence, not a blur of activity. Here’s the honest order of operations, with what you’re deciding at each stage.
Stage 1: Site review and drawings (days 1 – 5)
We measure the room, check what’s behind the existing cabinets, and confirm your layout. You decide whether the sink stays put and whether the range keeps its current gas or electrical location. If a wall comes out, we confirm on the spot whether it’s load-bearing before anything gets drawn.
Stage 2: Permits and material selection (days 5 – 20)
Anything touching plumbing, electrical, gas or structure needs a permit and inspection. While that’s filed, you lock in cabinet door style, counter material and flooring. The choice between KraftMaid cabinetry and a stock line, or a Cambria quartz against a mid-range stone, is a cost-and-timeline decision as much as a look decision.
Stage 3: Demo and rough-in (days 1 – 6 of construction)
Cabinets, counters and flooring come out first. Then the plumbing and electrical rough-in goes in, followed by the framing for any moved wall or new window. This is the inspection point. Nothing gets closed up until it passes.
Stage 4: Drywall, finishes and install (days 6 – 30)
Insulation and drywall go up, then primer and paint, then flooring. Cabinets arrive and set, then counters get templated and installed, then appliances and fixtures land. Cabinet delivery is the single biggest schedule variable on any kitchen we build, and we tell you the lead time upfront rather than discovering it later.
Stage 5: Final walkthrough (final 1 – 2 days)
We test every appliance, check door alignment and drawer glide, verify caulk and sealing, and walk the room with you. Anything on your punch list gets fixed before we close the job. The whole thing is covered under our 730-Day Done Right Promise: if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape a Full Kitchen Remodel
Every full kitchen remodel comes down to five or six decisions, and each one has a real trade-off. Here’s how we talk through them with homeowners.
- Cabinet construction: stock or semi-custom cabinets land in the $4,000 – $13,000 range and hit faster timelines; full custom costs more and adds weeks. For a condo or townhome with tight clearances, semi-custom usually gets you the fit without the custom price.
- Counter material: quartz holds up to heat and daily wear and needs no sealing, which suits a busy household. Natural stone looks richer but stains and requires annual sealing. Laminate is the budget option and shows its age fastest.
- Layout: keeping the sink and range where they are avoids relocating plumbing and gas, which is one of the biggest cost levers. Moving them opens options but pushes the number up.
- Flooring: porcelain tile handles a wet, busy marina kitchen well; engineered wood looks warmer but needs care near the sink. Luxury vinyl plank is the durable middle ground.
- Lighting and ventilation: a proper range hood vented to the exterior matters more in a tight marina unit than in an open inland home. Under-cabinet lighting is cheap to add during the build and awkward to retrofit.
- Appliance package: a full matching set can swing a budget by several thousand dollars depending on brand tier. We price it as a line item, not a lump.
What Full Kitchen Remodeling Costs in Marina del Rey, CA
A full kitchen remodel in Marina del Rey runs $14,000 – $45,000. A small kitchen remodel in a tight condo sits closer to $9,000 – $20,000. Cabinets run $4,000 – $13,000, countertops $2,000 – $6,500, backsplash work $800 – $2,500, and a kitchen island, if you’re adding one, $3,000 – $10,000. These are market ranges, and your written estimate will itemize every line.
Five variables push a Marina del Rey kitchen to the low or high end:
- Room size. A galley kitchen in a 1960s mid-rise is a different job than a wide-open contemporary floor plan.
- Existing condition. Original plumbing from a 1970s building often means surprises once the wall opens.
- Relocating services. Moving the sink, range or a wall adds both labor and permit scope.
- Material grade. Stock cabinets and laminate counters against KraftMaid and quartz is a real spread.
- Permit scope. Cosmetic-only work is faster and cheaper to permit than structural or mechanical changes.
Your written estimate itemizes demo, rough-in, materials, labor and permit fees. What it typically doesn’t include is unforeseen structural repair once walls are open, appliance delivery beyond the standard, or HOA-related fees. Upfront pricing means the number you see is the number you pay, with no change orders for the scope we quoted. Call (888) 427-1733 for an exact figure.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey Homes Do to This Job
Marina del Rey is almost entirely a waterfront-adjacent remodel market. Buildable land is scarce, so the work happens inside 1960s – 1980s mid-rise condos, contemporary townhomes and high-rise infill, with a handful of surviving beach-era bungalows. That mix changes the job.
In the older mid-rises off Admiralty Way and along the Washington Boulevard corridor, we regularly find original galvanized plumbing and rust-stained fasteners behind the cabinets. Salt-laden air rolls off the water nightly and attacks metal faster here than anywhere inland. Marine-layer damp causes condensation on cold-framed walls, so we spec corrosion-resistant hardware and check wall assemblies before closing them up. Condo HOA rules govern construction hours, elevator use and disposal, and that affects the schedule before a single cabinet comes out. The whole 90292 area falls under these conditions. When the remodel is part of a full Kitchen Remodeling in Marina del Rey plan, we sequence the trades to fit those constraints.
On the newer towers and townhome infill, the challenge shifts to tight clearances, glass-and-steel envelopes and ventilation. Homeowners often pair this with Full Bathroom Remodeling in Marina del Rey and Walk-In Showers & Shower Remodeling in Marina del Rey when they’re already in the building. If you’re expanding scope across the house, look at our broader Kitchen Remodeling service, and see how we cover Marina del Rey for the full picture.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in Marina del Rey
Most take four to eight weeks of construction, with cabinet lead time the biggest schedule variable. Permitting can add one to three weeks before construction starts depending on scope. Call (888) 427-1733 to get a timeline for your specific space.
Yes, if the work touches plumbing, electrical, gas or structure, it needs a permit and inspection. Cosmetic-only work like paint and countertop swaps may not. We pull permits for you and coordinate inspections so nothing closes up unapproved.
Yes, and it’s the most cost-efficient approach. Keeping the sink, range and walls where they are avoids rough-in work and trims the permit scope. Most marina condo kitchens can be fully updated this way.
Expect $14,000 – $45,000 for a full kitchen remodel, with smaller condo kitchens toward the low end. Cabins, counters, flooring and appliance tier each move the number. Call (888) 427-1733 for an itemized estimate, and estimates are free.
Every full kitchen remodel we complete is covered by our 730-Day Done Right Promise. If something’s not done right, we make it right within that window. The warranty is in writing, not fine print.
Get a Free Estimate for Your Marina del Rey Kitchen
Call (888) 427-1733 to schedule a free on-site estimate for full kitchen remodeling in Marina del Rey. You’ll get a written line-item quote, a realistic timeline, and straight answers on permits and material choices. Our technicians have up to 12 years of experience, all background-checked and arriving in uniform. Live person answers every call, 24/7.
Written by the team at Groundwork Construction Co.