Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Calabasas, CA: What It Actually Takes
A full kitchen remodeling in Calabasas usually runs $14,000 to $45,000 and takes 6 to 10 weeks from demo to final inspection, depending on whether you move plumbing, gas, or walls. That covers tearing the room down to studs and subfloor, new cabinets, counters, backsplash, lighting, flooring, and appliances, plus the permits the City of Calabasas requires. Call (888) 427-1733 and we’ll walk your actual kitchen over the phone before anyone sets foot inside.
How a Full Kitchen Remodeling Moves, Stage by Stage
We don’t hand you a start date and disappear. Here’s the sequence, and what you decide at each step so nothing stalls waiting on you.
Weeks 1-2: Design, measurements, and permits
We measure the room, confirm what’s behind the drywall (old wiring, undersized gas lines, and load-bearing walls are the usual surprises in 1960s-70s Calabasas ranch homes), and lock the layout. You pick cabinet door style and finish, countertop slab, and appliance package here. Permit drawings go to the City of Calabasas, and plan review is where hillside and fire-zone properties add time, since the same review that covers a kitchen often crosses into structural or WUI paperwork on sloped lots.
Weeks 2-3: Demo and rough-in
Day one is protection and demo. By day three the room is open to studs, and the trades stack: plumbing rough-in first, then electrical, then HVAC if you’re relocating a range hood or adding makeup air. Any framing changes happen now, before inspections. You confirm final outlet and switch locations at this point, because after drywall goes up, moving an outlet is a change order and a delay.
Weeks 3-4: Inspections and closing the walls
The City inspects rough plumbing, electrical, and framing before insulation and drywall. We schedule it, we’re on site for it, and we don’t drywall until it passes. This is the stage that separates a real full kitchen remodeling job from a cosmetic refresh: inspections are the paper trail that protects your resale and your insurance.
Weeks 4-8: Cabinets, counters, tile, and finishes
Drywall, paint, cabinet install, then template and fabrication of your countertop. Slab lead time is the single biggest schedule variable, so you approve the slab early. Backsplash, flooring, lighting trim, and appliance hookups follow. You’ll be without a working kitchen for roughly three to four of these weeks. Most Calabasas homeowners set up a temporary sink and microwave station in the dining room or garage and plan for it.
Weeks 8-10: Final walkthrough and sign-off
Final inspection, punch list, and a walkthrough where we test every drawer, every switch, every appliance. Anything off gets written down and corrected. The whole job is covered by our 730-Day Done Right Promise, so if something fails later, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the budget swings on four decisions. Here’s the honest trade-off on each.
- Cabinet boxes and doors. Stock cabinets are the cheapest route but rarely fit a kitchen with an odd wall or a soffit. Semi-custom (KraftMaid is a partner we work with often) lets you size to the room and choose the finish, at mid-range cost. Full custom buys exact proportions at a premium. Plywood boxes outlast particleboard in a hot, dry climate where humidity swings are real.
- Countertop material. Quartz is the default: low maintenance, uniform, and forgiving of a busy household. Natural stone (granite, marble) brings character but stains and needs sealing. Butcher block and laminate sit at the budget end. Slab selection and edge profile change the number more than most people expect.
- Flooring. Porcelain tile handles spills and pets best; luxury vinyl plank is the value play and warmer underfoot; engineered hardwood suits open-plan layouts but wants a mat under the sink area.
- Appliances and ventilation. A pro-style range demands a properly sized hood and, in a tight build, makeup air. Decide here before the electrical rough-in, not after.
If the wider project pulls in adjacent rooms, that’s a fuller scope, and you can see how we frame the whole of it on our Kitchen Remodeling in Calabasas page. Many homeowners also pair this with Full Bathroom Remodeling in Calabasas while the house is already torn up.
