Tub-to-Shower Conversion in Marina del Rey: Cost, Timeline, and What Actually Happens
A tub-to-shower conversion in Marina del Rey typically runs $3,500 – $10,000 and takes 5 to 10 working days once permits clear. The job means pulling the old tub and its surround, reworking the drain and valve, waterproofing the wet wall, and setting a new shower pan, tile, and glass. Most 1960s – 80s marina condos land in the $5,000 – $8,000 middle because original plumbing needs a partial re-pipe. Call (888) 427-1733 for a free on-site estimate before you commit to a scope.
How our Tub-to-Shower Conversion process runs, stage by stage
Every conversion follows the same order. The stages don’t change much from one condo to the next, but the durations and the decisions you’ll be asked to make at each one do.
Stage 1: Measure, open the wall, confirm what’s behind it (Day 1)
We protect the hallway and flooring, then demo the tub, surround, and any furring. A 60-inch alcove tub comes out in about 90 minutes. The real work is the next hour: we open a 12-inch inspection panel and look at the drain line, the valve body, and the studs. In Marina del Rey mid-rises you’ll usually find galvanized drain pipe that’s near the end of its life and a valve that’s a two-handle original. You decide here whether to replace the drain run back to the stack while the wall is open. Doing it now costs $600 – $1,400; doing it later means tearing out new tile.
Stage 2: Rough-in plumbing and inspection (Days 2 – 3)
If you’re keeping the drain location, this is a half-day. If you’re moving it 12 – 18 inches to fit a wider pan, this is where the floor gets opened and the waste line re-sloped. A new pressure-balance or thermostatic valve goes in at the same height as the old one unless you’re adding a hand shower. We schedule the rough plumbing inspection before anything closes up. Coastal buildings sometimes have tight mechanical chases, and we plan around that before demo starts, not after.
Stage 3: Waterproofing and backer (Days 3 – 4)
The studs get sistered where the old furring was thin, then cement backer or a bonded waterproof membrane goes up. We use a liquid-applied membrane over cement backer in most marina condos because the marine layer keeps wall cavities damp longer than inland. The pan gets a pre-slope, liner or bonded membrane, and a flood test that sits overnight. Skipping the flood test is the single most common shortcut we see on owner-builder jobs, and it’s the reason pans leak into the unit below. You don’t decide anything in this stage, but you’ll get a photo record of the flood test.
Stage 4: Tile, glass, and trim (Days 5 – 8)
Wall tile sets over two days depending on format. Large-format 24×48 porcelain goes faster than a 3×6 subway pattern with a niche. The pan gets mosaic for grip. You choose the tile, the grout color, the niche layout, and the glass type here. Frameless glass runs $900 – $1,800 more than framed; a fixed panel with a hinged door is the common choice in a 60-inch alcove. Final grout and silicone cure overnight before the first shower.
Stage 5: Final inspection, punch, walkthrough (Days 9 – 10)
The final plumbing and building inspection happens once fixtures and glass are in. We walk the shower with you, run water on both the valve and the hand shower, check the pan drain, and note any punch items. Anything on the punch list gets fixed under the 730-Day Done Right Promise. That guarantee covers workmanship for two full years, which matters more on a wet-wall assembly than on almost any other room in the house.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Tub-to-Shower Conversion options you’ll actually pick between
The scope decisions are yours. Here’s what each choice really costs in money, durability, and upkeep.
- Pre-fab acrylic pan and surround ($3,500 – $5,500 installed): The fastest path. A one-piece or three-piece acrylic unit sets in a day and wipes down in seconds. Trade-off: it looks like a rental, and sun exposure through a bathroom window fades acrylic over 10 – 15 years.
- Tile with a bonded waterproof pan ($5,500 – $10,000 installed): The look most marina buyers want. Porcelain or ceramic tile holds up to salt air better than natural stone, which needs annual sealing in a coastal bathroom.
- Drain location: Keeping the existing drain keeps the floor intact. Moving it 12 – 18 inches to open up the shower costs $500 – $900 in plumbing and floor patching. Worth it if you’re going curbless.
- Curb vs. curbless: Curbless needs a recessed floor and a longer pan build. It adds $1,200 – $2,500 and suits a homeowner planning to age in place. Standard 4-inch curb is fine for most condos.
- Valve and trim: A pressure-balance valve ($350 – $600 installed) is the code-minimum standard. Thermostatic ($700 – $1,100) prevents scalding if someone flushes a toilet mid-shower, worth considering in a shared bathroom. Kohler and Moen both make trim lines that match a marina condo’s original 1970s fixtures if you’re keeping the vintage look.
- Niche and bench: A recessed niche adds $250 – $500. A corner bench adds $400 – $900 in tile and framing. Skip the bench if the alcove is only 30 inches wide.
