Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Palos Verdes Estates, CA: What to Expect
Cabinets & Countertops in Palos Verdes Estates, CA typically run $14,000 – $45,000 for a full kitchen’s worth of both, with cabinet installation at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 on their own. A straightforward layout with stock or semi-custom boxes and a mid-grade stone top moves in 3 to 5 weeks from demo to final caulk. Call (888) 427-1733 to schedule a free on-site estimate.
How We Run a Cabinet & Countertop Job, Stage by Stage
This isn’t a vague handoff. Here’s the actual sequence, what gets decided when, and how long each stage takes on a typical 90274 kitchen.
Stage 1: Measure and Template (Day 1, about 2 hours)
We laser-measure the room, check wall plumb and floor level, and photograph every appliance connection. Homes on sloped lots here rarely have a perfectly square kitchen, so we note the out-of-square walls up front – that single step prevents the “cabinet won’t sit flush” surprise on install day. You decide the cabinet door style and finish at this visit, not later.
Stage 2: Demo and Prep (Days 2 – 3)
Old cabinets, counters, backsplash and the old sink come out. We cap the plumbing, label every circuit at the panel, and patch and level the walls behind the cabinets. If you’re relocating a sink or range, this is when the rough plumbing and electrical go in. You decide during this window whether the new layout shifts anything under the floor.
Stage 3: Cabinet Install (Days 4 – 6)
Base cabinets first, leveled and shimmed, then uppers anchored into studs. We set the cabinet boxes and hang the doors and drawers the same week so you can see the room take shape. You decide hardware placement (pulls, knobs, soft-close upgrade) before the doors go on – after the fact, every hole is a patch.
Stage 4: Countertop Template and Fabrication (Days 7 – 14)
Stone and quartz get templated on-site after the cabinets are set, then fabricated in a shop. That gap is real, usually 5 to 10 working days, and it’s the stage homeowners most often forget to plan around. You finalize the edge profile and sink cutout before template – those can’t change after.
Stage 5: Counter Install, Backsplash and Final (Days 15 – 21)
Slab goes down, seams are set and caulked, sink and faucet reconnect, and the backsplash goes up. Final walkthrough catches alignment, drawer action and seam placement. You sign off on the whole job, and our 730-Day Done Right Promise covers what we installed and how we installed it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
- Stock cabinets: Pre-built boxes in standard sizes, lowest price point (often $4,000 – $7,000 for base and uppers). Fast and reliable, but limited in width and finish, so odd walls get filler strips.
- Semi-custom cabinets: The sweet spot for most Palos Verdes Estates homes – made to your dimensions, dozens of door styles, $8,000 – $13,000 typical. Worth it when the room isn’t square.
- Full custom: Built to the inch, best for hillside homes with unusual wall runs. Pricier and longer lead time; we quote it separately so the difference is on paper.
- Quartz: Non-porous, no sealing ever, engineered color consistency. The default for busy kitchens. Runs $2,000 – $6,500 installed depending on linear feet.
- Granite: Natural slab, every piece unique, needs periodic sealing. Durable and forgiving, but pattern matching across seams is harder.
- Butcher block and solid surface: Warmer feel, easier on dropped dishes, budget-friendly for islands or secondary prep zones.
Real brands matter here: KraftMaid and Cambria are two of the partners we work with most for cabinet and quartz selections, and they’re stocked with the finish and edge options that hold up to a coastal climate. We quote the actual products, not a generic allowance.
What Cabinets & Countertops Costs in Palos Verdes Estates, CA
Expect $14,000 – $45,000 for cabinets and countertops together in a full kitchen. Here’s roughly where a written estimate breaks down:
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation: $3,000 – $10,000
What pushes a job to the low end: standard cabinet sizes, quartz or laminate tops, no layout changes, existing plumbing staying put. What pushes it to the high end: custom cabinetry, large slab runs, relocating the sink or range, wall or floor repair behind old cabinets, and hillside homes where the floor level is off by an inch or more.
A written estimate includes cabinet boxes, doors, finish, counter fabrication and install, caulk and final walkthrough. It usually doesn’t include appliance resupply, new flooring under the new cabinets, or any structural work – those get quoted separately so there are no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Palos Verdes Estates Homes Specifically Do to This Job
Palos Verdes Estates is a fully built-out, master-planned city from the Olmsted Brothers’ 1920s design. That means almost every kitchen job is a remodel inside a 1950s – 1970s custom rancher or split-level, not new construction. The city’s own Art Jury and Planning Commission review exterior design changes, and while cabinets and counters are interior work, any window, door, or vent change we make around the kitchen has to clear that review first – a step contractors from Torrance or Redondo Beach routinely underestimate.
Inside those homes we see the same failure modes again and again: original cabinets sagging at the hinges after decades of use, countertops that were last updated in the 1980s, and walls that aren’t square because the house was built into a hillside. Marine-layer humidity and salt air from the Pacific pit chrome and brass hardware faster than inland, so we spec finishes that won’t show rust in a few years. On downhill properties, drainage concerns mean we check for moisture at the wall behind old cabinets before we install anything new. We cover all of Palos Verdes Estates, ZIP 90274 included, on a schedule that respects the weather windows.
Serving Palos Verdes Estates, CA – Our Local Coverage Area
We serve Palos Verdes Estates and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Palos Verdes Estates
A standard job takes 3 to 5 weeks from demo to final, with the countertop fabrication gap accounting for most of the calendar. The install itself is usually 2 to 3 weeks of work. Call (888) 427-1733 for an exact timeline based on your kitchen.
Straight cabinet and counter replacement usually doesn’t require a permit; relocating plumbing, electrical, or structure does. Palos Verdes Estates also triggers its Art Jury review for any exterior changes made as part of the project. We pull the permits and pass the inspections – you don’t chase the paperwork.
Yes, and it’s the most common way we do it. Same-size cabinet boxes and a like-for-like countertop keep the project simple and near the low end of the $14,000 – $45,000 range. Moving the sink or range is possible and adds both cost and time.
No – the number in your written estimate is the number you pay. If we find hidden damage (rotted subfloor, a bad wall), we stop and quote the fix in writing before touching it. That’s how our upfront pricing works.
Every job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers our workmanship on install, seams, and fit. Call (888) 427-1733 for the free estimate and we’ll walk you through it.
Get a Free On-Site Estimate for Cabinets & Countertops in Palos Verdes Estates
Call (888) 427-1733 to schedule a free on-site estimate and design consult for your cabinets & countertops in Palos Verdes Estates. A live person answers 24/7, no voicemail. On the visit we measure the room, talk through three cabinet and counter options with real numbers, and leave you with a written line-item bid. $1,000 off projects over $10,000, and 0% financing for 18 months if you need it. If the cabinet work is part of a wider Kitchen Remodeling in Palos Verdes Estates project, we scope it together. Our Kitchen Remodeling team handles the full build. Homeowners often pair it with Walk-In Showers & Shower Remodeling in Palos Verdes Estates or a Tub-to-Shower Conversion in Palos Verdes Estates for a whole-home refresh. Find us on our Palos Verdes Estates service-area page.
Written by the team at Groundwork Construction Co.