A Groundwork company - serving Los Angeles, CA
Garage Conversion ADU in Santa Monica, CA | Groundwork Construction Co. of Los Angeles

Garage Conversion ADU in Santa Monica - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Santa Monica: What It Costs and How Long It Takes

A garage conversion ADU in Santa Monica typically runs $45,000 – $130,000 and takes 4 – 7 months from permit submittal to final inspection, depending on whether you’re keeping the existing slab and walls or re-framing the structure. The work turns an existing garage into a permitted, separately addressable living unit with its own kitchen, bathroom, sleeping area, and utility connections. Call (888) 427-1733 for a free on-site estimate and a written, line-item scope before anyone swings a hammer.

Call (888) 427-1733

How a Garage Conversion ADU Comes Together, Stage by Stage

Every conversion follows the same spine, and the order matters more than most homeowners expect. Here’s what actually happens and when you’ll be asked to make decisions.

Stage 1: Feasibility and pre-design (weeks 1 – 2)

We measure the garage, check ceiling height against the 8-foot minimum most conversions need, confirm the setback from the property line, and pull the parcel’s zoning and any overlays. You decide here whether you’re keeping the existing footprint or bumping walls out. This is also where we flag whether the garage shares a wall with the house or stands detached, because that changes both the fire separation requirements and the cost.

Stage 2: Design, engineering, and permit submittal (weeks 3 – 8)

Plans get drawn, a structural engineer signs off on any header or foundation changes, and the package goes to Santa Monica’s plan-check desk. This is the slowest stretch, and it’s the one homeowners underestimate. You approve the layout, the window and door schedule, and the exterior finish at the end of this stage. Nothing gets built until the permit is issued and posted.

Stage 3: Demo and rough-in (weeks 9 – 13)

Old garage doors and tracks come out, the slab gets evaluated and patched or replaced, and framing for interior walls and bathrooms goes up. Plumbing, electrical, and HVAC rough-in follow, then the first inspection. These are the messy weeks. You’ll want the driveway clear and a plan for where the debris bin sits, since Santa Monica driveways are often short.

Stage 4: Insulation, drywall, and finishes (weeks 14 – 19)

Insulation, drywall, tape and texture, then flooring, cabinets, countertops, and fixtures. This is where the finish budget lives or dies, and where you’ll make the most choices. We sequence the trades so the countertop templating doesn’t wait on the cabinet install, which is where a lot of conversions lose two weeks.

Stage 5: Final inspections and closeout (weeks 20 – 28)

Final building, electrical, plumbing, and mechanical sign-offs, then the certificate of occupancy. We walk the unit with you, correct the punch list, and hand over the warranty paperwork. Coastal-zone parcels can add time here if the Coastal Development Permit runs alongside the building permit.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make Between

A conversion isn’t one decision, it’s about a dozen. These are the ones that move both the outcome and the number.

  • Existing slab vs. new slab. Reusing a sound, level slab saves real money. If it’s cracked or out of level, we pour new, which adds cost but gives you proper vapor barrier and a flat finish floor.
  • Keep the garage door opening or infill it. Infilling with framed wall and stucco gives you a real exterior wall and better insulation. Keeping the opening with a glass door or storefront system looks sharp but costs more and needs impact-rated or wind-rated glazing if you go that route.
  • Kitchenette vs. full kitchen. A compact galley with a two-burner cooktop, under-counter fridge, and 24-inch sink fits tighter footprints. A full kitchen with standard appliances needs more room and more electrical.
  • Bathroom position. Keeping the bath near the existing sewer line is the single biggest cost saver. Moving it across the slab means breaking concrete and re-routing drain lines.
  • Separation from the main house. A detached or semi-detached garage gives cleaner privacy and simpler fire separation than one sharing a wall with the house.
  • Exterior materials. Stucco matches most Santa Monica housing stock; fiber cement siding holds up better to salt air on some elevations. We use materials from brands like Sakrete for concrete work where the spec calls for a known, consistent mix.

What a Garage Conversion ADU Costs in Santa Monica, CA

Plan on $45,000 – $130,000 for the full conversion, permitted and finished. That range is wide because the variables are genuinely wide.

The four things that push a job toward the high end:

  • Structural work. A new foundation, a re-framed roof, or a wall removal that needs a header and engineer’s stamp can add tens of thousands.
  • Utility relocation. Moving the bathroom or kitchen across the slab, upgrading the electrical panel, or trenching a new sewer line all cost real money.
  • Size and ceiling height. Bigger footprint and taller ceiling both mean more material. Most standard two-car garages land mid-range.
  • Finish grade. Builder-grade finishes vs. custom cabinetry, tile, and lighting can swing the interior budget by $20,000 or more.

A written estimate from us lists each line item: demo, framing, MEP rough-in, insulation, drywall, finishes, permits, inspections, and cleanup. What it typically excludes: the architectural plan set if you’re using your own designer, any landscape or hardscape work outside the garage, and furniture. We give you the number up front and stick to it. No change orders you didn’t approve.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Santa Monica Homes Specifically Do to This Job

Santa Monica’s housing stock sets the terms for this work in ways you won’t see a mile inland. South of Wilshire and through Ocean Park, 1920s-to-1940s Spanish and Craftsman bungalows often have single-car garages with low ceiling heights and old slab-on-grade foundations. The 1960s and ’70s wood-frame buildings along Lincoln and Pico were built to different standards, and some parcels have soft-story retrofit work already underway or scheduled, which can affect how you sequence a conversion. In the 90402 flats, the garages tend to be larger and the finish expectations higher.

Two Santa Monica realities slow the calendar: plan-check is notoriously deliberate, and any parcel inside the coastal overlay needs Coastal Commission sign-off before the building permit is final. Salt air off Santa Monica Bay corrodes flashing and fasteners faster than inland, and the June Gloom-to-dry-summer cycle cracks stucco and stresses waterproofing. We spec exterior materials for that cycle. For wider project scope, this work frequently sits inside a Home Additions & ADU in Santa Monica plan, and homeowners often pair the interior finish with Cabinets & Countertops in Santa Monica and Backsplash, Tile & Flooring in Santa Monica once the shell is up. We cover the full scope across Santa Monica, including the 90401, 90406, 90407, and 90408 ZIPs, and our Home Additions & ADU service covers everything from feasibility to final inspection.

Serving Santa Monica, CA – Our Local Coverage Area

We serve Santa Monica and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Santa Monica

Get a Free Estimate on Your Santa Monica Garage Conversion ADU

We start with a free on-site walk-through: we measure the garage, check ceiling height, review the parcel’s zoning and any coastal overlay, and talk through the layout options that fit your budget. You’ll get a written, line-item estimate with the full scope spelled out. Our technicians have up to 12 years of experience, and projects over $10,000 get $1,000 off. Financing is 0% for 18 months. Call (888) 427-1733 to schedule.

Written by the team at Groundwork Construction Co.

Why Santa Monica Chooses Groundwork Construction Co. of Los Angeles

We set the standard for garage conversion ADU in Santa Monica.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Santa Monica

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

Trusted by homeowners across Santa Monica and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Garage Conversion ADU in Santa Monica?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Santa Monica.

(888) 427-1733

Request a Free Estimate in Santa Monica

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Local Service Coverage
Call Now - 24/7 Dispatch