Cabinets & Countertops in Los Angeles, CA: What the Job Actually Costs and How Long It Takes
Cabinet and countertop work in Los Angeles runs $16,520 – $53,100 for a full tear-out and replacement, and most of our jobs finish in 2 – 4 weeks once materials land. Cabinet installation alone typically lands between $4,720 and $15,340; countertop installation between $2,360 and $7,670. Your exact number depends on linear footage, whether you’re relocating a sink or range, and how much of the existing layout survives. Call (888) 427-1733 for a free on-site estimate.
How the cabinets & countertops job runs, stage by stage
We don’t hand you a date and hope. Here’s the real sequence, with the decisions you’ll make at each stop.
Stage 1 – Site visit and field measure (day 1, about 90 minutes). We measure every wall, check for out-of-square corners and floor dips, and photograph the plumbing and electrical behind the existing cabinets. You’ll decide then whether the layout stays put or moves. Moving a sink, a range, or a dishwasher typically adds several thousand dollars and a permit, so this is the highest-leverage choice on the whole job.
Stage 2 – Design and product selection (5 – 10 business days). You pick cabinet door style, finish, and box construction, then countertop material and edge profile. We bring samples, not photographed swatches. This is also when you settle on backsplash tie-in, hardware, and whether you’re adding a pantry run or an open shelf wall.
Stage 3 – Order and permit (3 – 6 weeks of lead time, generally). Semi-custom cabinet lines are the long pole on most jobs; stock lines move faster but limit your sizing. If the plan includes electrical or plumbing relocation, we pull the permit now and schedule the rough inspection. In Los Angeles, you do not want to discover a permit problem after the cabinets are set.
Stage 4 – Demo and prep (2 – 3 days). Out come the old boxes and tops. We check the wall for rot, patch and level as needed, and set up temporary water if the sink is coming out. Dust containment goes up before demo, not after.
Stage 5 – Cabinet install, template, countertop, finish (7 – 12 working days). Cabinets are set and shimmed to level first, usually 2 – 4 days. Then the countertop shop templates the actual installed boxes, which means your tops are cut to the real kitchen, not the drawing. Fabrication adds 5 – 10 business days for quartz and stone. Install of the tops is one day, then backsplash, hardware, and final caulk.
Inspection, if permits were pulled, comes after the rough-in and again at final. We handle the scheduling and meet the inspector on site.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
- Stock vs. semi-custom cabinets. Stock lines are the fastest and cheapest route and work when your walls are close to standard. Semi-custom buys you exact widths and solves the awkward corner or the short run beside the fridge. Full custom is a luxury finish with a 10 – 16 week lead time and the highest price.
- Cabinet box material. Plywood boxes hold up better around the sink over a 15-plus year horizon; particleboard boxes cost less and perform fine if they never see water. Spend the money where moisture lives.
- Quartz vs. natural stone vs. butcher block. Quartz is non-porous and forgiving, which suits busy households. Granite and marble need sealing and are more prone to stain and etch. Butcher block warms a room and takes scratches, but it needs oiling.
- Slab thickness and edge. Standard 2cm or 3cm slabs, with edge profiles from a simple eased edge up to a built-up mitered edge that reads thicker than it is.
- Drawers vs. doors. Drawers in the base cabinets cost more per unit and are the single upgrade most people say they’d repeat.
- Under-cabinet lighting and outlets. Easy to add during the tear-out, expensive to add later. Decide now.
What Cabinets & Countertops costs in Los Angeles, CA
Plan on $16,520 to $53,100 for a full kitchen’s worth of new cabinets and countertops, with a small or partial run landing in the $10,620 – $23,600 range. Five things push a job toward one end or the other:
- Linear footage and cabinet count. A 10-foot galley and a 25-foot wall-and-island kitchen are different jobs entirely.
- Layout changes. Moving the sink, range, or dishwasher means plumbing, electrical, and often a permit. Keeping the layout is the biggest single cost saver.
