Cabinets & Countertops in Marina del Rey, CA: What the Job Actually Involves
Cabinets & countertops in Marina del Rey typically run $14,000 – $45,000 for a full tear-out and replacement, and most condo kitchens here wrap up in two to four weeks from demo to final countertop install. The number swings with box construction, stone grade, and whether we’re opening a wall or relocating a sink. Call (888) 427-1733 and we’ll price your exact layout before you commit to anything.
Marina del Rey kitchens are not like inland kitchens. The housing is dense, the parking is tight, and the marine air is relentless. That shapes every decision we make once we’re on site.
How We Run a Cabinet & Countertop Project in Marina del Rey
Every job moves through the same five stages. Here’s what happens and when.
Stage 1: On-site measure and scope (Day 1, about 90 minutes)
We measure every wall, check for out-of-square corners (common in 1960s – 80s mid-rises off Admiralty Way), and note where plumbing, gas, and electrical land. You decide the cabinet line and door style here, because lead times drive everything downstream. KraftMaid and similar semi-custom lines generally run three to five weeks; stock boxes can ship in days.
Stage 2: Demolition and protection (Day 2, one day)
We pull old cabinets and countertops, cap the water lines, and protect floors and adjacent rooms. In condo buildings we coordinate elevator reservations and haul-away with building management, which is a real scheduling item in Marina del Rey where service elevators are often booked.
Stage 3: Rough-in and repair (Days 3 – 5)
If you’re keeping the plumbing layout, this is quick. If we’re moving the sink or adding a dishwasher circuit, an electrician and plumber come through here. Walls get patched and squared, and we confirm the cabinet layout against the actual opening before ordering anything custom.
Stage 4: Cabinet install and countertop template (Days 5 – 10)
Base and wall cabinets go in, shimmed and leveled. Stone countertops get templated only after cabinets are set, because a template taken before install is a guess. Fabrication takes five to seven business days for most quartz and granite slabs.
Stage 5: Countertop set, plumbing reconnect, punch list (Days 10 – 18)
The slab goes down, the sink and faucet reconnect, and we walk the job with you. Anything on the punch list gets fixed before we call it done. The whole sequence is covered by our 730-Day Done Right Promise – if it’s not right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the decisions happen in the first week. Here’s what matters and what each choice does to your budget and your life over ten years.
- Stock vs. semi-custom cabinets. Stock boxes are cheaper and faster but limited in size, which means filler panels in odd spaces. Semi-custom lines like KraftMaid let you hit the wall exactly, at roughly 15 – 25% more. In tight Marina del Rey galley kitchens, semi-custom usually wins because there’s no room for wasted inches.
- Plywood vs. particleboard boxes. Plywood holds up better to the marine-layer humidity that builds up in coastal condos. Particleboard is fine in dry inland rooms; here it swells at seams over time.
- Quartz vs. granite vs. quartzite. Quartz is non-porous and needs no sealing, which suits a kitchen used daily. Granite is natural and heat-tolerant but needs resealing each year. Quartzite is the hardest of the three and the priciest.
- Door finish. Painted MDF looks clean but chips at corners. Thermofoil resists moisture but peels in heat near a range. Wood veneer and lacquer cost more and last longer.
- Hardware and soft-close. Soft-close hinges and drawer slides add $400 – $1,200 depending on cabinet count. Worth it in a rental-heavy building where drawers get slammed.
What Cabinets & Countertops Cost in Marina del Rey, CA
A full cabinet and countertop replacement in Marina del Rey runs $14,000 – $45,000. Here’s where the money goes.
| Line item | Typical range |
|---|---|
| Cabinet installation (supply + labor) | $4,000 – $13,000 |
| Countertop installation (supply + fabricate + set) | $2,000 – $6,500 |
| Backsplash install | $800 – $2,500 |
| Island install (if adding one) | $3,000 – $10,000 |
| Plumbing/electrical relocation (if needed) | $600 – $3,500 |
What pushes a job to the high end: relocating the sink or range (which means new plumbing and often an electrical permit), knocking out a non-load-bearing wall, choosing quartzite over quartz, and going semi-custom in a kitchen with odd angles. What keeps it low: keeping the plumbing where it is, choosing stock boxes, and skipping the island.
Every written estimate is line-item. The number you see is the number you pay. We pull the permits, we handle inspections, and if something changes mid-job we come to you with a written change order before anyone touches a tool.
If your cabinets and countertops are part of a bigger project – new flooring, lighting, layout changes – that’s Kitchen Remodeling in Marina del Rey, and we scope the whole thing under one estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey Homes Do to This Job
Marina del Rey isn’t inland construction with an ocean view. The housing stock is dominated by 1960s – 1980s mid-rise apartments and condos, with contemporary high-rise and townhome infill layered in since. That means most of what we work on is multifamily: a unit inside a building with an HOA, a service elevator, and a parking situation that requires scheduling deliveries instead of parking a truck.
The salt air is the other variable. In a 1970s Admiralty Way condo, cabinet hinges and drawer slides come out rust-stained, because salt fog rolls off the water every night. We specify stainless or coated hardware as a default here, not an upgrade. The marine layer also drives condensation against cold exterior walls, so we check insulation before setting base cabinets against an outside wall.
Permits and HOA rules are the third factor. Most Marina del Rey condo remodels need HOA approval before work starts, and if we’re relocating plumbing or gas, the city will want permits pulled and inspected. We handle both. That’s a core part of our kitchen remodeling service across Marina del Rey.
Homeowners often pair this cabinet project with Walk-In Showers & Shower Remodeling in Marina del Rey or a Tub-to-Shower Conversion in Marina del Rey, since a condo remodel often runs across both rooms at once.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Marina del Rey
Most jobs take two to four weeks from demo to final install, with cabinet lead time as the biggest variable. Stock boxes ship in days; semi-custom KraftMaid-style lines take three to five weeks. Call (888) 427-1733 for a timeline tied to your specific cabinet choice.
A straight cabinet and countertop swap usually doesn’t need a permit; moving plumbing, gas, or electrical does. If we’re relocating the sink or adding a circuit, we pull the permit and coordinate the inspection. Call (888) 427-1733 and we’ll tell you before you sign anything.
Yes, and most Marina del Rey condo projects keep the existing plumbing and layout intact. That keeps cost and permitting simple. If the space is tight, we work around the sink and range rather than moving them. It’s a call we make with you on site.
The full range is $14,000 – $45,000, with cabinet-only work landing near the bottom and full replacement with an island, new plumbing, and a stone upgrade at the top. Call (888) 427-1733 for a line-item estimate – it’s free and there’s no pressure.
Every job is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something fails, we come back and fix it. That’s on top of manufacturer warranties on cabinets and countertop surfaces.
Get a Free Estimate for Cabinets & Countertops in Marina del Rey
Call (888) 427-1733 to schedule a free on-site estimate. We’ll walk your kitchen, measure everything, and hand you a written line-item quote with a firm price. No surprise change orders, no vague scope. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Estimates are free.
Written by the team at Groundwork Construction Co.