What Full Kitchen Remodeling Costs in Calabasas, CA
Expect $14,000 to $45,000 for a full kitchen remodeling in Calabasas. The number you land on depends on five things:
- Room size and layout. A galley versus an open-plan kitchen with an island changes cabinet count, counter square footage, and labor.
- Existing condition. Old galvanized plumbing, aluminum wiring, or a wall that turns out to be structural all add cost once the walls open.
- Moving services. Relocating a sink, range, or gas line adds plumbing, gas, and permit scope. Keeping fixtures in place is the cheapest full remodel you can do.
- Material grade. Cabinet and counter choices are the biggest lever, and appliance package is next.
- Permit scope. A layout change, new structural opening, or window alteration carries more review than a like-for-like replacement.
Your written estimate breaks out demolition, rough-in, cabinetry, countertops, tile, labor, and permit fees line by line. It excludes things that can only be priced once walls open, like hidden water damage, and we flag those in writing before doing the work. Upfront pricing means the number you see is the number you pay. There’s also $1,000 off projects over $10,000 and 0% financing for 18 months if you want to spread the cost.
See the difference
Before
After
Before
After
Before
AfterWhat Calabasas Homes Specifically Do to This Job
Calabasas sits in the Santa Monica Mountains foothills, so a lot of what we build is on hillside and canyon lots. That shows up even in a kitchen: sloped sites mean engineered foundations and retaining walls below, and the City’s hillside and oak-tree ordinances can trigger arborist review and setbacks that reshape a plan before cabinets are ordered. Post-Woolsey Fire rebuild standards add another layer, and because Calabasas sits in a Very High Fire Hazard Severity Zone, Chapter 7A ignition-resistant details often come into play near exterior walls and vents.
Housing stock matters too. We work across the Mediterranean and Spanish-style custom estates in The Oaks, Calabasas Hills, and Mulholland Heights, alongside 1960s-70s ranch homes and canyon rebuilds, and the older homes bring the hidden plumbing and wiring surprises that drive scope. The same dry, windy climate that raises fire risk also ages exterior hardware fast, which is why we spec corrosion-resistant fasteners and hardware on anything near an exterior door.
Serving Calabasas, CA – Our Local Coverage Area
We serve Calabasas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked About Full Kitchen Remodeling in Calabasas
Plan on 6 to 10 weeks from demo to final inspection, longer if you move plumbing, gas, or structural walls or if the permit review crosses into structural or fire-zone scope. Call (888) 427-1733 for a timeline based on your actual kitchen.
Yes, most full kitchen remodeling in Calabasas requires permits for plumbing, electrical, and any structural or gas work, and the City of Calabasas inspects before walls close. We pull the permits and manage the inspections. Call (888) 427-1733 with your address and we’ll confirm the scope.
Yes, and it’s the most budget-friendly approach: keeping the sink, range, and walls where they are avoids extra plumbing, gas, and structural scope. You still get new cabinets, counters, tile, lighting, and appliances. Call (888) 427-1733 and we’ll tell you what’s realistic without moving services.
Most Calabasas projects land between $14,000 and $45,000, driven by room size, existing condition, material grade, and permit scope. Call (888) 427-1733 for an exact written quote; the on-site estimate is free.
Every full kitchen remodeling project is covered by our 730-Day Done Right Promise, and if something isn’t right, we make it right. Calls are answered by a live person around the clock. Call (888) 427-1733 to get started.
Get a Free Estimate on Your Full Kitchen Remodeling in Calabasas
Call (888) 427-1733 to book a free on-site estimate for your full kitchen remodeling in Calabasas. On the call we’ll ask about your kitchen’s age, layout, and what you want changed, then schedule a visit where we measure, talk materials, and hand you a written line-item estimate. A live person answers 24/7, and our technicians have up to 12 years of experience. You can also see how we serve the wider area on our Calabasas page and pair projects like Walk-In Showers & Shower Remodeling in Calabasas for a full-house refresh.
Written by the team at Groundwork Construction Co.