- Cabinet grade. Stock versus semi-custom versus custom moves the number by thousands, not hundreds.
- Countertop material. Quartz and stone slabs price by the square foot and by the slab; laminate and butcher block sit far lower.
- Existing condition. Out-of-square walls, floor leveling, old galvanized plumbing, or knob-and-tube wiring behind the boxes all get discovered in demo and priced before we proceed.
A written estimate should spell out cabinet brand and line, countertop material and square footage, edge profile, demo and haul-away, and whether permit fees are included. It should also say what isn’t covered: appliance purchase, flooring, painting, and any structural work found mid-job. Our pricing is upfront with no change orders unless the scope genuinely changes.
See the difference
Before
After
Before
After
Before
AfterWhat Los Angeles homes specifically do to this job
Los Angeles construction answers to some of the strictest seismic and fire-zone rules in the country, and that reality reaches into a cabinet job more than you’d expect. In the 1920s – 40s Spanish Colonial and Craftsman bungalows around Silver Lake, Echo Park, and the flats of Koreatown, we regularly find walls that have settled and moved over nearly a century. Cabinets get scribed and shimmed to real walls, not square ones. In the postwar 1950s – 60s stucco tracts across the Valley, the boxes are usually straight but the plumbing is old, and a sink relocation means cutting and re-venting. Hillside homes in the Hollywood Hills and Santa Monica Mountains sit on pier-and-grade-beam foundations, which can translate to floors with more give than a flat lot. And in the ’60s – 70s dingbat and soft-story buildings being systematically retrofitted under the city’s Soft-Story Retrofit Ordinance, we time cabinet work around the structural work, not the other way around. If your job is part of a full Kitchen Remodeling in Los Angeles, the sequencing gets planned from day one. Homeowners often pair this with Walk-In Showers & Shower Remodeling in Los Angeles or a Tub-to-Shower Conversion in Los Angeles when they’re reworking the whole home’s finishes at once. We cover all of Los Angeles and the surrounding neighborhoods, and this work fits inside our broader Kitchen Remodeling service.
Serving Los Angeles, CA – Our Local Coverage Area
We serve Los Angeles and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Los Angeles
Expect 2 – 4 weeks of active work once materials arrive, plus 3 – 6 weeks of cabinet lead time before that. The install itself is about 7 – 12 working days: 2 – 4 for cabinets, 5 – 10 for countertop fabrication after template, and about a day each for tops and finish work. Call (888) 427-1733 for a timeline built around your specific kitchen.
Straight swap-in-place work usually doesn’t require a permit; moving plumbing, gas, or electrical does. Keeping the sink and range where they are is the biggest permit saver. We tell you up front which camp your job falls into, pull what’s needed, and meet the inspector. Call (888) 427-1733 with your layout and we’ll tell you.
Yes, and most of our Los Angeles jobs go that route. Same-size boxes in the same footprint with new doors, tops, and hardware transforms a kitchen without touching water or gas lines. If you want a different sink position or a range relocation, that’s a bigger scope and we’ll price it separately so you can compare. Call (888) 427-1733 to talk it through.
Full replacement typically runs $16,520 – $53,100, with cabinet installation at $4,720 – $15,340 and countertop installation at $2,360 – $7,670. A small or partial run lands around $10,620 – $23,600. Material grade, linear footage, and layout changes drive the spread. Call (888) 427-1733 for an exact quote – estimates are free.
Every cabinets and countertops job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Manufacturer warranties on cabinets and countertops pass through to you as well. Call (888) 427-1733 to schedule your free estimate.
Get a free estimate for cabinets & countertops in Los Angeles
Call (888) 427-1733 and a live person answers, day or night. We’ll set a free on-site estimate where we measure your kitchen, walk the plumbing and electrical, and hand you a written line-item quote with no surprises – the number you see is the number you pay. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off. Our technicians have up to 12 years of experience and arrive background-checked and in uniform.
Groundwork Construction Co. of Los Angeles is licensed and insured and stands behind every job.
Written by the team at Groundwork Construction Co.