Vanities, Tile & Fixtures in Marina del Rey: What a Real Bathroom Finish Package Costs
Vanities, tile & fixtures in Marina del Rey typically run $9,000 – $28,000 when the vanity, floor and wall tile, and plumbing fixtures are replaced without moving walls, and the work usually takes 2 – 3 weeks from demo to final walkthrough. Tile-setting alone eats 4 – 6 of those days because thinset and grout need full cure time before fixtures go back on. Call (888) 427-1733 for a free on-site estimate.
How We Run a Vanity, Tile & Fixture Job, Stage by Stage
Bathroom finish work has a fixed order. Skip a step and you’re tearing out a new vanity to reach something behind it. Here’s the sequence we follow on a typical Marina del Rey condo or bungalow bathroom.
Stage 1: Demolition and rough-in inspection (Day 1 – 2)
We pull the old vanity, toilet, and any tile set in thinset over drywall or a mortar bed. Old mortar-bed floors, common in 1960s mid-rise units, take most of a day to break out on their own. Once the substrate is exposed, we check for soft framing, water damage behind the vanity, and shutoff valves that haven’t turned in 30 years. You don’t decide anything here; we photograph and document what we find and flag anything that changes the scope.
Stage 2: Substrate and waterproofing (Day 2 – 4)
Cement board or a bonded waterproof membrane goes down before any tile. In a wet area this is the most important step and the one that gets skipped in cheap bids. You confirm now whether you’re tiling the walls floor-to-ceiling or stopping at a wainscot height, because it changes the material order and the waterproofing layout.
Stage 3: Tile layout approval and setting (Day 4 – 8)
We dry-lay tile and mark the layout so you can see grout-line placement before anything is permanent. Large-format tile needs a flatter substrate than 4-inch squares, so this is where a floor-leveling pour can add a day. Floor tile goes in first, then walls, then the shower surround if it’s part of the package. Grout cures 24 hours minimum before fixtures or glass touch it.
Stage 4: Vanity and fixture setting (Day 8 – 11)
The vanity cabinet is leveled and shimmed to the floor (rarely perfectly flat in these buildings), the countertop is set, and the sink, faucet, and drain get connected. Toilet, shower trim, and any lighting or exhaust fan go in the same window. You’ll confirm faucet finish and handle style before we set anything, since special-order finishes can add a week of lead time.
Stage 5: Caulk, touch-up, and final walkthrough (Day 11 – 14)
Silicone at every wet joint, grout sealer on natural stone, paint touch-up, and a walkthrough where we run every fixture and check for leaks and drain slope. You get the material care notes and warranty documentation at this point. Most jobs finish inside two weeks; a full gut with relocated plumbing runs longer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
The finish package is where a bathroom goes from functional to something you want to look at. Here’s what the decisions really are, and what each one costs you in money or maintenance.
- Vanity: stock, semi-custom, or custom. Stock cabinets from a big-box line are the cheapest and fastest but come in fixed widths that may not fit a 1960s bathroom’s odd alcove. Semi-custom (KraftMaid and similar lines) lets you pick width, depth, and door style for a modest premium. Full custom fits anything but adds weeks and cost. A 48-inch semi-custom vanity with a quartz top sits comfortably in the middle of the range.
- Countertop: quartz vs. granite vs. solid surface. Quartz (Cambria and comparable brands) resists staining and needs no sealing, which matters in a humid coastal bathroom. Granite is natural stone and needs resealing every year or so. Solid surface is the budget option and can be sanded out if scratched.
- Floor tile: porcelain vs. natural stone vs. luxury vinyl. Porcelain is durable, water-resistant, and the default choice. Natural stone (marble, travertine) looks great but is porous and wants sealing. Luxury vinyl plank is the budget and DIY-friendly option, but it won’t last like tile and reads as a downgrade at resale.
- Wall tile: full height vs. wainscot. Full-height tile protects the whole wall and looks more finished, but adds square footage and cost. Wainscot-height tile stops at 4 feet and saves money, though it leaves painted drywall above the shower splash zone.
- Fixtures: finish and brand tier. Chrome is the cheapest durable finish; brushed nickel and matte black sit above it. Kohler and similar mid-to-premium brands cost more upfront but hold up and have parts available. Builder-grade fixtures are cheaper and fail sooner.
