Full Kitchen Remodeling in Los Angeles: What It Really Takes
Full kitchen remodeling in Los Angeles means gutting the room to the studs and rebuilding it – cabinets, counters, backsplash, sink and fixture, flooring, lighting, ventilation, and often the rough plumbing and wiring behind the walls. Most single-family kitchens here take 6 to 10 weeks of active construction once permits clear, and plan on 4 to 8 weeks of city review before that in most cases. Expect to spend $16,520 to $53,100 depending on size, condition, and finish level. Call (888) 427-1733 and we’ll walk you through what your kitchen actually needs.
How a Full Kitchen Remodeling Project Runs, Stage by Stage
A full kitchen rebuild has a rhythm, and knowing it keeps you from making decisions on the wrong day. Here’s how we sequence it and what you own at each point.
Stage 1: Design and permits (weeks 1 – 6)
We measure, capture existing conditions, and draw the plan. You decide layout, cabinet line, and counter material now – not later. Permits get pulled for anything structural, electrical, plumbing, or mechanical; most Los Angeles kitchen remodels need them for at least one of those trades.
Stage 2: Demo and rough-in (days 1 – 6)
Day 1 is protection and demo. By day 3 the room is down to framing and we can see what’s actually behind the walls – old knob-and-tube, galvanized pipe, or a beam somebody cut in 1974. You approve any discovered-condition change in writing before we move forward. Rough plumbing, electrical, and HVAC run during this window.
Stage 3: Rough inspections and drywall (days 7 – 14)
The city inspects framing, electrical, plumbing, and mechanical before anything gets closed up. We don’t schedule drywall until we have sign-off. Once the walls close, we tape, texture to match, and prime.
Stage 4: Cabinets, counters, and finishes (days 15 – 38)
Cabinets land first, then the template for counters, then counter install, sink, and faucet. Backsplash, flooring, and paint follow. The template-to-install gap on stone counters is typically 7 to 10 days.
Stage 5: Trim, punch, and final inspection (days 39 – 55)
Pulls, hardware, lighting trim, and appliance hookup close it out. Final inspection, then a walkthrough with you where we write down anything you flag on a punch list and clear it. Most projects land inside that window; a structural surprise or a back-ordered cabinet line is what pushes it longer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Kitchen
These are the decisions that move both the look and the budget. Pick them early.
- Cabinet construction and finish. Framed vs. frameless, plywood vs. particleboard boxes, painted vs. stained vs. thermofoil doors. Painted MDF doors look great and cost less; they also chip at corners in a busy kitchen. KraftMaid offers solid configurations at a mid-to-high price point.
- Counter material. Quartz is the low-maintenance pick – no sealing, uniform look. Natural stone (granite, marble) wears character but needs sealing and can stain. Cambria is a strong quartz option we specify often.
- Layout change or not. Keeping the sink, range, and fridge where they sit saves significantly on plumbing and electrical rough-in. Moving them opens the room’s potential and adds real cost.
- Structural work. Removing a wall to open the kitchen to the dining room means a beam and possibly a post. That’s a structural permit and engineering, and it’s worth doing only if the layout truly needs it.
- Ventilation. A hood that actually vents outside, not recirculates, matters for a kitchen that gets real use. Ducting through a wall or roof adds scope but pays off in air quality and resale.
- Flooring. LVP handles water and kids and installs faster. Tile holds up but is colder underfoot. Refinishing existing hardwood is a legitimate budget saver if the boards are sound.
What Full Kitchen Remodeling Costs in Los Angeles, CA
Full kitchen remodeling in Los Angeles runs $16,520 to $53,100 for a typical single-family kitchen. A small or partial rebuild sits lower – $10,620 to $23,600 – while cabinet installation alone lands $4,720 to $15,340 and countertop installation $2,360 to $7,670.
What pushes a job toward the top of the range:
- Size and layout. A 120 sq ft galley costs far less than a 250 sq ft open-plan kitchen with an island. Island installation alone runs $3,540 to $11,800.
- Existing condition. Undersized wiring, galvanized pipe, dry rot, or a badly framed wall turn a clean job into a repair job.
