Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Culver City, CA: What the Work Actually Involves
Cabinets & countertops in Culver City typically run $14,000 to $45,000 for a full tear-out and replacement, and most jobs take two to four weeks from demo to final caulk. You’re looking at cabinet removal, layout verification, new box and door installation, then templating and setting stone or quartz tops, with a plumber and electrician on and off for a couple of days. Call (888) 427-1733 to set a free on-site estimate; we’ll measure, check the walls, and write the number in front of you.
How we run a cabinet and countertop job, start to finish
Every kitchen is different, but the sequence holds. Here’s what actually happens, and when you have to make a decision.
- Day 1: demo and reveal. We pull old cabinets, shut off and cap the plumbing and electrical, and protect the flooring. This is the day surprises show up: soft drywall behind the sink, an old vent stack nobody mapped, or wall studs that aren’t where the last remodel claimed. You’ll get photos and a call before anything gets framed. Demo runs one to two days.
- Days 2 to 3: layout and rough-in. If we’re moving a sink, adding a dishwasher circuit, or relocating a range, this is when it happens. You decide appliance sizes and final layout now, because changing your mind after rough-in is what blows a budget. We verify the wall is plumb and shim and furr as needed so the boxes sit square.
- Days 4 to 8: cabinet install. Base cabinets set and leveled, uppers hung and anchored into studs (not just drywall), fillers cut, crown and light rail fitted. You’ll want to have your door style, finish, and hardware picked well before this stage, since lead times run three to six weeks on semi-custom boxes.
- Days 9 to 11: template and set counters. Stone and quartz get templated after the cabinets are in and level, then fabricated and set, usually five to ten working days later. You pick the slab before this point, not after.
- Days 12 to 14: finish work. Sink and faucet set, dishwasher hooked up, outlets trimmed out, toe kick and caulk done, and a walkthrough where we run water and power and check every door and drawer.
That’s the honest shape of it. The gaps between stages are real, and they’re driven by fabrication and delivery, not by us standing around.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’re actually making
Cabinets and counters are two budgets running in parallel, and each has a grade that makes sense for a different homeowner. Here’s the honest trade-off on each.
- Stock vs semi-custom boxes: Stock is fast and the cheapest, but the sizing is fixed and you feel it in the corners. Semi-custom gets you the depth and width you need, which matters most in the tight galley kitchens common to Culver City homes.
- Solid wood vs MDF vs plywood frames: Solid wood doors hold up beautifully and cost the most. MDF doors paint clean and stay flat but don’t love repeated moisture. Plywood boxes beat particleboard every time in a coastal basin.
- Quartz vs granite vs butcher block: Quartz is non-porous, uniform, and easy to live with. Granite is natural and each slab is one of a kind, but it wants sealing. Butcher block is warm and forgiving but needs oiling, and it scratches.
- Slab thickness and edge: 3cm is standard. A mitered or chunky edge adds labor and looks substantial in a large kitchen; a simple eased edge keeps the number down.
- Hardware and finish: Soft-close slides and full-extension drawers are worth the upgrade. Matte finishes are trending but show fingerprints more than you’d think.
We carry a curated portfolio here, including KraftMaid cabinetry and Cambria quartz, so you’re choosing between quality options rather than whatever’s in stock. What we don’t do is talk you into a slab you’ll regret in two years.
What cabinets and countertops cost in Culver City, CA
For the full job, budget $14,000 to $45,000 in Culver City. Cabinet installation alone runs $4,000 to $13,000; countertop installation $2,000 to $6,500; a kitchen island adds $3,000 to $10,000; backsplash adds $800 to $2,500. Those are line items, and they stack.
What pushes a job toward the high end:
- Size and layout: A galley with 12 linear feet is not a U-shaped 25-foot kitchen. Linear footage drives cabinetry cost directly.
- Existing condition: Soft drywall behind the sink, out-of-plumb walls, and old galvanized plumbing are common in 1920s-40s homes. Each one adds framing, drywall, or a plumbing line.
- Moving services: Relocating a sink, adding a dishwasher circuit, or shifting the range means a plumber and electrician and a longer timeline.
- Material grade: Semi-custom cabinets and a slab of Cambria land near the top; stock boxes and a laminate top land near the bottom.
- Permit scope: A like-for-like swap is generally simpler than one that moves plumbing or electrical, which usually triggers a permit and an inspection.
A written estimate from us includes demo, haul-away, cabinet and counter install, trim-out, and cleanup. What it doesn’t include by default is appliance cost, a stone slab upgrade above the quoted allowance, or structural changes found behind the wall. We say so up front, in writing. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Culver City homes specifically do to this job
Culver City is a production hub bordered by protected single-family neighborhoods, and that split shows up in the housing stock we work on. In Carlson Park and Sunkist Park, we’re regularly inside 1920s-40s Spanish bungalows where the walls behind the old cabinets are original wood lath under stucco, and where the clay tile roof above means any ceiling work has to account for heavy brittle material. The lots are small, which is why the kitchens are often tight and the cabinet layout is the whole ballgame. Near Sepulveda and Washington, the 1950s-60s ranchos and dingbats present differently: shallower service walls, older panel wiring, and a higher chance of finding unexpected plumbing when the cabinets come out.
The design side matters too. The Carlson Park Historic District runs through the city’s Cultural Affairs Commission design review, and even minor facade changes can be stopped there, so we plan cabinet and counter changes around what the exterior will allow. Culver City is also in a high seismic zone, so we anchor uppers into studs and back them correctly rather than relying on drywall plugs. Coastal moisture from the basin works on stucco and wood detail year-round, which is another reason we favor plywood boxes over particleboard.
This is part of the broader Kitchen Remodeling in Culver City work we do, but the cabinet and counter job stands on its own if the layout is sound. We cover all of Culver City, including 90232, 90230, 90231, and 90233.
Serving Culver City, CA – Our Local Coverage Area
We serve Culver City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about cabinets and countertops in Culver City
Plan on two to four weeks for a standard Culver City kitchen, with stone fabrication adding five to ten working days in the middle. The cabinet stage itself is about five days; the waiting on slab cut is the longest single gap, so lock in your slab early. Call (888) 427-1733 for a timeline tied to your exact scope.
Usually no, if it’s a like-for-like swap with no moved plumbing or electrical. Once you relocate a sink, add a circuit, or shift the range, you’re into permit territory, and we pull it and see the inspection through. We’ll tell you which side of that line your job falls on during the free estimate.
Yes, and that’s the most common job we do. Keeping the sink, range, and dishwasher in place means no permit, a shorter timeline, and a lower number. If the layout is fighting you, we’ll show you what moving one service adds in dollars before you decide.
A mid-range job, semi-custom boxes and quartz, lands roughly in the $20,000 to $30,000 band of our $14,000 to $45,000 range. That includes demo, install, and trim-out. Call (888) 427-1733 for a written line-item estimate, free on site.
Every cabinet and countertop job we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing. Material warranties from manufacturers stack on top.
Get a free cabinets and countertops estimate in Culver City
Call (888) 427-1733 to schedule a free on-site estimate. We’ll measure the kitchen, check what’s behind the old boxes, and walk you through the layout, the material grades, and a written line-item price with no change orders. A live person answers around the clock. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off. We bring the plan; you make the call.
Written by the team at Groundwork Construction Co.