Concrete driveways and concrete work in Marina del Rey run $4,500 – $12,000 for a full driveway pour, and most driveways finish in 3 – 5 working days plus a 7-day cure before you park on them. A replacement runs $5,000 – $14,000 when the old slab has to come out. Call (888) 427-1733 and we’ll walk your Marina del Rey driveway, look at the soil and the drainage, and hand you a written line-item number before any concrete gets ordered.
The sequence we actually follow on a Marina del Rey concrete pour
Concrete is unforgiving. You get one shot at the pour, and every step before it decides whether the slab you get in ten years is flat and crack-free or a cracked pancake. Here’s how a driveway job runs when we do it here.
Day 1: Saw-cut, tear-out and haul-off
We saw-cut the old slab along the property line, break it out with a mini-excavator, and haul the rubble off in dumpsters. On a 1960s Marina del Rey property that’s often 4 inches of old concrete over a base that’s never been compacted properly. This takes one to two days depending on access. You decide here whether the new slab goes back at the same grade or drops 2 inches for better drainage.
Day 2: Excavation and base prep
We dig down 6 – 8 inches, remove the old subbase, and bring in Class II base rock compacted in 2-inch lifts with a plate compacter. This is the step most contractors skip and the reason so many Marina del Rey driveways crack within three years. You’ll see us running a string line and level to grade the slope away from the garage.
Day 3: Forming, rebar and inspection
We set forms along the edges, lay #4 rebar on a 16-inch grid or welded wire mesh, and tie it all on chairs so the steel sits mid-slab. If the driveway ties into the public right-of-way, we schedule the city inspection before the pour. You decide expansion joint locations and whether you want a control-joint pattern that reads clean or a decorative one.
Day 4: Pour, finish and cure start
A 4,000 PSI mix gets placed, screeded, floated and finished. Broom finish is standard; you can choose smooth trowel or an exposed-aggregate finish at this stage. We cut control joints within 24 hours so the concrete cracks where we want it, not where it wants.
Day 5 and beyond: Strip, seal, cure
We strip forms the next morning and apply a cure-and-seal compound. You keep vehicles off for 7 days and heavy loads off for 28. If you’re pairing the driveway with a broader exterior overhaul, this is where a full Driveway & Pavers in Marina del Rey project can pick up the walkway and stoop work in the same mobilization.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The concrete driveway options we’d steer you through
Concrete isn’t one product. The mix, reinforcement, finish and joint plan you pick all change the price and the lifespan. Here are the choices that actually come up on Marina del Rey jobs.
- Standard 4,000 PSI broom-finish slab: the workhorse for a residential driveway. Runs $4,500 – $9,000 for a typical two-car apron. Good grip, low maintenance, and the honest trade-off is that broom finish stains faster than sealed surfaces, so we seal it every 3 – 5 years.
- Reinforced slab with #4 rebar grid: adds roughly 10 – 15% to the price over wire mesh. Worth it where the subgrade is soft or the driveway sees heavy vehicles. On marina-adjacent lots the base is often sandy fill, so we almost always push for rebar here.
- Stamped or colored concrete: runs toward the top of the $4,500 – $12,000 band. Looks like stone or pavers, but the salt air and fog fade surface colorants over 8 – 10 years faster than inland. If you’re considering stamped, look at the dedicated stamped concrete option in our Driveway & Pavers service before you commit.
- Exposed aggregate: a textured, grippy finish that hides tire marks well. Softer underfoot than broom, but the surface holds dirt in the pitting and takes more pressure-washing.
- Fiber-reinforced mix: polypropylene fibers cut micro-cracking during cure. Costs a bit more per yard, adds no structural strength on its own, and works best when combined with rebar and a properly compacted base.
We work with Sakrete bagged products for smaller patch and repair jobs and pour from ready-mix suppliers for full driveways, so the mix you get is what the engineer signed off on.
What Concrete Driveways & Concrete Work costs in Marina del Rey, CA
Budget $4,500 – $12,000 for a full concrete driveway installation in Marina del Rey. A replacement that requires tearing out an existing slab runs $5,000 – $14,000. A reseal if the existing slab is sound sits at $250 – $700. Those are the numbers you should expect to see on a written estimate, not an opening bid.
Five variables move the price:
- Square footage: a single-car apron is at the low end; a long shared-entry driveway to a marina townhome pushes to the high end.
