Fence
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & paversFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Chain Link Fence in Marina del Rey, CA: What It Costs and How Fast It Goes In
A chain link fence in Marina del Rey typically runs $3500–$9000 for a residential run, and most jobs are finished in one to three days once the layout is set and any property-line questions are settled. The number lands where it does because of two things: footage and gate count, plus how much of the run sits in tight side yards, over old concrete, or along a shared property line. Call (888) 427-1733 for a free on-site estimate and a written line-item price before anyone digs a hole.
How We Install a Chain Link Fence, Stage by Stage
The sequence below is what you’re paying for. It’s also where cheap chain link quotes fall apart, usually at stage two.
Stage 1: Walk the line and confirm the boundary (day one, 45–90 minutes)
We measure the run, find the corners, and mark the gate positions with you. In Marina del Rey that conversation is mostly about access: how a truck reaches the side yard, whether the only route is through a shared garage, and where materials can be staged without blocking a neighbor’s parking pad or a condo lane. You decide gate swing direction and width at this point. Changing it later means re-cutting posts.
Stage 2: Utility locate and layout (same day, up to 2 business days for the locate)
Before a single hole is dug, we call for a utility locate and let the markings dry. This is the step a lot of low bids skip. On dense marina parcels, irrigation lines, low-voltage landscape wiring, and old gas stubs sit closer to the surface than anyone expects. You don’t have to do anything here except confirm nobody’s parked over the marked line.
Stage 3: Demo and set posts (day two, 4–7 hours)
Old fence comes out and goes to the dumpster or a haul-away trailer. Posts go in at 8 to 10 feet on center, set in concrete and left to cure. Line posts are typically 2-3/8″ and terminal or corner posts thicker, with concrete depth matched to the post size and local frost-free depth. You’ll pick the post cap style here if you haven’t already.
Stage 4: Rails, mesh, and tension (day two or three, 3–5 hours)
Top rail, tension wire or bottom rail, then the mesh, pulled and tied with the tension bars at each terminal. This is where the fence either feels solid or doesn’t. We walk the finished run with you and show you where the fabric sits relative to grade.
Stage 5: Gates, hardware, and final walkthrough (day three, 1–2 hours)
Gate frames hang level, latches align, and we check the swing against the post line. You get the walkthrough, the warranty in writing, and a clean site. Total elapsed time on most Marina del Rey jobs: three days including the utility locate, weather and access permitting.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Chain Link Choices You’ll Actually Make
Chain link isn’t one product. These are the decisions that move your number and how long the fence lasts near the water.
- Gauge of the mesh. Residential is usually 11-1/2 or 12 gauge; 9 gauge is the heavier commercial weight and costs meaningfully more per foot but resists denting and sagging. Given the salt air here, we lean heavier on the long runs.
- Coating. Galvanized is the value pick; vinyl-coated (usually bonded black or green) adds cost but holds up far better against marine corrosion and reads as a quieter, more finished fence in a tight side yard. Near the water, coated is often the better money spent.
- Post size and spacing. Standard 2-3/8″ line posts on 8-10 foot centers are fine on flat ground. Longer spans, corners, and gates need heavier terminal posts or the fence sags within a season.
- Top rail vs. tension wire. A top rail gives the fence its rigid profile and supports privacy slats; tension wire is cheaper and lower-profile but flexes more.
- Gates and hardware. Pedestrian gates, double drive gates, and self-closing hinges all add cost. Decide now whether the gate has to swing clear of a driveway or a shared walkway.
What a Chain Link Fence Costs in Marina del Rey, CA
Residential chain link in Marina del Rey runs $3500–$9000. The five variables that push a job toward either end:
- Linear footage. The biggest driver. Short side-yard runs sit near the low end; a full perimeter of a townhome lot moves toward the high end.
- Access. Tight urban lots, no alley load, and material carried by hand instead of dropped by a truck add labor. This is the Marina del Rey premium most quotes miss.
- Existing conditions. Old concrete footings, buried fence, or a run that has to go over a retaining wall all add demo and prep.
- Gate count and type. A pedestrian gate and a double drive gate can add several hundred dollars over a straight run.
- Material grade. 9-gauge vinyl-coated over standard galvanized is a real step up in price and lifespan.
A written estimate includes demo and haul-away, utility locate, posts set in concrete, mesh and hardware, gates hung, and the workmanship warranty. It typically excludes permit fees where a permit is required, any tree removal, and repairs to landscaping or concrete the fence line disturbs, which we call out before work starts. When this is part of a full Fence Installation in Marina del Rey, the scope and pricing are handled together.
See the difference
Before
After
Before
After
Before
AfterWhat Marina del Rey Homes Do to a Chain Link Job
Nearly every project here is a waterfront-adjacent remodel or rebuild, and the coastal environment is the main design driver. The marine layer and onshore salt-laden air put constant corrosion pressure on metal fasteners, railings, and fence hardware, and the salt fog rolls off the water nightly. That’s why galvanized steel left uncoated shows rust staining fast on a 1970s Admiralty Way condo, and why we spec coated mesh and coated hardware on most Marina del Rey work rather than treating it as an upgrade. Housing stock is dominated by 1960s–1980s mid-rise apartments and condos plus contemporary townhome infill, lightly sprinkled with surviving beach-era bungalows and small commercial strips along Washington Boulevard. Little ground-up single-family construction happens here because buildable land is scarce; most of what we fence is shared property lines, side yards, and small condo lots. Dense parcels mean tighter clearances and more HOA coordination than inland work. If you’re also reworking the ground the fence ties into, homeowners often pair this with Concrete Driveways & Concrete Work in Marina del Rey or Asphalt Driveways & Resurfacing in Marina del Rey. We cover the full Marina del Rey area, and this is part of our broader Fence Installation service.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Chain Link Fence in Marina del Rey
Most residential chain link runs take one to three days once the utility locate clears. Small side-yard runs finish in a day; full perimeters with multiple gates run closer to three. Access and parking constraints on dense marina lots are the usual reason a job stretches past one day. Call (888) 427-1733 for a timeline on your specific property.
Permits depend on height, lot location, and whether the fence sits on a shared property line, so it’s worth confirming before ordering materials. We handle the permit and inspection steps where they apply as part of the written scope. Call (888) 427-1733 and we’ll walk you through what your property requires.
In most cases, yes. Chain link has small concrete footings at each post, so disruption is limited to the post points rather than a continuous trench. Where the run crosses irrigation, a retaining edge, or a shared wall, we plan the layout around it at stage one. Call (888) 427-1733 to have us look at the line first.
Residential chain link in Marina del Rey runs $3500–$9000, driven by footage, access, existing conditions, gate count, and material grade. Coated mesh, heavier gauge, and extra gates move the number up; a short straight run stays low. Call (888) 427-1733 for an exact quote, with a written line-item estimate.
Chain link installed by our team is covered by the 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers workmanship on posts, mesh, and gates, and it’s written down, not buried in fine print. Call (888) 427-1733 for the details in your estimate.
Get a Free Chain Link Fence Estimate in Marina del Rey
Call (888) 427-1733 for a free on-site estimate on your chain link fence in Marina del Rey. A live person answers around the clock, and we’ll set a time to walk the property line, confirm gate positions and access, and hand you a written line-item price with no surprises. Most estimates take under an hour on site.
Written by the team at Groundwork Construction Co..