What Vanities, Tile & Fixtures Costs in Marina del Rey, CA
Plan on $9,000 – $28,000 for the full vanities, tile & fixtures package. A vanity-only swap with a quartz top and new faucet runs $800 – $3,000. A full bathroom tile and fixture package lands in the wider range. The table below breaks out the common line items:
| Bathroom vanity installation (cabinet, top, sink, faucet) | $800 – $3,000 |
| Floor tile, porcelain, standard layout | $2,000 – $6,000 |
| Wall tile, wainscot or full height | $2,500 – $7,000 |
| Fixture replacement (toilet, faucet, shower trim) | $1,500 – $4,500 |
| Labor and prep (demo, substrate, waterproofing) | $2,200 – $7,500 |
What pushes a job toward the high end: large-format or natural stone tile (more cutting, more waste, flatter substrate required), relocating the vanity drain or supply lines (opens the wall, adds plumbing labor), adding a heated floor or new exhaust fan tied to a new circuit, and a condo building that requires specific waterproofing for the unit below. What keeps it low: same-size vanity in the same spot, standard porcelain tile in a simple grid layout, and fixtures in a common finish. Every written estimate from us is line-itemed and fixed-price, so the number you see is the number you pay. And if the vanity and tile work is part of a Bathroom Remodeling in Marina del Rey that also touches the shower or layout, we scope that as one project.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey Homes Specifically Do to This Job
Marina del Rey is mostly 1960s – 1980s mid-rise and condo complexes, with contemporary high-rise and townhome infill around Admiralty Way and Washington Boulevard, plus a few surviving 1950s – 60s beach-era bungalows. That stock changes this job in ways inland contractors don’t plan for. The marine layer and salt-laden onshore air attack metal fasteners and fixtures fast; we’ve pulled vanity faucets on Admiralty Way condos with the chrome pitted and the supply valve seized because the salt fog rolls in nightly and the bathroom vents were undersized. Older units with cold-framed walls and no insulation sweat on the wall side of the shower tile, so waterproofing and a properly ducted exhaust fan matter more here than in dry inland houses. Nearly every project is a remodel or rebuild inside an existing envelope because buildable land is scarce, which means the plumbing and electrical you inherit are the plumbing and electrical you work around. Condo HOA rules often dictate noise hours, elevator use for materials, and waterproofing specs for anything above another unit. We cover Marina del Rey and the surrounding beach cities through our Marina del Rey service area, and if your project includes new exterior tile or roof work, homeowners often pair this with Tile Roofing in Marina del Rey or Specialty Roofing in Marina del Rey while trades are on site.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Vanities, Tile & Fixtures in Marina del Rey
Most Marina del Rey vanity, tile & fixture jobs take 2 – 3 weeks from demo to final walkthrough. Tile setting and cure time account for 4 – 6 of those days; the rest is substrate prep, fixture setting, and final touch-up. Larger jobs with relocated plumbing can run longer. Call (888) 427-1733 for a timeline based on your specific bathroom.
Usually no for a straight vanity or tile replacement, but yes when you relocate plumbing, add an electrical circuit, or change the fixture layout. The City of Los Angeles handles permits for the 90292 ZIP, and condo projects may need HOA approval on top of that. We pull permits when the scope requires it and confirm what’s needed during the free estimate.
Yes, and that’s the most common way we do it. Keeping the vanity in the same footprint and the toilet and shower drains where they are avoids opening walls and keeps the job in the 2 – 3 week window. Relocating a drain or supply line means opening the wall and adding plumbing labor, which moves the price and timeline up.
A vanity replacement in Marina del Rey runs $800 – $3,000, depending on cabinet quality, countertop material, and whether the drain and supply lines stay put. A quartz top and a semi-custom cabinet land mid-range; a stock cabinet with solid surface is the low end. Call (888) 427-1733 for an exact line-item quote, estimate is free.
Every vanity, tile & fixture project is covered by our 730-Day Done Right Promise: if the workmanship fails, we make it right. Tile that debonds, a leak at a newly set fixture, or grout that cracks from poor prep all fall under it. We back the work in writing, and you get the documentation at the final walkthrough.
Get Your Free Vanities, Tile & Fixtures Estimate in Marina del Rey
Call (888) 427-1733 to schedule a free on-site estimate for vanities, tile & fixtures in Marina del Rey. We’ll look at your existing layout, confirm what stays and what moves, and hand you a written line-item quote with a fixed price so you know exactly what the job costs before we start. Calls are answered by a live person 24/7. Our technicians have up to 12 years of experience, and our Bathroom Remodeling team handles everything from single-bath updates to full builds.