- Access: tight lots along Admiralty Way or Via Marina mean a mini-excavator instead of a full-size machine and hand wheelbarrowed concrete, which adds labor hours.
- Base conditions: sandy fill, buried utility lines, or old tree roots mean deeper excavation and more base rock.
- Finish and decorative work: stamped, colored or exposed aggregate add 20 – 40% over broom finish.
- Drainage and grading: if the driveway needs a channel drain, French drain, or re-grading to meet a garage slab properly, that’s a real line item, not an afterthought.
What’s included: tear-out, haul-off, base prep, rebar or mesh, forms, the pour, control joints, and cure-and-seal. What typically isn’t: permit fees if the driveway crosses a public sidewalk or ties into the curb (those get passed through), new drainage hardscape, or landscape restoration after excavation.
See the difference
Before
After
Before
After
Before
AfterWhy Marina del Rey concrete jobs age differently than inland pours
Marina del Rey sits in a salt-air coastal zone, and that changes what happens to metal, fasteners and drainage on every driveway we build here. Galvanized steel, rebar chairs and even form stakes corrode faster when the marine layer sits on the property each morning. On a 1970s Admiralty Way condo property we regularly find the old slab’s control joints had rust staining where wire mesh was laid too close to the surface. We set all steel with proper cover and use rust-inhibiting coatings where the driveway abuts the garage slab or a low retaining wall.
What also matters here: marina construction is dominated by dense multifamily and condo renovation, not ground-up single-family builds, so most of our driveway work is on 1960s – 1980s mid-rise and townhome properties where a unique HOA review governs color, finish and slope. A few surviving 1950s beach-era bungalows along Washington Boulevard carry original slabs that have never been replaced. The good news is rainfall is low so pour scheduling is rarely storm-delayed; the bad news is that the rare atmospheric river will test your drainage overnight, so we grade everything to move water off the garage pad fast. Permits typically come from the local building department and involve a right-of-way encroachment permit when the driveway meets the curb. If you’re weighing a bigger rebuild, homeowners often pair a new driveway with a Garage Conversion ADU in Marina del Rey, and we tune the driveway slope and finish to match the converted structure.
Serving Marina del Rey, CA – Our Local Coverage Area
We serve Marina del Rey and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Concrete Driveways & Concrete Work in Marina del Rey
A standard concrete driveway takes 3 – 5 working days from tear-out to final finish, plus 7 days of foot and vehicle cure. Larger or decorative driveways can run up to 7 – 10 working days. We schedule around HOA approval and any right-of-way permit windows. Call (888) 427-1733 and we’ll give you a calendar date for your specific driveway.
A permit is required when the driveway ties into a public sidewalk, curb or right-of-way, and your HOA architectural committee almost always has its own approval process on top. A driveway fully on private property with no right-of-way tie-in often does not require a permit, but we confirm before we lift a shovel. We pull permits and manage the inspection schedule for you.
Sometimes. If the existing slab is structurally sound and has no significant cracking or settling, we can pour a 2 – 4 inch concrete overlay. That saves roughly 20 – 30% over a full replacement. But if there’s base failure, roots underneath, or the slab has heaved, an overlay will fail with it within a few seasons, and we’ll tell you that straight. Call (888) 427-1733 for a free estimate that tells you which side of that line your driveway sits on.
Every concrete driveway we pour is covered by our 730-Day Done Right Promise: if the workmanship isn’t right, we make it right. That covers settling, premature cracking from our base prep, and finish defects. It doesn’t cover damage from vehicle loads above residential grade or root heave from trees on your neighbor’s property. If you’re planning a new structure nearby, a New Detached ADU in Marina del Rey also triggers a driveway apron review, and we can coordinate both scopes.
Not on our written estimates. The number you see is the number you pay, and any change you request gets a fresh written line item before work continues. We only adjust pricing if you ask for a scope change during the job. Call (888) 427-1733 for a free estimate and we’ll walk you through your Marina del Rey driveway on-site.
Ready for a real number on your Marina del Rey driveway?
Call (888) 427-1733 to schedule a free on-site estimate for Concrete Driveways & Concrete Work in Marina del Rey. We’ll measure the driveway, check base conditions and drainage, review HOA requirements with you, and give you a written line-item quote with a firm price. Estimates are free, financing is available at 0% for 18 months, and projects over $10,000 take $1,000 off. Background-checked, uniformed crews, and a live person answers whether you call mid-morning or Saturday night.
Written by the team at Groundwork Construction Co.