- Relocating services. Moving the sink or range means new drain lines, venting, and circuits – a real line item you should see spelled out.
- Material grade. Stock cabinets vs. a sem-custom line like KraftMaid, laminate vs. quartz (Cambria), vinyl vs. hardwood flooring. These compound across the whole room.
- Permit and structural scope. Any wall removal, beam, window change, or new mechanical work adds review time and trade cost.
A written estimate from us is line-item: demo, rough-in, inspections, cabinetry, counters, backsplash ($945 to $2,950), flooring, fixtures, labor, and permit fees. It states what’s included and what isn’t, so the number you see is the number you pay. We don’t leave “TBD” on the sheet.
See the difference
Before
After
Before
After
Before
AfterWhat Los Angeles Homes Do to This Job
Kitchens here are rarely a simple swap. The city’s housing stock is a patchwork – 1920s to 1940s Spanish Colonial and Craftsman bungalows on the flats, postwar 1950s to 1960s stucco tract homes, and thousands of 1960s and 1970s wood-frame dingbats – and each era brings its own surprises to a gut remodel. In the older bungalows off Echo Park and Silver Lake, we regularly open walls to find knob-and-tube wiring and original galvanized plumbing that has to be replaced before anything else can proceed. In the hills, everything changes.
Los Angeles construction answers to some of the strictest seismic and fire-zone rules in the country. Kitchen remodels on hillside lots in the Hollywood Hills and the Santa Monica Mountains run into pier-and-grade-beam foundation realities and slope engineering, and any structural wall change there means engineering review, not just a permit. That’s before you get to wildland-urban-interface fire code: ignition-resistant detailing and materials increasingly apply to the hillside neighborhoods where the Santa Ana winds drive fire into the urban edge. In the postwar flats, electrical service is the common bottleneck – a faithful kitchen rebuild often requires a panel upgrade to carry the new circuits.
We work the whole city and the neighborhoods around it, including Culver City and Santa Monica, and the permitting reality is the same story in each: our kitchen remodeling service pulls the permits and carries the project through inspection so you’re not the one chasing sign-offs. Homeowners often pair this with full bathroom remodeling in Los Angeles to keep the same crew and schedule across both rooms.
Serving Los Angeles, CA – Our Local Coverage Area
We serve Los Angeles and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in Los Angeles
Plan on 3 to 4 months from contract to final inspection for a typical single-family kitchen. Roughly half of that is design and permitting with the city; the build itself is 6 to 10 weeks. Add time for long-lead cabinet orders. Call (888) 427-1733 for a scheduling estimate specific to your kitchen.
Yes, if you’re moving plumbing, electrical, or mechanical, changing the layout, or touching structure – which most full remodels do. We pull the permits and handle inspection on your behalf. Call (888) 427-1733 and we’ll tell you exactly what your scope requires.
Yes, and it’s often the smartest financial path. Keeping the sink, range, and fridge in place avoids new rough-in and structural work while still delivering a completely new kitchen – cabinets, counters, backsplash, flooring, lighting. Cabinets-and-counters only runs $4,720 to $15,340 and $2,360 to $7,670 respectively; a full rebuild without relocation sits toward the lower end of the $16,520 to $53,100 range. Call (888) 427-1733 for a quote.
Between $16,520 and $53,100 for a single-family kitchen, depending on size, existing condition, layout changes, and finish grade. Small or partial kitchen remodels run $10,620 to $23,600. Call (888) 427-1733 for a free, line-item estimate.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it covers our labor and installation. Call (888) 427-1733 to talk through what’s covered.
Get a Free Estimate on Your Los Angeles Kitchen
Call (888) 427-1733 to schedule a free on-site estimate for full kitchen remodeling in Los Angeles. A live person answers, day or night. We’ll measure the room, talk through your layout and finish options, and hand you a written line-item quote with a fixed price – no change-order surprises, 0% financing for 18 months, and $1,000 off projects over $10,000. Homeowners on both projects often pair this with walk-in showers and shower remodeling in Los Angeles to keep the same crew on both rooms.