What Tub-to-Shower Conversion costs in Marina del Rey, CA
The full range here is $3,500 – $10,000. The floor-to-ceiling spread isn’t random; five variables push a Marina del Rey job toward one end or the other.
| Line item | Typical range |
|---|---|
| Demo and haul-away | $300 – $600 |
| Rough plumbing (valve and drain) | $700 – $2,000 |
| Waterproofing and backer | $600 – $1,400 |
| Tile and setting | $1,200 – $3,500 |
| Pan and curb build | $500 – $1,200 |
| Glass and door | $400 – $1,800 |
| Permits and inspection fees | $200 – $700 |
| Fixtures (valve, head, drain trim) | $300 – $1,200 |
What moves the number: alcove size (a 48-inch conversion is cheapest; a 60-inch with a bench is not); whether the existing drain and valve are repairable or must be replaced; whether tile is ceramic or a large-format through-body porcelain; whether the floor needs structural patching for a curbless build; and whether the building requires plan review or a separate plumbing permit.
A written estimate from us breaks out each line above so you can see what’s in and what’s out. What we don’t include unless specified: moving the drain to a different wall, adding a second shower head, and any drywall or paint outside the shower enclosure. Those get quoted as separate line items before we start. Our no-hassle upfront pricing means the number you see is the number you pay; no change orders after demo.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey homes specifically do to this Tub-to-Shower Conversion
Most of the work is in the 1960s – 80s mid-rise condos and apartment conversions clustered around Admiralty Way and Washington Boulevard, and those buildings change the job in ways an inland house never does. The marine layer rolls in nightly off the marina, and wall cavities in a 1970s condo with no interior vapor control stay damp far longer than drywall in Culver City. We build every shower wall with a bonded membrane and a vapor-tight assembly rather than relying on painted-on water stop, and we spec stainless or hot-dipped galvanized fasteners because salt fog attacks anything less inside a season. That same corrosion pressure eats at the two-handle chrome valves common in these buildings; if the valve body is pitted, it gets replaced, not repaired.
Your building likely triggers a plumbing permit through Los Angeles County rather than the city, and HOA architectural review sets the glass tint and any visible tile. Buildings near the marina also see more slab moisture because a 1960s – 70s flat/low-slope roof over an interior bathroom can trap condensation; if we spot staining, we flag it and you can pair the conversion with a call to our team about Metal Roofing in Marina del Rey or a repair to the existing membrane. If you’re reworking more than the shower, that’s where the wider scope lives: our Bathroom Remodeling in Marina del Rey page covers everything outside the shower footprint. Every conversion starts as a walkthrough of your Marina del Rey unit, and we work from there.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Tub-to-Shower Conversion in Marina del Rey
Most conversions run 5 to 10 working days from demo to final inspection, with the median at 7. Building permits and HOA approval add 2 to 5 weeks before work can begin. Call (888) 427-1733 to schedule a walkthrough and get an exact timeline for your unit.
Yes, in nearly every case. Los Angeles requires a plumbing permit any time you replace a shower valve or alter a drain, and a building permit when you change the pan or wall configuration. We pull the permit and handle inspection scheduling as part of the job. Call (888) 427-1733 and we’ll tell you what your building will trigger.
Yes, and that’s the cheapest version of this job at $3,500 – $5,500. Keeping the drain and valve in their existing locations leaves the floor and chase intact, and a 60-inch alcove tub swaps out for a 60-inch shower pan with no framing change. You lose the option of a curbless build, but you save $1,500 or more. Call (888) 427-1733 for a scope that fits your unit.
The range is $3,500 – $10,000, with a typical marina condo landing at $5,000 – $8,000. The spread comes down to drain relocation, tile grade, glass type, and whether the original valve and drain are reusable. Call (888) 427-1733 for a free, line-item estimate.
Every conversion we do is covered by the 730-Day Done Right Promise: if the workmanship fails, we make it right for two full years. That covers the waterproofing, tile setting, plumbing connections, and glass install. Manufacturer warranties on fixtures and valves pass through to you on top of that. Call (888) 427-1733 with warranty questions before you sign anything.
Get a free estimate for your Tub-to-Shower Conversion
Call (888) 427-1733 to schedule a free on-site estimate for your Tub-to-Shower Conversion in Marina del Rey. We’ll measure the alcove, open the wall plate to check the valve and drain, and hand you a written line-item quote with permits and timeline. Live person answers 24/7, so call whenever it’s on your mind. If it’s part of a larger rework, ask about our Bathroom Remodeling service; homeowners often pair this with Tile Roofing in Marina del Rey on flat-roof buildings. Financing at 0% for 18 months and $1,000 off projects over $10,000 are available.