Tub-to-Shower Conversion in Palos Verdes Estates: Cost, Timeline, and What Actually Happens
A tub-to-shower conversion in Palos Verdes Estates runs $3,500 to $10,000 and usually takes 5 to 10 working days from demo to final walkthrough. The job means pulling the tub and its surround, reworking the drain and waterproofing, and setting a new shower base or a tiled pan in the same footprint. Most 90274 conversions stay inside the existing alcove, so the plumbing doesn’t move. Call (888) 427-1733 for a free on-site estimate.
Key takeaways:
- Typical Palos Verdes Estates range: $3,500 – $10,000, with most alcove swaps landing in the $5,000 – $7,500 band.
- Most jobs finish in 5 – 10 working days once materials are on site.
- Permits are usually required when the drain or valve is altered; we handle that step.
- Every conversion carries our 730-Day Done Right Promise.
How we run a tub-to-shower conversion
Every conversion follows the same five stages. Here’s what happens, in order, so you know what to expect before anyone swings a hammer.
- Day 1 – Demo and inspection. We pull the tub, surround, and any old backer board, then open the wall enough to inspect the valve, drain, and framing. You find out here whether the drain needs reworking or the framing is sound. This stage typically takes a full day.
- Day 2 – Rough plumbing and electrical. If the shower valve, drain, or a new light moves, we set it now, then schedule the rough-in inspection. You decide on valve brand and finish at this point. This stage runs 1 to 2 days.
- Day 3 – Waterproofing and backer. We install cement or foam backer board, tape and seal the seams, and roll on a bonded waterproofing membrane at the walls and pan. This is where the job is won or lost; a bad pan shows up as a leak years later. Budget a full day.
- Days 4 – 6 – Tile, base, and glass. We set tile or drop in a prefab pan and surround, grout, then measure for the glass enclosure. Glass fabrication adds 7 to 10 days, so we often hand off a usable shower and return for the door.
- Final day – Fixtures, trim, and walkthrough. We hang the showerhead, valve trim, and any grab bars, caulk, clean, and walk the job with you. You sign off against a written checklist, and the 730-Day Done Right Promise starts the day we finish.
You’ll make most of your decisions before demo: tile, pan type, valve finish, and whether you want a niche. Locking those early keeps the 5-to-10-day schedule honest. Change the tile mid-job and the timeline moves.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What you’ll choose between
The choices below decide both how the shower feels and what the job costs. Here are the real trade-offs.
- Prefab pan and surround vs. full tile. A prefab acrylic unit is fast, watertight, and cheaper, around the low end of the range. Full tile looks custom and adds a few thousand dollars and a few days, but gives you control over size and pattern. Prefab suits a rental or a fast flip; tile suits a home you plan to keep.
- Tile material. Porcelain is the workhorse: dense, resistant to the coastal damp, and honest on price. Natural stone like marble or travertine looks richer but needs sealing every year or two and dislikes the salt-heavy marine air. Large-format tile means fewer grout lines to scrub.
- Shower base type. A pre-sloped foam pan (like a Schluter-style system) saves time and installs over a solid subfloor. A mud-set pan lets us match an odd alcove exactly but adds labor.
- Glass and enclosure. A framed slider is the budget option. A frameless glass panel or door looks cleaner and runs toward the higher end, but you’ll want the glass measured after tile so the fit is exact.
- Valve and fixtures. A pressure-balance valve is standard. A thermostatic valve with a separate volume control gives you precise temperature and costs more. Kohler and similar lines are what we typically specify, with finishes chosen to match the rest of the bath.
What a tub-to-shower conversion costs in Palos Verdes Estates, CA
Plan on $3,500 to $10,000 for a tub-to-shower conversion in Palos Verdes Estates. A straightforward alcove swap with a prefab pan sits near the low end; a tiled shower with a frameless enclosure, new valve, and relocated drain lands near the top.
Here’s what moves the number:
- Size and alcove shape. A standard 60-inch alcove is the easy case. A wider or irregular opening means custom glass and more tile.
- Existing condition. A tub set into a concrete slab, hidden water damage at the framing, or a rusted drain flange all add demo and repair time.
- Whether plumbing, electrical, or structure move. Keep the drain and valve where they are and you save real money. Moving the drain across the floor or adding a light and fan can add $1,000 or more.
- Material grade. Prefab acrylic vs. porcelain tile vs. natural stone is the single biggest swing on the finish side.
- Permit scope. Permits are usually required when the drain or valve changes. We pull them, so the number you see is the number you pay.
A written estimate includes demo, disposal, backer and waterproofing, the base and tile or prefab unit, standard fixtures, and permit handling where needed. It typically doesn’t include glass fabrication if your design calls for a custom door, or tile you select above the quoted grade. We spell out both on the line-item quote so there are no surprises later. Call (888) 427-1733 for an exact figure.
See the difference
Before
After
Before
After
Before
AfterWhat Palos Verdes Estates homes specifically do to this job
Palos Verdes Estates is a fully built-out, master-planned city laid out by the Olmsted Brothers in the 1920s, so the work here is remodel and rebuild, not new construction. Most of the homes we open are 1950s – 1970s custom ranchers and split-levels on large hillside lots, and that shows up the moment we pull a tub: original single-pane glass, cast-iron drains, and framing that’s older than most of what we touch. On sloped lots we watch for the structural surprises that follow years of settling.
The city’s Art Jury and Planning Commission approve exterior design changes, which matters less for an interior shower swap but a lot if you’re pairing the conversion with exterior work. If your conversion is part of a bigger upgrade, we handle it under one roof through bathroom remodeling and our Bathroom Remodeling in Palos Verdes Estates. The marine-layer humidity and salt air that push homeowners toward Metal Roofing in Palos Verdes Estates also accelerate corrosion on old shower valves and drain lines, so we inspect those before we close a wall. We cover the full Palos Verdes Estates hillside, including the neighborhood around Via Horcada and Via Nogales. And if the roof over the bath is due, many homeowners pair the conversion with fresh Tile Roofing in Palos Verdes Estates to knock both projects out in one permit cycle.
Serving Palos Verdes Estates, CA – Our Local Coverage Area
We serve Palos Verdes Estates and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – tub-to-shower conversion in Palos Verdes Estates
A typical conversion takes 5 to 10 working days, with custom glass adding 7 to 10 days on top. Demo and waterproofing drive the schedule. Call (888) 427-1733 for a timeline built around your bath.
You need a permit when the drain or shower valve changes, which most conversions do. We pull the permit and coordinate the rough-in inspection as part of the job. Ask on the estimate and we’ll confirm the scope for your address.
Yes, in most cases. Keeping the drain and valve in place is what lands a conversion in the $3,500 – $5,000 range. Moving either one is where the price climbs.
Expect $3,500 to $10,000 depending on size, existing condition, and finish grade. A prefab alcove swap sits low; a tiled shower with custom glass sits high. Call (888) 427-1733 for an exact quote; estimates are free.
Every conversion carries our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If something we built isn’t right, we make it right. We’ll walk you through the terms on the estimate.
Get a free tub-to-shower conversion estimate
Call (888) 427-1733 to schedule a free. on-site estimate for your Palos Verdes Estates bath. We’ll measure the alcove, photograph the drain and valve, and hand you a written line-item quote with a fixed price and a realistic timeline. Estimates are free, calls are answered by a live person 24/7, and the number you see is the number you pay.